PROTIK GANGULI
Email: *************@*****.***
**************@**********.***
To lead as a domain expert in field of power plant cycle engineering and steam turbine thermodynamics utilizing Ten years of experience.
Sound knowledge and work ability in following technical softwares:
Skoda Turbine in-house software for HMBD preparation.
Steam Pro & Steam Master (Thermal cycle)
GT Pro & GT Master (Simple & Combined Gas Turbine Cycle)
Auto CAD, Microsoft office
Doosan Skoda Power Pvt. Ltd.
Basic Design Engineer- HMBD Level- II
Service tenure: Sept ’15 – Till Date
Toshiba Power System Corporation (India) Pvt. Ltd.(Wholly owned subsidiary of Toshiba Plant Systems & Services Corporation, Japan)
Role: Assistant Manager (Thermal Division)
Service tenure: Feb ’14 – Sept ‘15
Development Consultants Pvt. Ltd. (India branch of The Kuljian Corporation, Philadelphia) Role: Senior Design Engineer (Export Cell)
Service tenure: June ‘09 – Jan ‘14
Thermax Ltd. (Power Division)
Role: Executive (Site Engineer)
Service tenure: Jul ‘06 - May ‘09
OBJECTIVE
SOFTWARE KNOWLEDGE
WORK EXPERIENCE
Cost effective solution from thermodynamic point of view towards R&D activity for development of new model specifically to meet market demand.
Engineering of Thermal Power Plant cycle & Combine Cycle based on site conditions & plant rating using Steam Pro/Master & GT Pro/Master respectively. This activity is applicable for proposal stage as well as detail engineering stage.
Ability to work as project/package owner and coordination with other disciplines for smooth progress.
Preparation & analysis of Heat & Mass Balance Diagram, Thermal Calculation of Power cycles.
Preparation of basic engineering & specifications of various main equipments like Boiler (PF Fired
& FBC type), Turbine (Condensing, Back Pressure & Induction), Boiler Feed Pump (Variable & Constant Speed), Heaters (H.P & L.P), Deaerator & other process pipings.
Sound knowledge on international codes like Heat Exchanger Institute, ASME (Sec-I, Sec- VII, B.31.1), API (610 & 650) & IBR.
Preparation of P&ID and PFD.
Tender Bid Evaluation, Contract finalization.
Doosan Skoda Power Pvt. Ltd
Playing a key role in development of new steam turbine models suitable for Indian, Asian & Latin American market.
Preparation of Heat & Mass Balance Diagram for below type steam turbines:
• Nozzle governing,
• Sliding Pressure application,
• Reheat/Non-Reheat,
• Backpressure application,
• Controlled extraction application.
Toshiba Power System Corporation (India) Pvt. Ltd. [T.P.S.C (I)] (Wholly owned subsidiary of Toshiba Plant Systems & Services Corporation, Japan)
1. 3 X 55 MW Thermal Power Project, Philippines. (Ongoing) Owner- Minergy Coal Corporation, Philippines. Role of TPSC (I): EPC contractor. My responsibilities are as follows:
o Package owner of Boiler Feed Pump, Deaerator, Feed Water System, and job includes sizing calculation, tender specification preparation.
o Preparation of P&ID of following system being single point responsible for coordination:
Feed Water System.
Auxiliary Steam for Turbine & Pegging Steam for Deaerator.
Turbine by-pass System.
2. Preparation of Heat Balance Diagram & Main Power thermal Cycle for the following project:
Conversion of Process Plant Boiler to Captive power plant of around 5 MW rating evaluating two options like using back pressure turbine and condensing turbine. 3. In house project (Toshiba):
SKILLS
PROJECTS
Boiler Cost Reduction Method: By preparing Various HBDs selecting different HP Steam pressure temperature combination and comparing their performance & boiler cost with that of on-going Minergy project Boiler.
Development Consultant Pvt. Ltd.
(Export Cell)
1. 2 Nos. Simple Cycle GT Power Plant at Tabouk & 3 Nos. Simple Cycle GE frame 7EA GT Power Plant at Al Wadjh, Kingdom of Saudi Arabia (KSA), Client National Contracting Company, KSA, Owner: Saudi Electricity Company, KSA.
• Development of Plot Plan and various area layouts.
• Preparation of piping layout of various area like GT Building area, Fuel Oil Unloading Area etc.
• Cooling Water System (CW) design, Design basis report, PFDs and P&IDs preparation,
• Equipment sizing, Pipe sizing, Pipe thickness calculation for Underground and above ground pipe.
• Preparation of System Description documents for GT Off Base system, GT Drains System, Plant Water system, Compressed Air system.
2. 1 x 100 MW Unit #V Coal fired Hirakud (Indal) Power Plant, Hindlaco, Hirakud,, Orissa
• Role- Lead Engineer, Mechanical for 100 MW (CFBC Boiler) TPP. 3. 1 x 350 MW Coal fired KVK Nilachal PowerProject, Orissa
• Role- Lead Engineer, Mechanical.
4. 1 x 275 MW AEPL Power Project, Bela, Nagpu- Review Engineering. Thermax Ltd. (Power Div.) Site Engineer
1. 1 x 30 MW CPP for Adhunik Metal & Alloys Ltd. – Jamshedpur. 2. 1 x 25 MW CPP for Saurastra Cement Ltd., Porbandar, Gujarat. 3. 2 x 18 MW CPP for Madras Cement Ltd., Jayanthipuram, AP. EDUCATIONAL QUALIFICATION
Qualification Year Board/ university Percentage Result B. Tech.
(Power
Engineering)
2002-2006
College of Engineering-
National Power
Training Institute, India
76.1 First Class Honors
Higher Secondary
(10+2)
2000-2002
St. Xavier’s College,
Kolkata
75.0 First Class With ‘Star’ Marks.
Madhyamic
Pariksha
(10th)
1990-2000
Howrah Zilla School 88.32
(Math-100%,
Physics-94%,
Life Science-
96% &
Mechnaics-92%)
First Class With ‘Star’ Marks.
• Certificate course on Simulation Based Training-Power Plant Operation from WBPDCL- Bakreshwar TPP.
DATE Aug, 2016 PROTIK GANGULI