To: Command Recruitment Date: ** Oct, ****
Sir, Application for Site Engineer Sydney Consulting Engineers Steel Structural Construction Professional & Technologist Multi Discipline
Work – Life – Balance, Physic, Veteran, Multi Discipline Oil/Gas Petrol-Chemical, Fabrication Steel WH Col., SH Beam Portal Frame, Iso Piping Spools, & Test Packs. 64” Sea Water Cooling Supply Pipelines Installation, Anode Cathodes Protection, Fittings: TEEs, 64” x 64”, 64 x 24”, 90, 45, 22.5, 11.5 Degrees elbow and a Tie-In, MLNG Malaysia. * Bin. Crude Oil Terminal, Sarawak. Floating Roof Crude Oil Tank, Dai. 65m x 19.5m welded Tank. Shop & As-built Drawing. Belting Conveyor, Cement Plant Machinery, Power Generation, Diesel Turbine, Generator, Transformer, Fan Cooling Unit Heavy Lift Installation, Saudi Arabia. Witness annual shut down 50Mw Coal Fire Steam Turbine Inspection, Parts, Rota Generator using Digital Laser Trouble shoot Alignment. Malaysia. *01,09,1966 ~14, 07, 1997. Boiler Marker River Gates Fabrication, Utilizing Plasma, Trigonometry, Manually full scale marking, cutting 1800 Tons of Various Size & Thickness Plates. 4-Lane 1 Km Mega Bridge Maritimes Piling. Pre-Stressed Bridge. Dwelling House R. C. Structure Design. *Dwelling House R. C. Structure Design. Various type of Piling, Load Test & PDA *A. Bintulu Port Authority. High Rise Complex, Pre-Stressed Beams & Slab, Multi-Discipline C&S M&E Interface collaboration. *B.Tower Cranes Piled Foundations 1st Silicon Project Fire fighting Sprinkle Lines, HVAC, Sewage System, Kuching. Sarawak, Malaysia. Public Works Dept: *A. 04, 02, 1966 ~ 01, 03, 1968, Road Project, 78 Km Sandakan/Tulupet Sabah Highway, Piled Culverts, Bridges, Embankments, Slope Protection, Compaction, Cut-Fill @ 300 Layers, 98% Density Compaction Macadam Road Construction . 02nd Mar, 1968 ~ 04th Oct, 1974 Senior Engineering Assistant KK, Sabah, Malaysia. *B. 12th Feb, 1997 ~ 10th Apr, 1999 Dalat Water Project, river water in-take Pump Station, Suction & Delivery piled Storage Tank 1000M3 each, 20KM dia.300 Ductile Iron Cement Lined Pipes buried ground, Relay Pump Station Ductile Iron Pipe Bridge, above road level over stream incorporated with Air Valve, where 45o Flange Elbow welded ‘Duck Foot’cast to Footings as thrust Blocks. Spigot mounted vulcanized water resistant ‘O’ ring, snoopy water application & mechanical exertion into Socket. Pipe Line continuous laid to Filtration Plant, Treated Water to 24 Meters Elevated Steel Structure Tower, FRP Water Storage Tanks 507M3 & HDPE pipe welding distribution line Hydro Leak Test 6 bar. Self-Consultancy Project: A. Renewable Energy Establishment, Ministry of Defense Department. B. Bakun Hydro Dam Power Project Malaysia, Civil, C&S, Pump House Building, 8 Nos. 800mw Hydro Power Turbine, Generator,. Heavy Lift, Installation Methodology. C. MLNG Murphy Oil Sarawak, Flare Stack Riser Tower, Steel Structure Shop Drawing. D. Ship Piping, Sea-Chest Piping Manifolds field run, Flexible & Fix Piping Grey, Black Water Piping ^ Water Tank, Fuel Tank /Day Tank Pipe Routing/Power Packs/Mechanical Equipments Installation. E. Home Inter Décor, Innovation Works coordination. Floor Laser Tile finishing. F. Brunei Government Public Works Department: Drainage Refurbishment Up-grade Methodology *01,09,2009 ~ 30,06,2012, Resident Engineer, JEC Consultant Engineers, Minister of Education, Malaysia, Civil Infrastructure Green/Brow Field, swampy Land, referral TBM transfer & establish, GPS to School Complex Work Site, multi-storey Classroom, Teacher Quarters, Archi & finishing, C&S M&E, Light Weight Steel Structure Truss and roofing, progress, QC Check Sheet, adhered to Scope and Specification. 01, 04, 2013 ~ 30, 06, 2014, Civil/Piping/Mach Collaboration Engineer, Static, Rotating Equipments, EPC, Continue Polishing Units Project, (Malaysian)MLNG, Bintulu, Sarawak, Malaysia. Nov, 1014 ~ Jan, 2015, GPS Survey Coordination, Civil Infrastructure, Space Management Sitting, Chalet Refurbishment, Composite Timber & RC Structure, Hilly 40 Meter ASL, Original Tropical Rain Forest, South China Sea-Front 4-Star Chalets, Charioting, Pahang, Malaysia. Thanks
Jason Foo Course attended: *School of Welding, *Heavy Lift *Rigging & Slinging . *Shell Oil/Gas retiree
Task Summary:
Multi Discipline, C&S Structural Design, Arch/Civil/C&S/Mech/Piping/Steel structure O/G fab. Boiler Marker, 1800T Plate, Murphy Oil Flare Stack Riser Shop, As Built, Read Line Mark-up Drawing. Diesel Power Turbine, Generator, Transformer Cement Plant equipments installation. Pre-Stressed Bridge, High Rise Beams, Slab. 78 Km Highway Project. Water in-take Pump Station, Storage Tank. Bakun Hydro Dam Power Heavy Lift, Installation. Resident Engineer, School Projects. (Malaysian)LNG EPC Collaboration Engineer, multi storey M&E, Plumbing and Services, Roofing Steel Structure installation. QA/QC NCR Reports. Discrepancy Ratification. QA/QC Assurance, Civil Infrastructure Development, Belting Conveyor Edible oil Process, Industry Safety Awareness.
Jason CV dd: Oct, 2016
From: Foo Khai Yuen Malaysian Chinese
Correspondence Address: 95, Piasau Lorong 11, 98000 Miri, Sarawak, MALAYSIA
Tele/Fax:006*********
Hand phone : +
E-mail : ********@*****.***
Personal details:
My Card: 380********* Age 78 On Contract Basis
Gender: Male
Marital Status Married
Academic Qualification: Diploma of Architectural Engineering. Hong Kong 1965
B.Sc (Arch) Taiwan 1965
Page 1
13.01.2003 – 30.09. 2003
SHELL REFINING COMPANY ( FEDERATION OF MALAYA ) PORT DICKSION,
NEGERI SEMBELAN, MALAYSIA.
CIVIL STEEL STRUCTURE DESIGN Engineer
General Civil Maintenance Works, Refurbishment,
Drainage & New Laboratory Construction
Architecture, R.C Structure, Drainage M & E including
A/C & Ancillary works
Drainage Facilities
Steel Structure Design and Shop Drawing
19.08.2002 – 30.10.2002
BINTULU PORT AUTHORITY BINTULU, SARAWAK, MALAYSIA.
Main Office & Admin Block ( Multi Storey Office Block )
M & E Coordinator
RWDP Encased in 1400 Dai. R.C. Column
Soil & Waste pipes, Manholes Drainage System
Gen. Set, Lift & Escalator Installation
PA System & Office Automation
Fire Fighting Sprinkles System
Cold Water System
18.01.2002 – 30.04.2002
MLNG DUA BINTULU, SARAWAK, MALAYSIA.
Source Gas Plant Steel Structure Shop Drawings
Steel Structure erection & 36” Dai. Steel Pipe Installation & Hock Up
Gas Pressure Test
18.02.2000 – 31.05.2000
MLNG TIGA BINTULU, SARAWAK, MALAYSIA.
- Piping Supervisor
Test pack of Pipe Spools Installation
11.09.2000 – 09.12.2000
MIRI CRUDE OIL TERMINAL, MIRI SARAWAK, MALAYSIA.
Composite Bridge
Steel Structure & Reinforced Concrete Bridge 48M Span.
300MM Dia. Spun Pile X 3 Random with Pile Cap Abutments Structure
Removal Existing Bailey Bridge & Installation Of composite Structure
Methodology of removal & installation
01.05.1999 – 30.07.2000
1st SILICON, M+W ZANDER S/B, KUCHING, SARAWAK, MALAYSIA.
WEB - FAB
Page 2
* Responsible for Civil, Pipe Works Construction, method statement of Construction Constrain due to facilities. Piping Hydro test, daily lessoning with contractors
12.02.1998 – 10.04.1999
DALAT Water Works, MUKAH, SARAWAK, MALAYSIA.
- Project Coordinator JKR SENIOR CLARK OF WORKS
* Foundation, Piling, Pump house Building, Structure, 24M Height Steel Structure Tower Installation, FRP Water Storage Tanks, Piping & Pumps Installation, Pipeline Hydro Test
01.09.1996 – 14.07.1997
SEJINKAT BRIDGE KUCHING, SARAWAK, MALAYSIA.
Sungai Sarawak Regulations Scheme Kuching
Preussag Noell GMBH ( Metal Gates & Regulation Structure Cutting )
- Mechanical Coordinator
Responsible Marking & Cutting 1800 Tons of Various Size & Thickness M.S Plates for Fabricating Gates Structure
01.08.1995 – 01.06.1996
Sungai Sarawak Regulations Scheme KUCHING, SARAWAK, MALAYSIA.
Daelim- Hock Peng JV ( 1.6 Billion Bridge Construction )
- Project Manager Of Pilings
Monitor the Progress & Schedule of Completion
Method Statement of Pilings & Load Test
I.E. 400, 600 & 1600 Tons Compression Test
315 & 225 Tons Tension Test
17.02.1995 – 30.06.1995
SAUDI CEMENT COMPANY, SAUDI ARABIA
Power Plant Diesel Turbine Installation
- Installation Liaising Supervisor
To Coordinate, responsible sequence & method installation, procedure, lifting, stainless steel piping & Pressure Test
01.03.1994 – 16.02.1995
MLNG DUA BINTULU, SARAWAK, MALAYSIA.
MLNG DUA – Feed Gas Metering Station
- Senior Piping Supervisor
To supervise various type of piping fabrication, heavy lifting of fabricated piping spools
To prepare method Statement of Installation of Tie-In To Live Pipes
To Raise technical query of Discrepancy
01.04.1993 – 15.12.199
Senior Piping Supervisor
Page 3
To supervise welding of Sea Water Cooling Lines for Module 4,5 & 6 MLNG
Installation of 64” Dai. Manifold Tie-In Cooling Lines
Responsible for Heavy Lift of Sea Water Cooling Lines
01.08.1992 – 31.01.1993
SABAH SHELL PETROLEUM COMPANY, SABAH, MALAYSIA.
Labuan Gas Terminal (LGST)
To supervise & Monitor Vegetation removal, site survey, cut & fill to required finish level
Labuan Crude Oil Terminal (LCOT)
LCOT Improvement phase 1 installation of 2 nos. 30 Ton Vessel ( Free Water Knock Out) Drum & Piping HIOCK-UP, Deletion of 2 Nos. 10” Temporary By-Pass Lines, Construction of Conc. Foundation to receive vessels
Replace & Upgrade existing Knock Out Manifold of Circling Piping System
ALFA LAVAL LCOT
Set-up, Civil Works & Piping Installation
01.10.1989 – 01.01.1991
SARAWAK SHELL BERHAD, SARAWAK, MALAYSIA.
MIRI Crude Oil Terminal (MCOT)
Installation Of Finance F 102
Construction of R.C. Foundation & Steel Pipes
Piles, Pipe Support, Piping & Hock Up
To Witness 500 Ton Load Test Of Steel Pile
01.08.1986 – 30.09.1989
Steel Pipe Piles for Stabilization Tower Compressor Shed LUMUS Heater
To check alignment, levels co-ordinates
04.10.1974 – 31.07.1986
SARAWAK SHELL BERHAD, SARAWAK, MALAYSIA.
Drawing office Drafting, Civil, Mechanical, Piping & Field works
01.02.1966 – 03.10.1974
JKR SABAH STATE GOVERNMENT, MALAYSIA.
Public Works Department: Clerk of Works/Senior Engineering Assistant.
R.C. Structure Design & Drawing
Draftsman Of Architectural & Reinforced Conc. Structural & Bridges Drawing
* Reinforced Conc. Structure Design of dwelling house and Timber house.
* Shop Drawing where necessary.
Page 4