Post Job Free

Resume

Sign in

Manager Project

Location:
Mumbai, MH, India
Posted:
October 28, 2016

Contact this candidate

Resume:

CURRENT DESIGNATION:

Manufacturing Manager at Gates Engineering & Services, Jebel Ali, U. A. E

Oil & Gas Construction & Integrated Systems

CAREER OBJECTIVE

To deliver the best of my skills and capabilities towards the objectives and goals of a progressive organization and to hone my expertise as a Manufacturing Manager

PROFESSIONAL SKILLS

• Progressive Twenty Five years of professional experience in the field of Maintenance, Oil & Gas related Constructions and Manufacturing of Integrated Systems & Skid Packages for the O&G sector

• Comprehensive knowledge on Manufacturing of Chemical Injection skids, Gas Metering Skids, Hydraulic Equipments like Power Packs, Flushing units, HPP,UHP Centrifugal pump units, Wire line Spoolers, Coil tubing Spoolers, Transformer skids, Test Packs, Air Dryers, Compressor Packages etc.

• Execute the Project in line with the delivery schedule contact specification s and conditions

• Monitor day to day activities through weekly, monthly and Quarterly progress meetings

• Slippage and backlogs will be identified and action plans formulated to keep the project on schedule

• Estimation and Project management for Design, Fabrication and Erection / Pre-commissioning of Oil & Gas Skids & equipments

• Expertise in planning & controlling the Project operations

• Adept at implementing measures /standards & applied management tools & practices such as for effective quality control & assurance

• An effective communicator with excellent relationship management skills and strong analytical, problem solving & organizational abilities. Possess a flexible & detail oriented attitude

• Leading, mentoring & monitoring the performance of team members to ensure efficiency in process operations and meeting of individual & group targets

PROFESSIONAL EXPERIENCE

Manufacturing Manager

Gates Engineering and Services, Jebel Ali, U. A. E, www.gates.com, November 2006 to till date - 9 years

• Providing Job / Project estimates and technical specifications for RFQs to sales

• Responsible for total process of manufacturing equipments like Gas metering Skids, Chemical Injection Systems, Hydraulic Power Packs,Flushing units, skidding systems and other related Oil & Gas Integrated systems

• Follow up with purchase to expedite timely delivery of components so as to ensure project is on track

• Preparing Project Plan in MS Project & ERP and updating the progress

• Conduct progress review meeting with shop supervisors, Design, Purchase, CRM to ensure that the project is on track

• Preparation of Progress Reports & KPI reports for Top Management

• Ensure complete and accurate documentation of technical data

• Technical support, guidance & supervision to manufacturing team to process the order according to project specifications.

• Liaising with the client to expedite the free issues delivery

Achievements

• Successfully manufactured Hydraulic systems, Chemical Injection Systems, Metering units etc. for prestigious clients like Schlumberger, Baker Hughes, Weatherford,Exxon Mobil, Emerson, E&H, ODS,NOV,GE Oil & Gas etc.

• Effectively coordinated for Estimation Process & successfully applied Project Controls methods to optimize resources and materials

Assistant Manager (Maintenance)

Larsen & Toubro, Mumbai, India. October 1996 to November 2006 - 10 years

• Preventive, Planned and Breakdown maintenance of Machines

• Modification of Machines as per requirement of Job

• Calibration of Welding machines and Temperature Recorders

• My responsibility was to motivate and guide a skill workforce of 30 people in day to day activities in a highly automated workshop. To study and analyse drawings of various equipment under repairs/modification, and plan/prepare the work to be carried out

• My responsibilities also include follow up and re planning if necessary to make sure that the project is completed in the stipulated time. Training to the workforce to ensure that each person develops different skills from time to time

• Record Keeping of various data of Man, machine, and different types of project after they are

complete for future use

• Co-ordinate with different department’s i.e. maintenance planning, purchase department and vendors for follow-up on material requirement and also developing new vendors to meet spares requirements

• Implementation of locally available spares in place of imported spares for cost saving and easy availability of materials and also developing vendors for the same

• Keeping in touch with different types of Manufacturers for new Technologies and equipment available in the market

• Conducting Progress review meeting with sub-contractors to ensure that Project is on track

Senior Engineer (Maintenance)

Real Value Appliance Ltd, Mumbai, India. July 1994 to October 1996 - 2 years

• Its reputed appliance industry with ultra modern technologies and machineries of Injection Moulding Machine

• Initially I was working for projects and directly reporting to Senior Manager Projects

• Liaison with MSEB for sanction load and Maximum MD commissioning of 22KV Sub - station

• Preparing Layouts for machines

• Installation and Commissioning of machineries and Utility equipment

• Preparing piping and electrical cables layout for machines

• Process orders to contractors and getting the work done in stipulated time

• After completion of the project I was transferred to Plant Engineering and Maintenance Department

• Preventive and Break down maintenance of Injection Moulding machines, Hydraulic Press Utility & Auxiliary equipments etc

• Operation and maintenance of Utility equipments like compressors, Generators, Cooling towers, Lifts, Forklifts, Pumps, Water softening plants, etc and maintaining daily records

• AMC's for A/C's, Water coolers EPABX, Weighing scales etc

• Dealing with MSEB for annual testing and power shut down

• Annual testing of Lifting equipments Pressure Vessels, re stamping of weighing scales

• Dealing with MIDC for water supply

Engineer (Maintenance)

FAG Precision Ltd, Gujarat, India. November 1990 to June 1994 - 4 years

• They are pioneers in Manufacturing Precision bearings in India under FAG group of Germany with ultra modern machineries and transfer lines. They are the first Bearing industry in the world to get ISO 9001

• Preventive and Break down maintenance of all equipments in the plat including SPM, Heat treatment and Utility

• Preparing Preventive maintenance schedule and its implementation

• Spare Parts planning

ACADEMIC PROFILE

First class in Mechanical Engineering in from Fr Agnel's, Vashi, Mumbai, India - 1990

OTHERS

Kaizen co-ordinator for the year 2005

Active member in TPM / TQM activities

PERSONAL INFORMATION

Date of birth : 11 / 06 / 1967

Nationality : Indian

Marital status : Married

Passport no : J2951356

UAE driving license no : 1317169

Languages known : English, Hindi, Marathi, Malayalam, Tamil

Expected Salary : Negotiable

REFERENCES

References will be produced on request

DECLARATION

I hereby declare that the above written particulars are true to the best of my knowledge and belief. I will be held responsible for any deviation from the above mentioned details.

Place: Mumbai

Date: 2016 Anthony Roy



Contact this candidate