NAME: Sundarrajan K
ADDRESS: ***/***,*** ********** ******,
Srivilliputtur,
Virudhunagar district.
Pincode-626125
Tamilnadu.
India
Email ID: acw4xv@r.postjobfree.com
TELEPHONE: +91-989*******
PASSPORT: K8965694
DATE OF BIRTH: 26 October 1985
MARITAL STATUS: Married
NATIONALITY: Indian
CURRENT OCCUPATION: Assistant Manager (Mechanical)
EDUCATIONAL QUALIFICATION: B.E-Mechanical Engineering, May 2008
WORK EXPERIENCE: 8 Years 02 Months
COMPUTER PROFICIENCY: MS office, MS project, AutoCAD
ACADEMIC PROFILE:
B.E (Mechanical) from Government College of Engineering, Salem affiliated to Anna University – 2008 passed out with 66.6%.
HSC (Bio-Maths) from G.S.Hindu Hr.Sec School Srivilliputtur - 2004 passed out with 89.33%.
SSLC (General) from G.S.Hindu Hr.Sec School Srivilliputtur - 2001 passed out with 84.6 %.
EXTRA CURRUCULAR ACTIVITY:
Skills in Presentation
Member of JSW Sports club
WORK EXPERIENCE
Organization: JSW Steel LTD, Salem works
Duration: From 03 June 2008 to till date
Job Description:
JSW Steel LTD is an only ISO 9000:14001 integrated steel plant capacity of 1.2MTPA in South India which enables to produce various types of steel (Billet, Bloom caster, leaf springs flat bar, TMT bar) as per the customer requirements with quality.
I am working in a mechanical maintenance department in Blast Furnace (BLT) which can produce 3000MTPD.
Comprising of:
Two Sinter plants which producing 4000MTPD capacity.
Two Blast Furnaces which producing 3000MTPD Pig iron.
Two Energy Optimizing Furnaces.
Three Ladle Refining Furnaces producing S.S., Structural quality and Low alloy steels.
Two, three strand Continuous Casting Machine producing 5 – 12 Meter length billets and blooms.
Bar and Rod Mill which producing final products as per requirements by high capacity Reheating furnace.
Two 96/48 oven capacity of Coke plants which producing quality of cokes for integrated usage.
One Pulverized Coal Injection Plant which producing 140MTPH.
Blooming mill (2-phase) installed with single high mill with gas reheating furnace.
Blast Furnace-3 project is undergoing.
Role: Assistant Manager (Mechanical)
Reporting to: General Manger
Responsibility:
(As Management)
Preventive & Predictive maintenance of various equipments on scheduled time.
Planning - Spares Planning, Store Inventory Control, Budget Planning & cost control.
Execution - Installation of equipment for Fans, Main and Auxiliary Gear drive, Hydraulic and Pneumatic Cylinders, Filter-Regulator-Lubricator Unit, Hydraulic Power Pack and over head cranes.
Design & development – Following drawing works (AutoCAD 2011) for material to be purchased as per required measurements.
Procurement - Material indenting and purchasing within the time frame as scheduled.
Documents -ISO/T.S documents, delay analyzing, MTBF, MTTR and maintenance cost analysis work and EMS / OHSAS
Hands on experience in SAP
Knowledge in TQM – 5S, Kaizen, QC, Innovation, Poka-Yoke, Six Sigma
Training - Educating subordinates about equipments & process to avoid breakdown maintenance.
(As Maintenance)
Following maintenance activities through by shifts.
Maintenance of Belts, Vibrating Screens, Pulleys, Motor & Gearbox alignment etc.
Manpower distribution and Job Allocation to Subordinates
Daily Planning & Execution Scheduling with contractors
Certification of Running Account Bills for contractors and Material Reconciliation with contractors
Responsible for Erection supervision & Alignment of various structures and Equipment
Inspection & Testing of equipment at Vendors premises
Running and Shutdown Maintenance Of 1200MTPD Pig Iron Plant.
Projects:
i)Blooming mill (Phase-II):
Technical support drawings verification and appoval.
Erection of equipments of finishing section in blooming mill.
Equipments comprising of Motor, Gearbox, Clutch units, Follower and Rolling bed.
Erection of hydraulic power packs equiped for finishing section.
Duration – 3months
Cost of project – 44Crs
Cost of finishing section with hydraulics – 10 crs
ii)Blast Furnace (I & II) Cast House De dusting System:
Technical support drawings verification and appoval.
Fabrication & Erection of rolled ducts & structural supports.
Bag filters erection.
Equipments erection. Equipments comprising of Motor, Fan, Actuators, Cylinders, Dampers, Expansion bellows, Pulse valves, Compressed air lines and valves.
Duration – 10months
Cost of project – 20Crs
Hobbies
Gym Practice
Surfing in net
Photography
Skills
MS Office
MS Project
Auto CAD
SAP
Languages Known
Read/Write Speak
Tamil, English. Tamil, English
Annual income of the current employment:
10.0 Lakhs INR per Annum
Expecting Salary:
As per standards
Location:
Current - Salem, Tamilnadu, India
Relocation - Yes
Preferred - Any
Notice Period:
30 days
I hereby declare that all the above mentioned information is true to the best of my knowledge.
DATE: Yours truly,
PLACE: (SUNDARRAJAN K)