BENNY R. PANGANIBAN
Lot * Perez Compound Cuta Duluhan,
Batangas City, Philippines 4200
È Cell. Nos. +639**-***-**** / +235-****-****
E-mail add: acw4x0@r.postjobfree.com
Position Applied For : PIPE FITTER
CAREER OBJECTIVE
To be part of socially responsible company where in I would have the opportunity for personal and career growth, acting out of skills I learned as well as my interest, thereby giving me the advantage of doing my best fort he interest of our organization.
PERSONAL DATA
Date of Birth : April 13, 1976
Place of Birth : Batangas City
Civil Status : Married
Citizenship : Filipino
Religion : Roman Catholic
Language Spoken : English & Tagalog
Passport No. : EB4543942
SSS No. : 04-3013889-8
TIN No. : 194-525-210
Pag-Ibig No. : 000*-******-**
WORK EXPERIENCE
Company : IMI / WOOD GROUP PSN
Address : Esso Exploration and Production Tchad Africa
Position : Pipe Fitter
Date of Employed : March 09, 2009 up to present
JOB DESCRIPTION
Preparation of different size of pipe spool gaskets valves and other fittings according to the specification of isometric drawing.
Fabricate offset pipe and above ground well head piping and water injection spools.
Installation of all fabricated wellhead piping in drilling site according to the T.O.A. scheduled by EEPCI management.
Fabricate and installation different size of stainless and carbon pipe spool, valves and support for crude firing project inside the plant under supervision of ESSO exploration and production Tchad Inc. (EEPCI)
Submitted and fallow our high quality proactive safety reports to achieving our target (Nobody Gets Hurt) program in our project.
Company : EEI / GORO NICKEL PROJECT
Address : Goro New Caledonia
Position : Pipe Fitter
Date of Employed : October 26, 2007 to August 14, 2008
JOB DESCRIPTION
Preparation and installation of all pipe spool and pipe support valves and other special fitting as illustrated in the isometric drawing and accordance to the specification requirements by the client which is under the supervision of INCO AUSTRALIAN MANAGEMENT Pty. Ltd.
Observe safety rules and regulations with (JSA) Job Safety Analysis.
Company : EEI / BECHTEL EG LNG TRAIN 1 PROJECT
Address : Malabo Equatorial Guinea West Africa
Position : Pipe Fitter
Date of Employed : June 21, 2005 to June 27, 2007
JOB DESCRIPTION
Install different size of pipe spool connected to compressor and turbine generator.
Cutting grinding and fit-up of small and big bore pipe, spool, valve, and fittings.
Preparation and installation of high and low pressure manifold.
Pneumatic and hydrotest all complete pipe lines followed by standard testing procedure.
Find leaks and tightening all valves and loosen bolts to eliminate all leaks and passing
One of the commissioning start-up crew to assist a final testing of all lines and equipment.
Company : EEI / BECHTEL SHOAIBAH PROJECT
Address : KSA
Position : Pipe Fitter
Date of Employed : December 29, 2002 to April 14, 2004
JOB DESCRIPTION
Install all vent and drain and all pipe support in fuel oil pump house #06 to unit #10.
Install 4” PVC and ductile pipe around boiler and turbine area from pump house to fuel oil tank farm area.
Erection and fit-up 20 and 6 inches sched 20 stainless pipe of RX foam line from pump house to fuel oil tank farm.
Erection and fit-up 36”x48” alloy and carbon steel sched 80 to the reducing station from unit #06 to unit #10 according to pipe standard and specification.
Company : EEI / BECHTEL SHOAIBAH PROJECT
Address : KSA
Position : Pipe Fitter
Date of Employed : May 24, 2001 to November 22, 2002
JOB DESCRIPTION
Install and tightening bolts 36” and 48” expansion joint and valves to product water tank #04 to tank #09.
Install and erection of inlet and outlet RTR header in train #1,2, & 3 and other RTR pipe connected to US filter and product water tank area.
Install isolated gasket, washer and bolt tightening of 42” underground pipe of fire fitting line around the plant.
Company : EEI / BECHTEL SHOAIBAH PROJECT
Address : KSA
Position : Pipe Fitter
Date of Employed : July 18, 1999 to April 18, 2001
JOB DESCRIPTION
Install #09 main steam line size 24” alloy pipe, valves and other fittings according to piping standard and specification.
Install hanging support and other support to all steam line in boiler and turbine area.
Fabrication and install 16” alloy pipe schedule #160 for temporary team blowing.
Fabricate dummy and saddle support size 20” x 36” pipe carbon steel pipe.
Cutting bevel and fit-up size 6x8” to 14x16” schedule # 40 carbon steel pipe for jacket pipe
Install manifold and assist hydrates and chemical plashing.
Company : AG&P BATANGAS HEAVY FABRICATION
DIVISION
Address : San Roque, Bauan, Batangas
Position : Pipe Fitter
Date of Employed : September 30, 1997 to June 30, 1997
JOB DESCRIPTION
Layout and cutting to 36” inches stainless pipe schedule # 20-40 and prepare all type of valves.
Fabricate 20 x 36” stainless pipe support specified by each drawing.
Marking line number of complete spool according to each drawing using metal punch number.
Know the system in installation of all gasket and other piping system and fixtures.
BENNY R. PANGANIBAN
Applicant’s Signature