CURRUCULUM VITAE

PERSONAL DETAILS

NAME : David Michael Parrott

ADDRESS : Oakwood Main Street

Bonby

North Lincolnshire

DN20 0PL

Tel : (01652) 618845 Mobile : 078**-******

Email : acw4q7@r.postjobfree.com

DATE OF BIRTH : 16th June 1962 NATIONAL INS NO : WP 06 20 13 B

MARITAL STATUS : Married, July 1986 CHILDREN : Two

PASSPORT NO : 0231 57191 SAFETY PASSPORTS : 439331

Vantage NO : 1209503 (26th May 2012)

EDUCATION : Havelock comprehensive school, Grimsby,

North Lincolnshire. 1973 - 1978

APPRENTICESHIP : Humber Graving Dock, Immingham Docks,

Immingham, North East Lincolnshire.

1978 – 1982

FURTHER EDUCATION

PME BP Project Management Essentials

EEMUA 159 / API 653 Aboveground storage tanks integrity Assessor

IOSHH Certified

Technical Education Council Fabrication and welding technology

(ONC) Pass & Merits

East midlands Education Council Fabrication and Welding Bias

Pass and Credits

City and Guilds of London Institute Welding and Engineering Craft Studies

Pass and Distinction

Computer Literacy & Information Technology RSA Exam course

Pass

Microsoft Project Certified

Primavera P3, P3E/c (V4) P6 Certified

Pert Master (Planning risk based analysis) Certified

PRESENT COMPANY

B.P. Southern Gas Asset July 2011 to November 2012

Projects & Modification Group Projects Controls Lead / Planner

oPlanner, initially started with SGA planning all project and Modification projects;

Developing a 3 year portfolio that is/was BP gate compliant

Adding budget (planned) costs to P6 activities

Tracking actual & Committed monthly costs and profile the cost in P6

oProjects Controls Lead

Extrapolating data from P6

B.P. North Sea (Aberdeen) November 2012 to October 2015

Projects & Modification Services Manager

oIn charge of the planning and finance team (9 people)

oPlanning for all assets within BP North Sea

oDeveloping a 7 year portfolio

oAgreeing future year budgets

oDeveloping Process & procedures to align with BPs CVP process

oResponsibly for Function KPIs in month/year, monitor, review and maintain statistics

B.P. Chemicals (Hull) October 2015 to present

Lead Scheduler for BP TAR team

oBuilding the Plan in Primavera P6

oDeveloping a system based management report

oDeveloping the plan into a schedule

oManaging planners through the build up to the event

oManaging the schedule and including Extra works

oAttending daily site management meetings to discuss progress

PREVIOUS EXPERIENCE

PetroPlus (Coryton) March 25th 2008 to July 2011

Shutdown, Lead Planner

oPlanning the FCCU shutdown activities for the 2009 Shutdown, 9 Units.

oControl of EWO’s (Extra Work Orders)

o3 Junior planners/Schedulers

Single Unit Shutdowns,

General duties are develop plan from work scope including De-commission & Re-commission, manage changes to work scope through the EWO process, review histograms to align resource requirements, generate and issue ‘S’ Curves for progress tracking.

GTG (Gas Turbine) Intermediate Outage Q3/2010

63 PDA Intermediate Outage Q1/2011

32/36 Unit (SHU/SHD’s) Intermediate Outage Q1/2011

Maintenance Department

oAssist with development and integration of interface programme (API) from Maximo to P6

oDetailed knowledge of MAXIMO to check work orders, review and print drawings

oDevelop weekly reports and procedure to issue to year plan & emergent work

oDevelop 5 year look ahead plan for CapEx & RevEx to improve reliability

ConocoPhillips Humber Dec’ 2006 to March 25th 2008

Divisional Long Range Planner

oPreparing 5 year plans and budgets for the division Capital expenditure.

oOrganising incumbent sub-contractors work lists.

oDeveloping worklists & P3 plans for shutdowns.

oMaintaining FFS (Fit for Service register) and ensuring divisional compliance against refinery standards.

S.A.P.

oGenerating report data.

oInputting SAP Notification & PM work Orders.

oOrganising incumbent sub-contractors work lists

oDivisional compliance with (MOC) Management of Change procedures.

oAnnual exception maintenance budgets.

JACOBS/DELTA CATALYTIC LTD Project Manager (November 1998 to Dec 2006)

SUT Manager ConocoPhillips (Humber)

GOHDS - February 2006

Crutilities - May 2006

Calciners - September 2006 (Pre planning)

Tank Maintenance Engineer / Project Sponsor

TOTAL - Lindsey Oil Refinery

ESSO Distribution terminals

Heat Exchanger Shutdown (November 03) working to defined deadlines within tight constraints (That wear assumed virtually impossible) Ensuring

Acordis, On loan to Acordis Engineering department in charge of underground services, and Lines A, B, C & D

Shell Manufacturing Complex, Stanlow. Shutdown manager Feb 2001 HFA shutdown, agree mechanical target man-hours, define sub-contractor scope’s and quality requirements. Responsible for the writing and issuing of method statements, risk assessments, and task analysis. Managing teams including, engineers, supervisors, and 180 plus workforce. Ensuring that all schedule milestones are achieved, safety directives are strictly adhered to and the projects meet all my, and the clients objectives

Auto Oils 2000 (Elf oil refinery) 1999 / 2000, Night shift Manager / Test systems Designer, working with the client to reduce test systems to minimum quantity, then taking over project as Project Manager (At Clients request) to ensure shutdown was met and final project tie-ins where accomplished, developed various procedures relating to unique construction stages / goals.

Short break away from Jacobs / Delta Catalytic UK

Lindsey Oil Refinery HFA unit 1994, Managing primarily the Butumiser side of the HFA unit but ensuring a flexible approach to the alkalisation unit to ensure that all targets where met

Lindsey Oil Refinery FCCU, 1992, area shutdown manager In charge of reactor, third stage separator and ancillary equipment. Forming part of the overall shutdown project

Various clients. From receiving tender documentation reviewing potential work scope liasing with the client to define contractual requirements, producing Sub-Contractor enquires (Specification Specific), reviewing quotations and placing orders.

Overseeing projects from inception to completion, tracking tasks against pre allocated budgets and schedule.

Jex Engineering Project Engineering Manager (March 1998 to November 1998)

Millennium Inorganic Chemicals, Shutdown manager and co-ordination engineer for the 150K project. Immingham. Liasing with client to provide a framework for setting objectives, establishing initiatives for improvement and identifying actions for implementation prior to the shutdown to develop both pre S/D and shutdown plans (Over 500 tasks and Jex resources peaking at 74 men plus Sub-contractors) in addition the indirect control of sub-contractors and applicable activities through front line supervision.

DE-VAL-CA Eng Shutdown Engineer (1/7/97 to March ‘98).

Shell Manufacturing Complex, Stanlow. Liasing with client to pre plan Feb 1998 HFA shutdown, agree mechanical target man-hours, define sub-contractor scope’s and quality requirements

The position of shutdown manager evolved through the client “Shell” suggesting that I fill the position due to the unexpected illness of the existing manager. The duties Involved control of the shutdown, working very closely with Shell to complete the shutdown and meeting all four criteria Safety, Program, Costs and Quality. Daily meetings to discuss the 24Hr look-ahead, safety issues and any / all evolving work as required. Project Budget £0.92M

MB SERVICES QA/ Welding Engineer (09/03/95 to 21/03/96)

Foster Wheeler shop fabrication of all pipework, formulating PQR’s, WPS’s and coding welders for both site & shop. All control of materials and fabrication including TQ’s, Fabrication control sheets NDE and inspection. On site compiling test systems and collating reports/data for test systems.

Mobil Oil Co Ltd, controlling all aspects of quality updating records and compiling data dossier for final handover and acceptance.

BOC shop fabrication only. All control of materials and fabrication including TQ’s, Fabrication controls. Inspection & NDE.

BP Shop Vessel refurbishment inspection and records for Nation Vulcan

Site Plant shutdown Mechanical & Fabrication working to Quality Plans supplied by Client.

EASTERN ENGINEERS QA Manager (07/08/90 to 22/12/93)

BP Lincoln (IPC Candecca) Revamp and upgrade projects in the exploration of oil.

Conoco Oil Refinery closed blowdown project, all aspects of quality control and material tractability

Lindsey Oil Refinery minor project work and also major shutdowns on FCCU (Reactor & Regenerator replacement of dust bowls, dip legs, flapper valves & Bellows) remedial works to standpipe air riser & torch oil injectors.

ADAM (AMEC Design & Management) Sour water project Compiling test systems, producing as built isometrics and all quality records.

Norsk Hydro Fertilisers Producing Pipework and Vessels to ASME / ANSE standards as required

SUMMARY

After completion of my apprenticeship I gained experience in the Petro Chemical Installation, Off - Shore Modular Construction, Pipe Fabrication & Construction Fabrication.

After Ten years experience progressing from a hands on basis to a charge hand and then Foreman, I was offered the position of Quality assurance Manager with Eastern Engineering in August 1992. Which I accepted I have completed Major Projects for Lindsey Oil Refinery, Conoco, A.M.E.C (A.D.A.M), Simon Storage, Courtaulds and Hydro Fertilisers, Foster Wheeler / Texaco which involved all aspects of control of a workshop these duties involved an accurate weekly status report Materials control NDE requests TQ Log and all correspondence with the client.

Working on the Esso Distribution sites as a Resident Engineer responsible for all Permitry controls including gas testing and tank entry, formulating and reviewing Safety method statements, holding weekly safety progress meetings.

I have gained considerable experience and have encountered new and exciting challenges since progressing to Project Manager. Developing Programs, Working to the CONDAM Reg’s, liasing with the HSE, procurement and competitive purchasing.

EMPLOYEE ADRESSES

BP Exploration Operating Company Ltd.

Bridgehaven One SGA

1 Saxon Way, Priory Park West

Hessle

East Yorkshire

HU13 9PB

PetroPlus, Coryton Refinery

The Manorway

Standford-le-Hope

Essex

SS17 9LL

Delta Engineering Group

Europarc Innovation Centre

Innovation Way

Grimsby

North East Lincolnshire

DN37 9TT

Jex Engineering Company Limited.

Adam Smith Street

Grimsby,

Northeast Lincolnshire.

DN31 1SJ.

De-Val-Ca Engineering Ltd,

Unit 6A Prince Edward Drive,

Queens Road

Immingham,

Northeast Lincolnshire.

DN40 1QU.

Motherwell Bridge Services,

North Killingholme Airfield,

North Killingholme,

Northeast Lincolnshire

Eastern Engineering,

North Moss Lane,

Stallingborough,

Northeast Lincolnshire.