Resume

Sign in

Manager Project

Location:
Katy, Texas, United States
Salary:
open
Posted:
October 13, 2016

Contact this candidate

Resume:

SUMMARY

Over (**) twenty-seven years of experience in upstream (offshore) and downstream industry, petrochemical, FLNG (Floating – LNG), LNG, refining, research and development, and marketing. Experience in offshore projects in positions has included Project Manager, Engineering Manager, Interface Manager, Integrity Engineering and Team Lead. Focus of experience in offshore projects (MOPU’s), petrochemical, LNG liquefaction / re-gasification, refining, and hazardous materials systems, including process design, P&ID development, NDT review, systems analysis, instrumentation and control identification, hydraulic analysis, equipment sizing, and field engineering. Researched on wastewater management, thermal radiation systems in fluid dynamic, and heat transfer area under research and development. Experience in project engineering and being a Project Supervisor responsible for quality control (QC), mentioned ASME, API and ANSI code interpretation for staff and liaison with contractor and engineering contractors.

EXPERIENCE

2007 – 2016

Sr. Project Manager/Engineering Manager, WorleyParsons, Houston, TX

Managed Upstream Offshore Floating Production Storage and Offloading (FPSO) projects, MOPU’s,, Subsea Pipelines, FLNG, LNG offshore topsides packages, drilling subcontractor, living quarters coordinating, conceptual development/studies, integrity engineering, screening studies, feasibility studies, and detail design to fabrication to startup.

Global Water Development Partners (GWDP) – PEMEX Produced Water Management Project

Project Engineering Manager: Cantarell, Mexico, Pre-FEED/ FEED stage of engineering

GWDP project proposes is to develop an new stand-alone two deck offshore produced water treatment facility (AKAL-CD) in the Cantarell Field, Mexico at the Akal-C platform to handle approx.600 (kBPD) total produced fluids 80/ 20 Percent Oil/ Water cut. The water treatment facility is designed as a modular design

(net Dry 522 tons Wet 900 tons) and will placed on a 8 pile jacket with two bridges; first 100m long to tieback to an existing PEMEX platform and an flare bridge approx. 75m with bridge support. All modular units will be able to be lifted and placed by cranes on a large semi-sub lift vessel. Second part of the project are two subsea tie-back’s one 12” and 18” and two subsea tie-in’s (950 MM US$)

Ophir Holdings Limited - Ophir Block R FLNG Owners Engineers Management Team - FLNG Topside Engineering Manager; Equatorial Guinea, West Africa, Pre-FEED/ FEED stage of engineering

Ophir FLNG Project for Block R is located offshore Equatorial Guinea (EG) approx.140km off the Coast of Bioko Island and in a water depth approx. 1500m. The Ophir Project is a six year, 6-7 billion US$ with 20 well phased development contracts engaged in LNG, floating systems with 3 liquefaction units, turret mounted risers, and subsea gas gathering system (SURF and SPS) developments that will extraction and monetization of approx. 2.6-3.6 TCF of gas from Block R Offshore topsides packages, drilling subcontractor, living quarters coordinating, conceptual development/studies, screening studies, feasibility studies, and detail design to fabrication to startup. (4 Billion US$)

BP Trinidad East Coast Renewal - Terminal & Pipelines Project Developments Trinidad - GPO OPLE

Pipeline Replace & Offshore Platform Mod’s - WP Sr. Project Manager/ Project Engineering Manager

Pre-FEED/ FEED & Detail stage of engineering

Managing WorleyParsons/ BP’s engineering team, Co-ordination of Engineering Activities, Greenfield and Brownfield upgrades to three BP offshore platforms topsides: Amherstia B, Cassia B and Mahogany B Platforms and the replacement of 12-inch offshore liquids pipeline approx. 98 km long from Mahogany B platform to Galeota Point Terminal. The group of project is to implement a long term solution to mitigate the current business and environmental risk posed by the deteriorating 12-inch offshore liquid line to evaluating pressure system fitness for service and establishes a baseline for brownfield modifications for the platform upgrades that are needed. (1.5 Billion $US)

BP Gulf of Mexico Thunderhorse Asset Services Group

Brownfield Projects, Topside Integrity Engineering & Mod's and Engineering Coordinating – WP Sr. Project Manager, Brownfield detail engineering, construction & offshore instillation engineering phase

Manage Engineering team, Co-ordination of Engineering Actives, NDT teams and Brownfield upgrades to the Thunderhorse asset for the WorleyParsons engineering team. Coordinating 3rd party engineering actives groups namely with Mustang Engineering and Technip that were evaluating HPU pressure systems fitness for service. (5 to 30 Million $US each project)

ExxonMobil – Sakhalin -1; Arkutun-Dagi Field Development Project

Drilling & Living Quarters Coordinating Engineering Manager

FEED/ Detail engineering & construction engineering phase

Coordination of engineering actives for the drilling subcontractor Parker Drilling & Rubin - Russian Design Institute (Design Bureau of Marine Engineering) of the living quarters, coordination with package mangers, drilling equipment vendors, DSME LQ builder, RDI co-ordinations and 3rd party engineering groups for resources & project scheduling. (6 Billion $US)

Agip KCO – Kashagan Development Experimental Project.

Sr. Project Manager/ Engineering Manager

Detail & construction engineering phase

Worked with this 70 k offshore in the Caspian Sea in 12 m of water, 28% of H2S gas field, and 8,000 psig reinjection pressure. Performed project engineering, design, and workshare. Managed the 1.5 mile long piperack, including 14 modules built in Kazakhstan/Russia/Caspian Sea area of Kazakhstan. Transported to site on barges fully stuffed with piping, electrical, and instruments, and controls. Worked with weight of pipe rack modules are 2,200 metric tons each. (1 Billion $US)

Chevron – Rosebank/ Lochnagar Field Development Engineering Evaluations

Topside Project Manager

Pre-FEED/ FEED stage of engineering

This project was awarded on a $US 10.7 million (Not to Exceed) engineering cost basis, with WorleyParsons – Houston Offices. The Rosebank North Field Development; located in the West of Shetlands lands located in approximately 3700ft (1130 meters) water depth with a fairly flay bottom in general which is about 12 15 km north of the center of the Rosebank field (Chevron) and the Cambo field (Hess) which is about 40 km South-South- West of Rosebank.

Primary responsibilities included: Potential for tieback of two nearby fields, engineering evaluations of various facility alternatives, evaluations sizing confirmations, cost estimates, schedules, risk assessment, case relative evaluations and technologies value creating opportunities.

4 Cases were part of the assessment:

FPSO with Shuttle Tanker Offloading

SEMI with Pipeline Export

SEMI with Export via FSO

EPS based on a leased or used/market opportunity FPSO

Reliance Industries Limited – MA Field Development, FPSO Project (Early Production System)

Topside Project Manager

Pre-FEED stage of engineering

For KG-D-6 Field, East Cost of India. Converted a Suez Max Trading Tanker w/Mooring Tower, including 1.1 MMB Storage, 60,000 BOPD, 70,000 BWPD and 500 MSCFD gas topside package for 1,200 m water. Performed detail design project review active for long-term production system, FPSO.

2005 - 2006

MODEC, LLC., Houston, TX, FPSO Project Manager

Managed the development of proposals to assist in FPSO bid packages from engineering through fabrication to startup. Supported ongoing projects engineering, mechanical completion, and handover requirements. Served as a Workshare Coordinator with the Tokyo Engineering Office and Triune Engineering in New Delhi, India for topside engineering design.

2001 - 2005

Project Manager, Fluor - Offshore Services Division, Houston, TX

Managed the development of proposals for large scale projects. Performed field surveys of production modules integrity engineering, corrosion & inspection management and processing facilities to be used on MOPU’s. Performed offshore pipeline design, construction, and related accessories, e.g., subsea pipeline design, PLEMS and PLEM to FPSO flexible hose system design, mooring systems, riser assemblies, pump packages, integrity offshore topside engineering, corrosion & inspection management on offshore topsides projects, offloading systems (LACT units), and compressor packages/compressor stations interface management. Served as the Office Work-share Coordinator and Interface Manager within the corporation. Worked on the following projects:

ConocoPhillips – Bohai Bay Phase II, FPSO Project, FEED/ Detail engineering & construction engineering phase

Served as a Sr. Project Engineer for topside development and wellhead platform "B" design and layout. Worked with new build hull 1.5 MM storage, topsides, and soft yoke mooring, with mooring tower and three wellhead platforms.

FEED/ Detail engineering & construction engineering phase

ExxonMobil - Sakhalin 1 Project, Chayvo OPF Project, 39 New Build Oil Separation and Stabilization and Gas Compression Export Models. Served as an Interface Manager/Engineering Team Manager. Built models by HHI shipbuilding yard and transported them to Sakhalin Island on barges, with piping, electrical, instruments/controls, and 1.25 MMB onshore oil storage.

ChevronTexaco – Served as a Project Manager and Interface Manager, Detail engineering. phase

Responsible for execution of engineering and field construction coordination between all project partners on the projects. Worked on the Baja Ports Project and Liquefied Natural Gas (LNG) Terminals Project, Gulf of California for ChevronTexaco and the Ports Projects, which were self-contained Liquefied Natural Gas (LNG) at an Import and Gasification Facility in Gulf of Mexico (Vermilion Block 140), 52 miles off the cost of LA. Partnered between Fluor, Aker Kvaerner-Houston, Aker Kvaerner-Oslo, Black & Veatch, and Sandwell to design and build two 64 m (wide) x 152 m (long) x 65 m (tall) LNG Gravity Based Structure (GBS) storage tanks to hold 400,000 M3 of LNG. Gasified the LNG and exported to shore via 42" subsea pipeline at 2.0 BCFD of gas per day.

ChevronTexaco – Port Pelican / Baja LNG Terminals Program, Sr. Project Engineer Pre-FEED/ FEED engineering phase

The program was a series of offshore LNG offloading, storage and re-gasification terminals designed to allow monetization and delivery to market of a worldwide natural gas resource. Our scope was management, topsides, pipelines, engineering, procurement and construction management all using gravity based storage structures.

Woodside Energy – Enfield, FPSO Project, 1.0 MMB Storage, Perth, Western Australia.

Project Engineer Detail engineering & construction engineering phase

New build hull and detachable SBM and topsides. Topside development and Project Interface Manager for the complete project.

ExxonMobil (Esso) – Kizomba FPSO "A" Project, Block 15, 2.2 MMB storage, Angola. Worked on this new build hull and topsides. FEED, Detail engineering & construction engineering phase. Served on the project management team supporting topside design and development of the complete project.

ExxonMobil (Esso) – Kizomba FPSO "B" Project, Block 15, 2.2 MMB storage, Angola. Detail engineering & construction engineering phase. Worked on this new build hull and topsides. Served on the project management team for proposals and transition team supporting from "A" to "B” at the Houston office.

2000 - 2001

Project Manager, Kaldair Incorporated

Managed the flare systems design and fabrication to meet industrial standards used on upstream projects to meet new industrial environmental standers. Procured specialty equipment and ANSI code interpretations for Application Engineering Staff.

1999 - 2000

Chief Engineer, Foster-Wheeler USA, Houston, TX

Managed field engineering of $70 million turnaround to AVU-146, heavy crude oil unit. Established and maintained field engineering office, including documents control. Maintained FW/Clark refining and marketing plant standards and specifications. Planned and scheduled detailed construction. Coordinated engineering with over 54 corporate field employees/eight construction sub-contractors.

1996 - 1999

Project Engineer, Oceaneering International, Houston, TX

Managed design, project, and construction management of $84 million Zafiro Producer for a FPSO conversion into Mobile Offshore Production Systems (MOPS), production modules, processing facilities, and subsea. Worked on Mobil, La Ceiba Field Development Project. Managed Corrosion & inspection management design, NDT review, material review, and process facilities operation. Performed procurement, installation, and startups for the following projects:

Mobil – Zafiro Producer, FPSO Conversion for l, 1.37 MMB storage, West Africa. Converted a shipyard tanker from trading tanker to FPSO. Performed upgrade/topside installation of modules and preformed integrity engineering, corrosion and inspection management on topsides.

Oceaneering – Ocean Producer, FPSO. Performed system upgrade and modernization of process equipment and life extension of the hull.

SOFTWARE

Microsoft Word/ Excel/ Project

Windows 2000 and Professional, 2010

Microsoft Office XP, 2000, 2003 and 2010: Word, Excel, PowerPoint, Access, and Outlook

Adobe Acrobat Professional, Encompass, SharePoint, Projects On-Line and Smart Plant

Varies Project Management Software

Primavera Scheduling Software

Bluebeam/Adobe

Revit and Navisworks

EDUCATION

BS, Industrial Technology/ Industrial Engineering, Lamar University, Beaumont, TX

A.A.S., Drafting, Lamar University, Orange, TX

WorleyParsons Global Management University

Fluor Management Development Collage

SafeGulf Offshore Training

BP GoM License to Go Offshore Training

(TWIC) Transportation Worker Identification Credential

HUET / METS API RP Water Survival Certification



Contact this candidate