MOHD IZHAR EFFENDI BIN MOHD YUSOP
Dipl. Engineering Resource Management, M.Sc. Engineering Organization PERSONAL DETAIL
Telephone: +966********* (Saudi Arabia)
+601******** (Malaysia)
Email: acw0ty@r.postjobfree.com
Current address: KEMYA (PBR Plant)
Al-Jubail Petrochemical Co.
P.O Box 10084, Al Jubail Industrial
City 31961
Saudi Arabia
Permanent address: No 54, Jalan Mawar 18,
Taman Mawar, 81700, Pasir Gudang
Johor, Malaysia
PROFILE
Have nearly 25 years of working experience in petrochemicals industry in Production Management, Quality Control and Assurance, Process Safety Engineering, Technical Troubleshooting, SHE & Risk Management, and Technical Training & Development. Currently Process Engineer at KEMYA (JV between SABIC and ExxonMobil) at PBR/SBR plant with focus on quality and product qualification. Experienced in plant QC/QA activities, ISO and GMP audit, quality root cause analysis, product trial run and qualifications. WORK EXPERIENCE
1. Organisation: KEMYA (SABIC/Exxon Mobil JV)
Position: Process Engineer
Dated Joined: Oct 2014 – present
Lead a group of technical staff and engineers in all commissioning and start up activities
Monitor product quality and perform root cause analysis and implement corrective measure
Develop SOP and supervise trial run to ensure product meet specification
Provide coordination between process and laboratory on sampling for product qualification
Review and develop SOP for safe plant commissioning and operation include hazard analysis in early project phase
Management of Change steering committee for plant improvement which was not included in design phase with responsibility to oversee all MOC capital budget, implementation and cost optimization
Ensure all construction and commissioning phase is according to company standard and licensor requirement
Focal point contact, accountable and responsible person for function test all rotating equipment to ensure readiness before pre-commissioning phase.
Lead meeting and communicate with Senior Manager and Licensor (GOODYEAR) on any process engineering improvement required prior to commissioning and start up
Execute direction on schedule, manpower, cost, MOC and technical arrangement for initial raw material unloading for plant start up
Ensure SABIC Safety procedures are followed prior any job start up day to day basis
Provide technical leadership in managing team motivation to achieve objectives 2. Organisation: SYNTHOMER, Pasir Gudang, Malaysia (previously Polymer Latex) Position: Senior Superintendent
Dated Joined: Dec 2008 – Oct 2014 (approx. 6 years)
Lead, supervise and manage a team of production technicians operating Carboxylate Nitrile Butadiene Elastomer plant safely, effectively and efficiently with product quality as priority 2
2
Leads development and implementation of company Management System Standards programs focused on achieving functional ‘excellence in all business area to meet company business goals
Fosters and leads the implementation of the company's strategy and execution plan to achieve Operational Excellence through the establishment of management systems to develop and implement company standards and best practices
Establishes and administers management system for the development, issuance, approval and implementation of company standards, best practices and lessons learned
Facilitates and supports development and implementation efforts in the establishment of management system documents executed by various departmental organizations
Provides advisory support to the company’s major and plant project organizations in the establishment and implementation of project and quality management systems
Establishes, administers and ensures implementation of company Project Quality Management System Standards required to support achievement of safe and reliable plant operations
Performs reviews and audits to measure performances in relation to established standards and identify areas for improvement
Interfaces with other company resources and external technical resources
Develop capability and train new production team in safety and productivity
Maintain, issue and communicate daily report with other department on production quality issue
Trouble-shoot process disturbances and take the necessary corrective action
Ensure good housekeeping and proper waste disposal according to procedures and regulations
Support ISO implementation related systems by conducting briefing/training to the production staff
Manage all plant activity production / utilities / waste water / schedule Waste achievement target
Monitors quality performance and resolve quality issue
Interface with operation, quality control lab and product development team in trial execution
Ensure staff remain highly motivated, competent and adequately trained 3. Organisation: BASF Sdn Bhd, Malaysia
Position: Production Supervisor
Dated Joined: May 1992 – Dec 2008 (approx. 16 years)
Enforce the provisions of the Quality Management System Manual
Conduct internal surveillances/audit in order to verify compliance with the Quality Manual
Supervise/coordinate a team of Production Foremen and Operators to operate the plant safely
Ensure compliance to environmental, health and safety rules and safe working environment
Develop capability and provide training to new and existing production team in order to improve safely and productivity
Appraise performance of production team and identify any training required
To monitor the production process during shift and take control measures as necessary to ensure consistent product quality within our specification is achieved.
Trouble-shoot process disturbances and take necessary corrective actions
Liaise with maintenance and E & I personal for any repairs and maintenance activities in the plant
To minimize down time and maximize productivity.
To ensure good housekeeping and proper waste disposal according to procedures and regulation
Lead customer complaint analysis and production line troubleshooting
Internal auditor for HACCP audit program
EDUCATION
1. M.Sc. Engineering Organization
Asia E University (2012 – 2014)
2. Dipl. Engineering Resource Management
Universiti Teknologi Malaysia (2010 – 2012)
First Class CGPA 3.62
CERTIFICATION AND TRAINING
Certified Environmental Professional In Schedule waste Management (CePSWaM)
Permit to Work System, PTW
3
3
Authorized Gas Tester, AGT
Confined Space Entry, CSE
Failure Mode Effect Analysis, FMEA (Train the Trainers)
Safe Handling of Chemicals, SHOC (Train the Trainers)
Alarm Management System
Workshop Domestic Inquiry Procedure.
TSTC – Fire Team Development / ‘’ICS Training ‘’ / Combined Breathing Apparatus.
Planning & Problem Solving.
York YK & Frick Chiller Training.
PROFESSIONAL DEVELOPMENT & ACHIEVEMENT
1. Key member for various HSE and Risk Management activities, such as Pre Start up Safety Review
(PSSR), Process Hazard Analysis (PHA), Hazard & Operability Study/Review (HAZOP), Hazard Identification (HAZID) and Job Safety Analysis (JSA) 2. Lead Troubleshooting activities by grouping up participants from various departments and utilizing ECFA & fish bone method and RCA (Root Cause Analysis) as tools 3. Specialist of successful new plant PSUSR (Pre-Start Up and Safety Review) 4. Hands-on experience with major type process liquid, gas and polymer process (continuous and batch operations) and have commissioned several process plant 5. Executed and commissioned add-on improvement project and participated in multiple safety review and Hazard analysis, successful trouble-shoot NBR / XSBR hygiene issue 6. Involved in commissioning team / start up new plant E.P.S ( Expandable Polystyrene Plant) at Polystyrene Sdn Bhd Rembau Negeri Sembilan in 1990 7. Involved in pre commissioning and commissioning / start up new E.P.S (Expendable Polystyrene Plant) at B.A.S.F (M) Pasir Gudang Plant in May 1992.
8. Rewarded by B.A.S.F for valuable suggestion in Production 9. Extensive experience in numerous plant start-ups from recruiting and training the team, pre- commissioning, commissioning, start-up of Carboxylated Nitrile Butadiene Rubber plant. Resource person in developing the SOP for plant start up / shut down and training modules 10. Involved directly with contractor (Foster Wheeler) during PolymerLatex plant construction and started in Jan 2009 (completed individual test pack in every and each area related to plant) 11. Involved in Commissioning / start up of Carboxylated Nitrile Butadiene Rubber plant in all section include utilities (refrigeration unit, chillier, waste water treatment, waste heat boiler & shell boiler) 12. Training at Germany at CHEMIEPARK Marl Germany (Jan to April 2009) 13. Training at Filago Italy ( production site, April to July 2009) 14. Fire Fighting Competition For Pasir Gudang Industries (10 Dec 2011) AVAILABILITY
Notice period : One (1) month notice
Expected Salary : (Negotiable)
Willing to Travel : Yes
Willing to Relocate : Yes
LANGUAGE
English – Written/Spoken
Malay/Indonesia – Written/Spoken
REFERENCE
Casey Dexter
Technology Engineer – Senior
Email: acw0ty@r.postjobfree.com
Phone KSA Office: +966 (0)13352
KSA Cell: +966 (0-50-294-****
4
4
Dr Mohammad Azizol Abdul Wahab
Lead Scientist, SABIC Technology and Innovation (Polymers), Riyadh, KSA Email: acw0ty@r.postjobfree.com
Telephone: +966-*********
Scott Johnston
Budene 880 Process Specialist
Email: acw0ty@r.postjobfree.com
Phone: 409-***-****
Haisha, Mohd Salim
Process Engineer, SEP PBR Operations
Email: acw0ty@r.postjobfree.com
Phone KSA Office: +966 (13) 352 1220