Phone: 403-***-****
Email: **************@*******.***
Shauket Nayani, P.Eng
Land Development: AMEC Community Infrastructure Western Canada (Field Engineer). March 2014 to September 2015.
Project List:
Trans Alta and Calgary Arts Academy external work. (Client: Calgary Stampede).
Ranch Land Sub- Division. (Client : City of Medicine Hat)
Deer foot South Phase 3 Project. (Client: Calgary Airport Development Authority). Calgary Stampede projects.
Prepared Site servicing plan, site grading plan and Storm water calculations for Calgary Stampede – Trans Alta building and Calgary Arts Academy. Prepared kick off quantities for roads and underground services, worked on road grades defining sub-grade condition, thickness of sub-base (Pit run), thickness of base coarse (Crush), thickness and number of lifts for road paving.
Prepared roads and concrete specifications in light of City of Calgary specifications. Trap low areas around catch basins, based on contours and calculating ICDs requirement for CB.
Designating location of storm / sanitary manholes, catch basins, Hydrants as per City of Calgary specs.
Worked on site grading plan, to make sure road grades and drainage is as per master drainage plan with adequate slopes. Fixing site grades for open air performance area, again in line with master drainage plan.
Worked on preparation of Development Permit (DP), Development Site Servicing Plan (DSSP), ESC and Storm management plan for Calgary Stampede – Trans Alta building and Calgary Arts Academy. Education
B.Sc., Civil Engineering, University of
Engineering and Technology Lahore,
SAIT Calgary
Design Certificate course from SAIT
AutoCAD 2012, I, 2D, & 3D (SAIT)
Micro station, I, 2D, & 3D (SAIT)
Affiliations
Association of Professional Engineers, Geologists, and Geophysicists of Alberta, ( P.Eng, M85207 )
Professional Engineer ( Civil / 6692), Pakistan
Engineering Council
Employment Profile
March 2014 to-date AMEC Community Infrastructure Western Canada
February 2012 to January 2014 WSP Canada Inc.
March 2009 to January 2012: City of Red Deer
May 2005 to December 2008: Sunbow Engineering
March 2004 to April 2005: Aman Building Corporation.
April 2003 to February 2004: IBG Construction Ltd. 79, 210 86 Ave S.E Calgary, AB T2H1N6
Summary of Experience
Shauket has extensive engineering experience in
project construction / supervision, planning,
management and quality control. He is proficient in technical drawings, reporting and preparation of
projects estimates.
In the area of land development, Shauket is
experienced in take-of quantities, schedule of cost, budgeting, co-coordinating with underground/surface contractor, making joint inspections with the
contractor, documenting inspection results,
remediation, final inspections, preparing field
certificates, materials compliance and processing
Certificates of Completion.
In the area of buildings development, Shauket is a seasoned engineer who is highly experienced in
scheduling, project coordination and quality control. Shauket’s greatest assets are his strong problem-
solving skills and a flexible approach to meeting the changing needs and requests of clients.
Prepared Erosion and sedimentation control drawings, Selecting location of gravel pads at main entrance and exit locations, collars / donuts around catch basins, silt and construction fence to control sediments and movement of public and construction traffic, as per City of Calgary requirements.
Prepared specifications for Storm, sanitary, water, concrete and asphalt in a subdivision for Calgary Stampede – Trans Alta building and Calgary Arts Academy.
Ranch Land Sub Division (City of Medicine Hat)
Prepared rough grading plan for roads and lanes on Medicine Hat Ranch land Sub-Division, for major, collector and residential roads, designating trap low areas, locations of intersected catch basins, using City of Medicines Hat and TAC specs. Calculation value of K for vertical curves and using transitional grades of 4% at intersections of collector and residential roads. Tying existing roads grades to the designed grades as per TAC specs.
Fixing RIM elevation of Storm and sanitary (S-1 / 5A) manholes based on new designs.
Checking storm manholes for energy dissipater requirements.
Checking all sanitary manholes for interior drop requirements. Deer foot South Phase 3 (Calgary Airport Development Authority)
Review and comment on TIA and Structural Pavement design report for Deer foot South Phase 3 Project for Calgary Airport Development Authority.
Prepared Kick off quantities, budgeting and cost estimates for Calgary Stampede – Trans Alta building and Calgary Arts Academy and Deer foot South Phase 3 Project.
Performed inspection to ensure contractor is achieving compliance in his construction according to the contract plans and specifications for all phases of the development.
Review compaction and densities report from Geotechnical Engineers.
Prepared deficiencies and discrepancies report.
Provided missing information to contractor.
Maintained an awareness of safety and health requirements and assuring compliance of applicable regulations and contract provisions.
Communicate and coordinate with multiple contractors, sub-contractors, sub-consultants, Client and others on an as required basis to ensure project schedule and budgets are being met.
Record daily field reports including field inventory of progress on a daily basis with photographic record as warranted; record incident and update all affected parties.
Performed Construction Administration work such as progress payments, contemplated change order, force account, and conducting weekly site meeting and minutes etc.
Involved in measurement of quantities for payment computation. WSP Canada Inc: (Designer) February 2012 to January 2014
Project List:
Multiple Projects.
Development of site plan from site survey, using AutoCAD
Development of process flow diagram using Auto Flow
Development of P&ID, using Auto flow and AutoCAD.
Review vendor’s drawing and comments for clarifications.
Working on mark-ups on SITE PLAN, PFD, and P&ID.
Working with engineering for early completion of drawings for design review.
Following company design standards while completing assigned projects.
Working on drawing index and up-dating it.
Working with document control for missing drawings and numbers. City of Red Deer: (Project Coordinator / Designer) March 2009 to January 2012
Project List:
Garden Heights – Residential Sub Division.
Timberland Phase 1 and 2. Residential Sub division.
Queens Business Park Industrial Sub Division.
Low cost Housing Project for 1st. Nation. Residential Sub Division.
67 Street and Orio Drive Intersection. Road Intersection.
Industrial Sub Division south of Queens Business Park and west of High way 2. Annex to City of Red Deer.
Preparing terms of reference (TOR) and advertise for RFP from various consultants, evaluate proposals as per City's points system, and appointing consultants for the said project. Authorizing progress payments of contractors and consultants as well as maintaining tracking spread sheets for their invoices.
Coordinate and monitor all aspects of assigned projects through meetings, inspection and correspondence with all involved. This includes responding to complaints regarding project construction, and necessary action to ensure issues have been resolved.
Review and comment on construction drawings, (TIA) Traffic Impact Assessment, contract documents submitted by consultants to ensure they conform to City standards. Identify requirements and anticipate problems / issues with respect to construction and public / worker safety as they pertain to the project design.
Communicate with consultants, contractors, and City departments, through written and verbal communication with respect to all assigned projects. Respond to complaints with regard to roadways and subdivision construction and ensure issues are resolved.
Monitor and inspect site construction related to subdivisions to confirm compliance to the City standards, and ensure deficiencies are corrected. Responsible for on-site decisions, with respect to design changes. Process Construction Completion and Final Acceptance Certificates and make recommendations for approval or rejection to supervisor.
Communicate verbally and in writing within Engineering Services, consultants’ utilities companies, and contractors regarding project information, cost estimates.
Involved in Sub division construction and off-site Levis budget and its monthly and annual cash flow up till 2021, as well as recommend improvements to City’s Guidelines and Contract Specifications annually. Sunbow Consultants : (Engineering Field services Coordinator) May 2005 to December 2008
Projects List :
Evergreen Phases 6 - 10, Copperfield Phases 15 - 24
Aspen Woods Phase 2:
Monteux Phases 4, 5 and 6
Responsibilities:
Responsible for the inspection of water, sanitary and storm sewers, maintaining records of elevations, slopes and length of underground utilities and water pressure tests, coordinating and supervising compaction on site specially around Man hole, service valves, ensuring compaction is done in layers and not exceeding city’s specifications.
Coordinated works with City Inspectors and geotechnical engineers, answering field-order in reference with drawings and city specificatons, answering contractors queries in coordination with design office.
Coordinating with company’s surveyors for various staking activities all over projects.
Facilitated approvals for under-cut during road construction, also facilitated survey for underground services, calculated take-off quantities, schedules, budgeting and reconciled progress payments of various contractors.
Calculated oversize services, coordinated for sedimentation and erosion control activities with consultants and implemented work as per recommendations of environment consultants, performed site walk with city inspector and contractors for surface and underground services CCC/FAC, recorded deficiencies for rectification.
Sign-in and sign-off contracts with URD services (Urban Residential Distribution), record deficiencies and facilitates URD for co-ordination with underground contractor. Buildings Development : (Asst. Superintendent) March 2004 to April 2005
Country Hills Toyota Dealership, Calgary, AB: Assisted with construction of a 55,000 square foot covered area. Communicated with contractors, architect, City personnel and all related consultants; supervised pilling, grade beams, steel structures, external cladding, excavation and backfilling; checked blocking masonry and calculated and ordered concrete quantities. Inspected underground services and recorded specifications as per drawings; identified density test locations and did hammer testing for disputed concrete.
Arena at Sylvan Lake, AB: Assisted with construction of 35,000 square foot arena. Communicated with contractors, architect, City personnel and all related consultants; supervised pilling, grade beams, steel structures, external cladding, excavation and backfilling; checked blocking masonry and calculated and ordered concrete quantities. Inspected underground services and recorded specifications as per drawings, identified density test locations and did hammer testing for disputed concrete.
Hotel Renovation, IBG Construction Ltd, Greater Toronto Area, ON: Supervised renovation of various hotels in the Toronto area, including Holiday Inn Select (120 rooms), Holiday Inn York Dale
(350 rooms) and Four Point Sheraton at St. Catherine (400 rooms). Shauket was involved with issues such as guest safety, noise factors, sequence of work, schedules, timing, handling and storing material and coordination with hotel management and maintenance team.