Post Job Free
Sign in

Mechanical Engineer Manager

Location:
Doha, Qatar
Posted:
July 19, 2016

Contact this candidate

Resume:

B ANTONIO HERNET FERNANDO

Appointed Person (AP) for Lifting & Plant coordinator

Mobile: +974-****-**** (Qatar)

Mobile: +91-465*-****** (India)

E-mail:**************@*****.***

Objective

I'm self motivated enthusiastic qualified Mechanical Engineer with over 10

years experience in Cranes / lifting Equipment industry. To be a part of a

forward looking organization based in the Middle East Region that provides

an atmosphere of mutual growth and benefits, where I can utilise my skills

and strengths at the best for the benefit of the organization.

Key Skills

. Excellent observation skill

. Excellent Inspection and Verification skill.

. Excellent Training & Assessment skill.

. Trouble shooting and analytical skills.

. Time management skills.

. Creative with effective interpersonal skill and organizational

abilities.

Computer Skills

Microsoft Office Package.

AutoCAD 200-2008.

Pro-E.

CATIA.

ANYSYS.

PRIMAVERA.

Strengths

. Conversant with various BS EN, API, ASME standards and LOLER, PUWER,

QP regulations, LEEA, LSA codes of practices.

. Excellent in manpower control.

. Extensive knowledge of different maintenance practices.

. Strong, coordinating, planning and problem solving abilities.

. Quick learner.

. Ability to work under pressure, time-sensitive, fast-paced

environments.

. Ability to enhance productivity.

Educational Qualification

. B.E in Mechanical Engineering from Anna University (C.S.I.Institute

of Technology), Thovalai with 63.50% in 2007.

Professional Certification

. Lifting Equipment Engineers Association, (LEEA), UK, Group 1 - Part I

Entry Level (Grade 1).

. Lifting Equipment Engineers Association, (LEEA), UK, Group 1 - Part

III Lifting machines manual.

. LEEA's Appointed Person (AP) for lifting operations.

Professional Experience

Current Organization: Murray & Roberts Contractors (Middle East) L.L.C.

Designation: Lifting Supervisor & Plant Co-ordinator ( Appointed Person for

Lifting ).

Duration: from 17th May-2015 [Presently working till date].

Reporting Person: HSSE Manager & Project Director.

1. Planning and execution of all Lifting activities, in accordance with

BS, ASME, API Standards, LEEA, LOLER, and Qatar Foundation

Regulations.

2. Conducting Lifting Induction to all personnel in the lifting team,

management and sub-contractors etc.

3. Review and approval of sub contractor's lifting plan and verifying

whether the same has been implemented at the time of work in site.

4. Inspection of all Lifting equipments, heavy equipments, lifting gears

in a periodical basis(quarterly basis).

5. Assessment of all lifting equipment and heavy equipment operators.

6. Conducting and recording lifting coordination meeting between the

project construction department and subcontractor.

7. Develop and maintain Lifting Equipment Management System.

8. To develop and maintain Lifting Equipment inspection and

certification planning, strategies and procedures.

9. Verify adherence to Lifting Equipment standards and procedures of the

project and contractors.

10. Maintain communications with external maintenance expertise groups on

lifting equipment.

11. Provide on the job training and coaching for persons related with

lifting activities.

12. Provide periodical surveys of the lifting equipment and heavy

equipment, so as to achieve it's safe and efficient operation,

maintenance and repair.

13. Provide full independent inspections and certification of lifting

equipment, including reporting of findings and advise to the

supplier/manufacturer.

14. Ensure that the project databases are updated with respect to lifting

equipment inspection status.

15. Issue the appropriate documentation relating to any inspection

activity to the project.

16. Responsibilities include the activities of project lifting equipment:

Inspects, checks, raises anomaly reports, repairs, replacement

works.

17. Ensure all inspection, repair and testing are in accordance with

codes, standards and approved procedures.

18. Acting as a part of the emergency response team and planning all

kinds of rescue activities. ( MEWP to MEWP rescue, Working at height

rescue etc).

Past Organization: Applus Velosi / Qatar - Doha.

Designation: Lifting Inspector and Trainer

Duration: from 09th October-2011 to 07th May-2015

Reporting Person: Operations Manager &Asst.Operations manager[Lifting

department]

1. Planning and execution of inspection, testing and certification of

various Lifting equipments, Material handling equipments, in

accordance with BS, ASME, API Standards, LEEA,LOLER and Qatar

Petroleum regulations.

2. Verification/Thorough Examination of Electric Lifts, Elevators as per

BS EN 81, Passenger/Material Lift.

3. Verification and testing of Elevators for the NEW and Existing

Elevators in NDIA, New Doha International Airport.

4. Verification/Testing and Thorough Examination of different types of

Cranes such as Truck-Mounted Crane, All Terrain Crane, Crawler Crane,

Rough Terrain Crane, and Lorry Loading cranes, tower cranes (BS 7121).

5. Verification/Testing and Thorough Examination of mobile elevating work

platforms, aerial elevating work platforms, Industrial forklift

trucks, Telehandlers etc.( BSEN 1459)

6. Verification/Testing and Thorough Examination of Mast elevating work

platforms (MEPW), suspended work platforms (cradles), Building

Maintenance Units etc. (BS EN 1495:1998)

7. Verification/Testing and Thorough Examination of, hydraulic /

pneumatic operated tugger winches, capstan winches, man rider winches

etc.

8. Verification/Testing and Thorough Examination of Goliath/Semi Goliath

Crane, Electrically Operated Overhead travelling Crane, Slewing Jib

Cranes and Davits, Runway Beams.

9. Verification/Testing and Thorough Examination of Hand Powered

Equipments such as Chain Block, Lever Hoist, Jaw Winches, beam

trolleys, Snatch block, Hydraulic Jacks, Tripod stand with hand winch,

pallet trucks, A-frames, lifting beams, spreader beams etc..

10. Verification/Testing and Thorough Examination of Lifting Gears such as

Wire ropes, Wire rope sling, Shackles, Hooks, Sheave blocks, webbing

slings, pad eyes, eye bolts, wedge sockets, spelter sockets,

turnbuckles, etc.

11. Verification/Testing and Thorough Examination of Lifting sets of

offshore containers, man riding baskets, material baskets, line spool

skids etc.

12. Verification/ Thorough Examination of cargo nets, Jumbo bags.

13. Verification/ Thorough Examination and calibration of tensile test

beds.

14. Review& witness of Lift Plans and Procedures for critical heavy lifts

and witnessing of heavy lift operations.

15. Performing Pull-out test for various types/classes of anchoring

devices(anchor bolts), using Pull-out testing machine.

Lifting Trainer:

1. Basic rigging and slinging training.

2. Mobile crane operator training.

3. Lorry Loader crane operator training.

4. Tower crane operator training.

5. Manlift / scissorlift operator training.

6. Banksman training.

MAJOR PROJECTS ( FULL-PLANT / SHUT DOWN SITE INSPECTION ):

1. QATAR ALUMINIUM PLANT, MESAIEED - DOHA, QATAR.

2. QATAR STEEL PLANT, MESAIEED - DOHA, QATAR.

3. LUSAIL SEWAGE TREATMENT PLANT, DOHA QATAR.

4. QATAR PETROLEUM FINANCIAL DISTRICT, DOHA QATAR.

5. DOHA WEST SEWAGE TREATMENT PLANT, DOHA, QATAR.

6. DSWMC(DOMESTIC SOLID WASTE MANAGEMENT CENTRE) MESAIEED - DOHA - QATAR

7. LUSAIL - LRT PROJECT, DOHA - QATAR.

8. BARWA FINANCIAL DISTRICT PROJECT, DOHA- QATAR.

9. BARWA COMMERCIAL AVENUE PROJECT, DOHA- QATAR

Verification / Inspection of all the lifting tackles and equipments in the

plant / site.

Prev?ous employers

Organization: Ayoki Fabricon Pvt.Ltd - Pune

Designation: Sr. Lifting Engineer.

Duration: 20th July-2009 to 30th September - 2011 (02 year and 03 months).

Reporting Person: General Manager (Projects&Maintenance) and Executive

Director.

Responsibilities:-

1. Maintenance supervision of in-house heavy construction equipments,

plant and machinery which includes hydraulic mobile cranes [P&H,ACE,

Escorts, Standard etc] with various capacities, crawler mounted

cranes [NCK RAPIER,P&H KOBELCO,AMERICAN HOIST,ZOOMLION,TATA ALC etc]

with various capacities, Earthmoving machinery such as wheel loaders,

backhoe loader, Motor Grader [ CAT, KOMATSU, JCB etc ]forklifts [

HELI, escorts] with capacities ranging from 2 to 8 MTs, diesel power

generator sets with engines such as Cummins, Ashok Leyland, welding

rectifiers of ESAB, plus various light and heavy transports vehicles.

2. Management of Crane Maintenance Workshop, availing out the

requirements and types of crane for our sites.

3. Performs site inspections of plant & equipment at various construction

sites and co-ordinate with project representatives at different

levels.

4. Supervises and controls the work force with various trades.

5. Inspected different levels of lifting equipments in a daily basis.

6. Designed and modified different components for crane.

7. Prepared and submitted comprehensive technical reports directly to

upper management with recommendations for implementation of different

levels effective scheduled maintenance practices thus ensuring safe

and efficient operation & preventing costly break down.

8. Successfully supervised major overhauling and load testing of

following cranes:

a. NCK RAPIER 1495 B crawler lattice boom crane with 90 MT

capacities.

b. NCK RAPIER 1405 B crawler lattice boom crane with 70 MT

capacities.

c. NCK Atlas 605 2B crawler lattice boom crane with 40 MT

capacities.

d. NCK Atlas C54B crawler lattice boom crane with 60 MT capacities.

e. NCK Andes C41B crawler lattice boom crane with 40 MT capacities.

f. P&H Kobelco 335 crawler lattice boom crane with 35 MT

capacities.

g. Link Belt - Sumitomo Hitachi lattice boom truck mounted cranes

with 45 MTcapacities.

h. RB SC 600 crawler lattice boom crane with 60 MT capacity.

9. Managing & handling a crew of 150 members which includes Crane

operators, Crane engineers, Fabricators, Electricians & other

unskilled labors.

10. Issuing of Purchase orders and Invoices for the dealers according to

the requirement.

11. Acquiring of all the documents such as tax, insurance, fitness, load

test certificates of all automobile of the company.

12. Managing the funds for the maintenance department. Planning and

availing for the same as per the ISO procedures.

13. Purchasing of consumables and tools with proper negotiations,

according to the requirement of the sites in India and Overseas.

14. Procurement of spares for Cranes, Welding Rectifiers and Transformers,

Grinding machines, plate bending machines etc which comes from all the

sites to our repairing workshop.

15. Conducting load test of Cranes like Crawler Cranes, Tyre Mounted

Cranes, and Hydra Cranes and assuring the smooth functioning of cranes

at sites.

16. Acquiring of papers for taxation, Insurance policy for Cranes, Hydras

and other vehicles.

17. Monitoring, updating and submitting of project schedules and reports

on weekly / monthly basis based on their priorities.

18. Monitoring periodical progress of work.

19. Proper filing of all documents for cranes, vehicles, purchase orders,

invoices.

Organization : RS Wind Tech Pvt. Ltd /Tamil Nadu -Aravaimozhi.

Designation : Service Engineer.

Duration : December 2008 to May 2009.

Reporting Person : Service Manager.

Responsible for servicing and smooth functioning of the windmills.

Organization : Maxtherm Technologies Pvt. Ltd/Tamil Nadu -Chennai.

Designation : Jr.Mechanical Engineer.

Duration : October 2007 to November 2008.

Reporting Person : Manager.

Responsibilities: -

1. Preparation of mechanical designs.

2. Preparing overall and detailed program for production.

3. Managing planning department with 10 personnel.

4. To check whether all the activities are according to the ISO

procedure.

5. Monitoring and updating of project schedules, weekly/monthly report.

6. Preparation of work breakdown structure, bar charts, resources.

7. Histogram & S- Curve, progress measurement criteria & analysis.

8. Monitoring periodical progress of work [Fabrication of Boilers].

9. Prepare monthly work schedule.

10. Attend the relevant meetings without department/ concerned engineers.

11. Submitting monthly report and weekly reports.

12. Checking & making arrangements for NDT & Stress relieving during

fabrication.

Personal Information

FATHER'S NAME : C. Benedict Fernando.

DATE OF BIRTH : 01.07.1986 .

SEX : Male.

NATIONALITY : Indian.

MARITIAL STATUS : Married.

LANGUAGES KNOWN : English, Hindi, Tamil, Malayalam & French

PASSPORT DETAILS

PASSPORT NUMBER : G6850512.

PLACE OF ISSUE : NAGERCOIL

DATE OF ISSUE : 24.01.2008

DATE OF EXPIRY : 23.01.2018

DRIVING LICENSE DETAILS

PERMANENT FOUR WHEELER DRIVING LICENSE

LICENSE NUMBER : 286********

COUNTRY : QATAR

Personal Interests

. Heavy Lifting

. Boxing

. Driving

. Cooking

References

Reference contact numbers to be issued upon request.



Contact this candidate