Post Job Free

Resume

Sign in

Management Engineer

Location:
Dallas, TX
Posted:
July 14, 2016

Contact this candidate

Resume:

Resume

Odungide, David E

Position desired – Drilling Training Specialist Engineer .

Date of Birth: March 24, 1974

Sex: Male

Nationality: United States of America (US National)

Marital Status: Married

Mailing Address: 14507 Marshall Bridge Lane

Sugarland, TX 77498

+1-832-***-****

acvpf8@r.postjobfree.com

Profile Summary:

David is an experienced technical professional (Petroleum Engineer) with over 17 years of extensive technical, business development and management experience in the upstream oil and gas industry. David responsibilities cover horizontal well completion and hydraulic fracturing designs in the US onshore unconventional horizontal shale gas plays in Eagle Ford, Haynesville and Wolfcamp as well as Offshore wells in the Gulf of Mexico for EP Energy (an Independent Exploration & Production Company) in Downtown Houston, Headquarter Office. Prior to joining EP Energy, David was responsible for the development of Akepo & Ajapa fields (Outer Continental Shelf) from discoveries through appraisal up to first oil within an aggressive 17 months period, as the Project Team lead, in charge of planning, regulatory, budgeting, scheduling, supply chain issues and overall project management. David expertise covers drill well design and completion planning including horizontal completions and stand alone screens, generation of Design Basis Memorandum (DBM), operation integrity management covering Wellbore Risk Management System (WRMS), drilling and completion, workover wellwork and on-site rig support, providing engineering advice, preparing budgetary and AFE cost breakdowns. A fit-for-purpose production engineer, problem solver, delivering cost effective solutions to various well design challenges and applications. Known for applying successes in one area to other customer challenges, he championed the installation of ESS & Inflow Control device (ICD) in horizontal wells for ExxonMobil which resulted in a paradigm shift in completion strategies with over 4500 bopd production uplift in fields that were traditionally making less then 1500 bopd. Acknowledged as effective resource person providing development information for well design and construction, expertise includes Sand Control, Completion Design, Cementing, Stimulation and quality control and ability to mentor less experience engineers.

David is a very focused and achievement oriented person, team leader and motivator.

Education: Bachelor of Engineering (Petroleum Engineering) B. Eng. (October 1995 )

(Best Graduating Student in Engineering)

University of Port Harcourt.

Business Contributions:

Develop the blue print for EP Energy Asset Retirement Obligations (ARO) process with all stakeholders.

Designing of stimulation treatments (hydraulic fracturing) in unconventional reservoirs (Eagle Ford, Haynesville and Wolfcamp shale plays).

Streamline the stewardship reporting process with US Security and Exchange Commission (SEC) and the Texas Regulatory Agency (T-RRC) in charge of onshore Oil & Gas operations as it relates to P&A liabilities.

Instrumental in the design and setting up of processes in Sogenal (Oil & Gas Independent Company) which currently operates Akepo field in Partnership with Exile Resources of Canada and ChevronTexaco

Successfully negotiated the Joint Operating Agreement (JOA) with the technical partners within a record time of 1 month.

Prepares, review and negotiate international petroleum agreements - sales and purchase agreements.

Prepares and provide relevant data on acreage positions for investor & financial presentations.

Lead networking effort to create access to new venture opportunities.

Drill well planning, AFE costing, budget monitoring and management.

Completion materials and service specifications and selections.

Planning and engineering of well completion programs with focus on safe and environmentally responsible procedures, to include technical research, procurement of services, cost estimating and AFE preparation for various wellwork projects.

Knowledgeable in downhole completion tools and equipment designs, specifications and datasheet. Completed over 60 well completions projects to date. Design covers Horizontal completion with stand alone screens (SAS), gravel pack, gas producers & injectors, allpath completions with shunt tubes, inflow control device (ICD) and expandable sand screen (ESS) among other completion type.

Maintains and ensure competitive advantage through the effective use of technical innovation, cascade learnings throughout the organization by organizing lessons learned forum and after action review (AAR) meetings at the end of every operation.

Creation and implementation of completion operations best practices. Evaluation of Completion Efficiency Index (CEI) for all completions versus production stewardship.

Lead multi-disciplinary technical team to identify and mitigate potential hazards during all well planning phases especially Operations hazards induced by completion operations such as near wellbore interference during well treatment.

Organized field operations review meeting with production personnel, mentored engineers in training and ensured quality technical content by auditing.

Work Experience and Proficiencies within the last 3-5 Years:

Drill Well Planning and AFE Costing

Casing Design

Cementing & Zonal Isolation Design

Well completion Design including equipment specification and selection.

oStimulation Treatments (Hydraulic Fracturing) in unconventional shale reservoirs

oScreen type selections for different applications

oGravel Pack Tools selections for various applications – Frac Pack, Deviated Cased & Perforated Gravel pack, Horizontal Open Hole gravel pack among others.

oFluid Pumping Design – Drilling mud remediation, Frac Packing, Horizontal gravel packing, remedial acid stimulation.

oESS Design and Application

oInflow Control Device (ICD) design & deployment.

Tubing Design using Load and Resistance Factor Design (LRFD) as well as deterministic working stress design (WSD) methods.

Drilling & Completion Designs: Writing of Drilling and Completion procedures.

oOrganize DWOP & CWOP reviews prior to actual work execution.

Workover Design: Writing of Workover procedures

Workover Supervisor: Jack Up rig Offshore

Cased Hole Log Interpretation (Non-Rig Wellwork)

Xmas Trees and Subsurface Equipment

Workover Well Control

Coiled Tubing/Stimulations-Matrix & Fracture

Conformance & Profile Control

Well Surveillance & Productivity Analysis

Artificial Lift-Design & Optimization-Pump (ESP)

Artificial Lift-Design & Optimization-Gas Lift

Sand Control Champion and database coordinator.

HP/HT & Hostile Environment Well Design

Subsidence/Compaction

Wellbore Flow Assurance

Well Testing Design & Execution

Capacity Enhancement & mentoring of less experienced engineers to achieve early competency System.

Roll out & Implementation of Well Work Management System.

Wireline & Workover Field Supervision

Economic Analysis & Investment Evaluation

Decommissioning & Abandonment

Strong Skills

Over 80 completion designs to date covering horizontal wells, gravel packed, predrilled/slotted liner, high angle and deviated wells as well as conventional wells.

Production optimization using Nodal Analysis tools to identify candidates for remedial workover operations resulting in production uplift of over 4500 bopd and 80mmscf/d.

Strong technical and analytical skills.

Good business decision and excellent team player.

Very concerned about the cost effectiveness of operation and explore new ways of reducing cost.

Strong leadership and mentoring skills.

Always eager to take up new challenges.

Professional Experience:

EP Energy (El Paso) Exploration & Production Company, Houston Downtown Jul 2011- to date

Production & Completions Engineering Advisor

Steward the Asset Retirement Obligations (ARO) with Texas Railroad Commission (T-RRC) and the US Bureau of Safety and Environmental Enforcement (BSEE) for the Central & Southern Divisions of the company.

Leveraging stimulation experience from multiple shale basins to optimize hydraulic fracturing designs and successfully execute fracturing treatment in the field.

Cluster space optimization to ensure efficient stimulation coverage.

Writing completion, plug drill-out and workover procedures, preparing cost estimates (AFEs) & economic justification for capital projects, and reconcile against actuals for well completions activities

Managing capital completions/re-completion programs (planning, provide cost evaluations & assessments; logistics, project tracking and execution) to ensure that project objectives and costs are in line with AFE.

Liaising with Asset Team (Geology/Geophysics/Reservoir Engineering) to make recommendations on the appropriate use of existing technologies (OVS, mud mass spectroscopy, tracers etc) to enhance completion operations and cost efficiencies.

Material selection for composite frac plug, “frac, plug & perf” operations, coordinating logistics and modeling water requirements for single and multi-well (pad-zipper fracs) hydraulic fracturing projects.

Technical and commercial review of vendor proposals to ensure the most technically sound and cost effective methods are employed to complete wells.

Interacting with service companies, coordinating detailed programs and end of project reports.

Identifying cost drivers and risks associated with various completion procedures, mitigating against the identified risks; and implementing opportunities for cost optimization.

Implemented a proppant and chemical mass balance audit system which currently results in $250,000 cost savings per hydraulic fracturing project.

Delivered improve capital performance by optimizing Eagle Ford field stimulation operations (cycle time for a 38 stage operation has been enhanced from 3.8 to 5.8 stages/day.

Sogenal Limited (Oil & Gas Company), International, Rotating out of Houston Sep 2008- Jun 2011

Production Manager/ Drilling & Completions Engineering Manager/ COO

Developed a 5 year strategic business plan for the Independent Oil & Gas Company.

Set production targets and manage/exceed production expectations in line with corporate stewardship.

Advised technical personnel, engineers and geologist on technical issues relating to field development and production.

Provide support to operations and manufacturing center. Responsible for equipment & material specifications and selections. Meet with service providers to develop and design fit-for-purpose products and services.

Developed custom-fit design for upper and lower completion jewelries, premium screens, flow control valves, trained customers and field personnel on these new products.

Provide day to day technical and administrative management of the company’s asset and portfolio.

Provide guidance to the Company’s operations team.

Provide technical support to completion and well testing operations.

Develop conceptual completion and well testing designs, AFE estimating and final costing for approval.

Develop final completion designs including equipment specification and selection and review completion performance to ensure effectiveness of design.

Participate in technology exchange worldwide and appraisal of new technologies.

Develop custom-fit plans and procedures for company’s operation as an Independent Oil & Gas company.

Coach and mentor new hires and operations personnel and develop a succession planning with a view to attaining Early Competency Milestones within a short period of time.:

Customized solution for various Sand Control Applications and Designs – Stand alone Screen (SAS), Cased Hole Gravel Pack Application, Open Hole-Horizontal Gravel pack with shunt tubes, High rate water pack among others.

Evaluation of Completion Efficiency Index (CEI) for all completions versus production stewardship.

Liaise with government and other regulatory agencies to ensure compliance with statutes & regulations

Performed root cause analysis on completion tools/products. Cascade the lessons learned throughout the organization.

Bayelsa Oil Company Limited (Oil & Gas Company) Feb. 2008 to Sep. 2008.

Drilling Operations Manager

Development of Strategic business plan for a new Independent Oil & Gas Company in Nigeria.

Management of portfolio divesture and strategic acquisition for OML-46 and OPL 240. Provide day to day technical and administrative management of the company’s asset and portfolio.

Provide guidance to the Company’s operations team.

Develop custom-fit plans and procedures for company’s operation as an Independent Oil & Gas company.

Coach and mentor new hires and operations personnel and develop a succession planning with a view to attaining Early Competency Milestones within a short period of time.

Successfully implemented a step change management initiative in BOC by retrieving the ownership of the company which was previously held by a few individuals to reflect the ownership by the Bayelsa State Government. (This involves a lot of negotiations with the previous directors to relinquish their interest in the company without causing any security incidents).

Successfully represented the company during the National Assembly (Senate Committee on

Petroleum Resources –Upstream) investigation on the award of oil blocks from 1999 to 2008.

(BOC still retains their oil blocks OML-46 Atala Marginal Field and OPL 240).

Developed functional stakeholders management plan in dealing with the community for

BOC. Successfully, organized an open forum with the 3 host communities of Azegbene, Ezetu and

Ekeni of Bayelsa State.

Conducted sensitization of impacted communities to seek alignment with project delivery expectations and signed Memorandum of Understanding (MoU).

Reviewed Environmental Impact Assessment (EIA) report with representatives from the

various communities. Sensitize the stakeholders on impact & mitigation plan with respect

to Project Execution.

Developed and obtained approval for $1 M USD for sustainable community development

Program and recruited community liaison officers for each of the core communities.

Developed and set up Project Advisory Committee (PAC) for BOC. The PAC consist of

the following stakeholders – Community Representatives, Bayelsa State Government,

security agencies, contractors and BOC representatives.

Build human capacity through deliberate employment of both skilled & unskilled labour

during project life.

ExxonMobil (Lagos, Houston, Aberdeen) Dec. 1998 - Feb. 2008

Drilling & Completion Engineering Supervisor (appointed Supervisor 2006)

Team lead East Area Gas Project (EAP) with a total installed capacity to compresses 240 MMSCF of Gas per day. Total Project Cost - $900 M USD

Championed the Design and Installation of Inflow Control Device (ICD) as a sand control measure resulting in a paradigm shift in completion strategies in ExxonMobil Nigeria. The technology resulted in additional 4000 BOPD uplift of oil production in fields that were traditionally making 1500 BOPD after completions. Also recognized and given award of excellence for this feat by the Corporation.

Mentored and coached new hires (Engineers) to enable them complete early Competency Milestones within a stipulated cycle of 3 years as against the corporation target of 5 years. Supervised over 12 new engineers in the Drilling & Completions group (Subsurface Engineering Job Family). Recognized and given award of excellence for strong leadership by the Company (MPN) Management.

Provide functional guidance for the Erha Deepwater Operations Subsurface Engineering team and ensure timely well surveillance/wellbore integrity and management for all wells. Coordinate the Erha Deepwater Nigeria Drill team activities with Central group in Houston –Total Project Cost - $2 billion USD

Drilled, Designed and completed over 60 Completions and workover jobs to date. The completion designs include, Horizontal completions with stand alone screens, gravel pack, Gas Injectors, Allpath Completions with shunt tubes among other completion designs–Total Project Cost - $ 800 M USD

Custodian of Drilling and Completion Engineering Contracts for MPN.Stewarded over 40 Drilling and Completions contract with inventory value exceeding $4 billion USD. Provided technical guidance and supervision to the shorebase warehousing group in Onne Port Harcourt for flawless and timely allocation of materials to support six (6) active Jack up Drilling Rigs offshore Nigeria. Equipment inventory was valued at over $ 900 M USD as at end of January 2008.

Liaising with JV Partners (NNPC-NAPIMS/NCD) to set up Drilling and Well completions contract valued at about $1,950 M USD to actively support ongoing Drilling Programs. These involve 3–stages of Tender Evaluation process: Prequalification, Invitation to Tender (Technical Evaluation) and Commercial Evaluation. Cost savings of over $400 M USD realized using the unified sourcing strategy developed by the core asset team (for which I was the teamlead)

Quarterly Drilling Equipment & Materials Audit and Performance review with service providers. This effort resulted in about $59 M USD of savings to ExxonMobil.

Developed and maintain a database for tracking, allocating and managing of Drilling Materials for timely and flawless well operations.

Assist in the pre-planning, job execution and post job analysis of different cement jobs (liner, squeeze, production, surface and intermediate) for various Drilling and Completion designs.

Promotes service excellence and company satisfaction by providing training and guidance to field personnel.

Review performance data to identify trends and opportunities for performance improvement.

Promote and encourage safety and service quality.

Monitor field performance assessment.

Implement new products and services.

Assist employee with resource development and also train and mentors employers.

Ashland Oil (Addax Petroleum) (Lagos, Nigeria) Nov.1996- Dec.1998

Reservoir Engineer

Estimation of Remaining Reserves, Reservoir management & Simulation study.

Determination of natural and gaslift wells production performance using advanced computer software.

Periodic evaluation of existing & new well design.

Daily reception and review of database for error validation.

Maintenance of correct casing gas injection volume & operating pressures of wells on gaslift.

Frac - pac job Design, Execution and Evaluation as well as engineering bid proposal evaluation from vendors.

Conduct and Evaluate Bottom Hole Pressure Survey Data

Material Balance Computation for Izombe and Adanga Reservoirs

NOMINATIONS/TECHNICAL POSITIONS/OTHER SOFT SKILLS

OVS, Transform Analytics -2015

OpenWells, FracproPT, Aries, Prosper 2011 - 2015

Wellview Champion – Upstream Well Planning Team 2006-2008

Sand Control Database Champion (2003 -2008)

Well Evaluation Model (WEM) – Team lead.(2000-2008)

ToolPro Upstream (Drill Team) Lead.(2008)

Nodal Analysis Tools – Prosper, SAM, WEM

OFM –Oilfield Manager for Production Surveillance.

PROFESSIONAL AFFILIATION

Member, Society of Petroleum Engineer

HOBBIES

Reading, Traveling, Lawn Tennis.

REFEREE

Available on Request.



Contact this candidate