Post Job Free
Sign in

Project Quality

Location:
Padang, Sumatera Barat, Indonesia
Salary:
Rp.25000000
Posted:
July 12, 2016

Contact this candidate

Resume:

Faisal Tanjung

E-mail: acvoad@r.postjobfree.com

Address: Taman Sari Hijau, Block B1 No.19

Tiban Baru – Batam,

Kepulauan Riau – Indonesia

Mobile / Telphone : 62-081*********

SUMMARY OF EXPERIENCES

During 3 years since 1999 until 2002 experience on Assembly Manufacturing whether the job description scope are active to guide a team leader to achieve production target (Output and shipment control ),making schedule of Improvement Activity to supports all production needed whether related to time and motion study, machine capacity - efficiency, and manpower arrangement, daily and monthly Man hours performance control, active to improve and control production expenses ( indirect material) consumption.

13 years more Experiences in Site Inspection Fabrication since 2003 until now. Familiar with Code and Standard such ASME, AWS,API,ASTM and DNV. Able to work as a teamwork. Primary function of the job performs the site inspection and follow up activities of the welding and fabrication activity, including piping process, whether the scope related to Piping Metallurgy, Material Properties, Mechanical Properties ( Elasticity, Strength, Toughness, Hardness ), Steel Pipe Manufacturing, Pipe selection, Compositions of Increased Corrosion Resistance, Mechanical Test, Impact test methods, and acceptance criteria, Fluid Service Requirement for materials. Fabrication, Assembly and Erection, Inspection, Examination and Testing, Hydrostatic and Pneumatic Testing.

Understanding and have knowledge in an OCTG ( Oil Country Tubular Goods )Manufacturing,

whether keep some of requirements for OCTG Manufacturing such as Material, Hydrostatics test, Drift testing, Non Destructive Examination ( NDE ),Traceability, Surface preparation, End finishing, Thread and Pipe protection, Pipe Coating, Certification requirements, Marking, and Third Party Inspection.

Good understanding of technical drawing, Oilfield Standard Specifications and Vendor’s Quality Plan.

Understanding and have knowledge with threading inspections and Specifications.

* API Spec 5 CT and API Spec 5B - Tubing : 8 rounds, modified, 10 rounds, upset/Non Upset

- Casing : Buttres, modified, Short round Casing ( SC ), Long round

Casing ( LC ) and Non API Connection ( Premium Connection ).

* API Spec 7 for Rotary Drill Stem Elements such as tool joints, Drill-Stem Subs, Drill Collars,

Rotary Shouldered Connection, Gauge Practice, Specification, Certification & Connection Marking.

* API Spec 6A for Wellhead and Christmas Tree Equipment, scope of material requirements,

mandrel tubing & casing, bodies, bonnets, end and outlet connections, ring gaskets, qualification

test coupons, heat treating, equipment qualification, material qualification, bull plugs and

valve removal plugs, back-pressure valves, pressure – boundary penetration, wear bushings &

hub end connectors.

*API Q1 for Quality Programs for the petroleum, petrochemical and natural gas industry.

COMPETENCY :

1)Working proficiency in Microsoft Office ( Ms Word, Excel and Power point ).

2) Understanding and have knowledge in Statistical Process Control ( SPC ), FMEA, SIX SIGMA,

Quality Management System( QMS ), QCC, etc.

3) Understanding and have knowledge in Production Planning Inventory Control ( PPIC )

4) Well versed in modularized block erection for offshore and oil & gas industry.

5) Highly experienced in Power Plant Piping, Refinery Piping And Off Shore Piping.

6) Understanding and have knowledge in Primavera Project Management Enterprise P6

7) Understanding and have knowledge in an OCTG ( Oil Country Tubular Goods )Manufacturing.

8) Understanding and have knowledge in Non Destructive Testing ( Visual, LP, MT, RT & UT ).

8) Well versed in welding processes such as SMAW, GTAW, GMAW, FCAW and SAW for high tensile strength and high yield strength materials

9) Well versed and have knowledge in Code & Standards such as AWS D1.1, ASME B31.3, ASME Sec IX, API 1104, ASME Sec VIII, ISO 11960 ( API 5CT ), API 5B, XL-System ( API 5L ),API Spec 7,

API Spec 6A and API Q1.

10).Well versed and have knowledge in code & Standards such as ASME B30.9-2006,

Safety standard for Cableways, Crane Derricks, Hoists, Hooks, Jacks, and Slings.

11).Well versed and have knowledge in code DNV OS-F101, Offshore Standard, Submarine Pipeline system.

PERSONAL DETAILS

First Name : Faisal

Last Name : Tanjung

Date of Birth : 19 JULY 1971

Gender : Male

Marital Status : Married

Nationality : Indonesian

Education/ Degree : Graduated from Bung Hatta University, Padang ( West Sumatera ) with a degree

in Bachelor of Science in Industrial Engineering.

WORK EXPERIENCE :

1.TUV NORD THAILAND

Client name is RELIANCE INDUSTRI LTD INDIA

( 13th October 2014 – 7th August 2015 )

The main job is as Third Party Inspector .

Supplier name is PT.Hanjung Bandar Lampung Indonesia, Jl. Raya Soekarno Hatta Km. 11.5

Srengsem Panjang Bandar Lampung Indonesia.

Duties of Responsible :

The scope of work activities as general are as follow :

-To review, monitor, expedite and control structural fabrication stage wise process and delivery schedule.

-To review, monitor, expedite and control raw material delivery schedule.

-To review Plan V/s Actual on daily basis for Material, manpower, Productivity, Process Flow & Quality.

-To Communicate with Vendors Team, Logistics, RIL-Project & RIL- Jamnagar on daily basis.

-Identify problems and cause of problem in above process and report to RIL on daily basis.

-Forecast problem and inform RIL-Projects immediately.

-Shop floor supervision 80% and planning and reporting office work 20%.

-Verify IRN before dispatch. Verify dispatch documents, Packing List.

-Supervise packing procedure and verify packing and loading is done according to RIL process.

-Monitor the trailers movement in transit.

The scope of work detail specific to Inspection and Test Plan :

Pre Fabrication Activities :

1.Check availability of latest drawing, project specification.

2.Verification of the raw material for : Grade/Mat Code, dimensional verification, check physical condition Free from damage, pits, cracks etc.

3.Corelation between raw material and TC

4.Verification of Welding Consumable

5.Verification of condition of backing oven

6.Verification of condition of gas, accessories, etc ( as applicable ).

7.Check & ensure the availability of applicable WPS

8.Witnessing welder/welding operator Qualification and Certification and qualification NDE Persons.

During Fabrication Activities :

1.Marking, Cutting, and drilling check number and size of holes against drawing.

2.Check baking and holding of low hydrogen electrodes ( if supplied in vacuum packed condition with no damage, re-baking is not required. However for low hydrogen electrodes in SMAW process, holding at 100 – 150 deg. C is a must.

3.Check Qualified Welder / Welding operator is being deployed on job.

4.Check whether correct WPS is being used

5.Material, Dimensional verification and fit up check prior to welding

6.Check Preheat ( if any ) and welding including back chip for groove joints.

7.Welding of fire proofing nuts as applicable

8.Verify de- burring of holes, dressing of sharp edges, straightness, welding of fire proof nuts & material surface defects if any

9.Check Identification marking of all fabricated structural for ( a ) Drawing Number, (b) Mark Number and (c ) SI. No if component is identical ( d ) Weight in KG.

10.Distortion Check after fabrication, rectification ( as necessary) and clearance .

11.100 % visual inspection of welds and checking identification marking including drawing number, mark number, and SI number.

12.Check % NDE requirement for structural and select joint / mark number for NDE & type of NDE.

13.Carry out relevant NDT on selected butt/ fillet welds ( UT/RT/PT/MT ) as applicable.

14.Check Torque of high strength bolts ( as applicable )

15.Final dimensional and assembly checks ( as applicable )

16.Painting Inspection : Inspection blasting, Inspection primer painting, inspection intermediate, inspection top coat and etc

After Fabrication :

1.Check and ensure that all fabrication inspection records are complete and compiled.

2.Issue of Inspection Release Note stage of inspection – final By TPIA

3.Check material packing and shipment

2. TUBOSCOPE NOV CHINA

( 28th July 2014 – 10th October 2014 )

a. The Main Job is as QA Surveillance Auditor ( Supplier Assessment Audit ) .

Client name is HCML HUSKY-CN00C MADURA LIMITED.

Duties or Responsible :

The scope of work activities are as follow :

-Check of the quality system of supplier.

-Check of working condition and manufacturing capability.

-Check of equipment in production & testing

-Check of material and product control

-Check of shop inspection & records

-Check of testing operators qualification

-Accreditation of manufacturing

Supplier’s name is Nippon Steel & Sumitomo Metal Corporation ( NSSMC )

Location: Amagasaki Works 1, Nishino-Cho, Higashi-Mukojima, Amagasaki, Hyogo 660-0856,Japan

Tel: +81-6-6411-7637 Fax: +81-6-6411-775

b. As Third Party Inspector,

Client name is DNO.

The scope of work activities are

-Visual body inspection

-Visual thread inspection

-API full length drift

-Tally Length

-UT Wall thickness spot check

-Internal cleaning ( ID ratting ) and External Cleaning ( Buffing OD ) to remove rust & pitting.

-Clear & re-dope thread with fresh storage compound

-Internal coating ( ID Oiling ) and External Coating with EON 408

-Re-stenciled and color code.

Supplier’s name is PT. Hunting Energy Asia

Location: Complex Dragon Industrial Park, Block D, Jl.Pattimura Kabil Batam Island Indonesia

3.PT. BUREAU VERITAS INDONESIA

( 8 November 2012 – 17 June 2014 )

As INY Inspector ( Free line Inspector ), Bureau Veritas Indonesia.

The Main Job is as QA Surveillance Inspector ( Third Party Inspection ). Client name is

Chevron Thailand Exploration and Production,Ltd.

Project Name is “Seamless Steel Pipe of Grade P110 Threaded and Couple With TP-CQ

Premium Connection Size : Casing 7” 29PPF R3 P110 TP-CQ PSL-1 Special Drift 6.125 in”

On PT. TPCO Pan Asia Batam

Responsibilities included :

Assignment for Project “Seamless Steel Pipe of Grade P110 Threaded and Couple With TP-CQ

Premium Connection Size : Casing 7” 29PPF R3 P110 TP-CQ PSL-1 Special Drift 6.125 in”

Duties or Responsible :

Witness and conducted Inspection all of equipment and tools testing base of Specification Std,

Quality plan. Review Quality record, COC, Tally and documents supporting for inspection

and prepared the release note documents of result inspection. Prepare and Issued inspections

to Lead Auditor and submitted to Customer.

4. SWIBER OFFSHORE CONSTRUCTION LIMITED Singapore,

( 18 May 2012 – 18 July 2012 )

The Main Job is as QA/QC Inspector pipeline project ( Offshore & Onshore )

Client name is Pearl Oil - Indonesia & Zawtika – Thailand.

Project name is Ruby Field ( Pearl Oil ) and Zawtika Development Project Phase 1A.

Responsibilities included :

Inspection The Roundness of pipe ( to makesure there are some of pipe ovality )

Inspection of weldments in Pipelines

Inspection of coatings

Inspection of High density Polyurethane Foam coatings

Inspection of weldments in Jacket Installation & Boat landing Installation

Holiday detection of field joints

Witnessing Non-Destructive tests

Coordinating NDT Inspections

Inspection reports preparation as per code and inspection plan

Witness the Leak test of floating Hose String at the Jetty before transportation to the Calm Buoy location

Witness Hydro testing of the Submarine Hose String.

5. PT.Citra Tubindo Engineering Batam – Indonesian

( 1 April 2012 – 16 May 2012 )

The Main Job is as Free Line QC Welding Inspector. Client name is Techlam.

Project name is Leg Mating Units ( LMU ARKUTUN-DAGISAKHALIN )

Project Number is A045.

Responsibilities included :

Performs the all kind of site inspection and follow up activities of the welding each of joint and

fabrication activity base on Welding Procedure Specification ( WPS ) approval by Client,

whether the scope related Material Properties – Base metal ( Material specification range,

Filler Metal ), fit –up, welding parameter check up, position of welding progression,

PWHT, Preheat & Inter pass temperature, techniques & electrical characteristics and

acceptance criteria.

Performs and request NDT inspection for some of joint as per Client requirement and disposition.

6. PT. QUALITY ENGINEERING SERVICE ( PT. QES ), September 2010 Until March 2014

The scope of work is focusing on Seamless Pipe OCTG Manufacturing and Well heads as a

Freelance Inspector.

Project Location Assignment on :

A.PT.Telaga Mas Mulia Jl.Pattimura 207 Telaga Punggur Batam –Indonesian

( September 2010 – February 2011 )

The Project name is Mobil Cepu LTD . Subject name is Pipe Rotation, Storage and Rebeveling with The job of scope as Inspection for SAW and ERW Line Pipe 20” x 0.500” WT Grade X-60 Bevel End.

The last position as a QC Inspector untill now 2011 years. Daily particularly job is do sampling measurement some part of pipe dimension such as bevel angle,pipe ID, Pipe OD, Root Face, Wall side of pipe and Length of pipe and 100 % check by visual bevel end, OD and ID Condition, etc.

B.PT.PTSC Supply Base – Vung Tau - Vietnam( Beginning of February – 16 June 2011 )

The Main Job is as QA Surveillance Inspector ( Third Party Inspection ). Client name is BHP Billiton. The BHP Billiton’s Project name is PYR DEVELPOMENT and Well Name is Offshore Resolute, HO VANG, Block 29 International and Bao Dom May.

Responsibilities included :

Assignment for Project Hon Vang and Bao Dom May in Vietnam Vung Tau, for BHP Biliton Company Vietnam.

Witness and conducted Inspection all of equipment and tools testing base of Specification Std, Quality plan.

Review Quality record, COC, Tally and documents supporting for inspection and prepared the release note documents of result inspection.

Prepare and Issued inspections to Lead Auditor and submitted to Customer.

Some of Job Description during progressing such as

1.91/2” DC and Handling Tools.

2.MUD logging Unit

3.X-Over & Slings

4.20” & 30” swage

5.13-3/8” P110 72ppf BTC R3 Box X Pin Casing

6.ROV

7.9-5/8” Casing 47# L80 Vam Top

8.Make up of 20”pup Jts to hangar

9.8-1/4” Drilling Jar

10.36” Hole Opener

11.Well Heads and Christmas Tree

12.Manifold and Valve Assembly

13.Etc or Some of job desription.

C.Schlumberger - 7 Benoi Crescent Singapore ( Starting on 26-June-2011 – 18-July-2011 )

The Main Job is as QA Surveillance Inspector ( Third Party Inspection ). Client name is BHP Billiton.

The BHP Billiton’s Project name is TRINIDAD and Well Name is Canteen ( International )

Responsibilities included :

Assigned at Schlumberger in the capacity as Client Authorized Representative ( CAR ).

Performed Quality Audits to verify conformance to scope of work, PO’s,Schlumberger-Singapore drawing and Specifications, Codes and Manufacturer’s Data Sheet. Reviewed and approved contractor submittals on quality plan and all relevant and critical procedures contractually required by the project engineering.

Reviewed, verifies, and approves NDT ( RT, UT,MT and PT ) results and requirement levels based on the project approved QC and NDT plans.

Witness and conducted Inspection all of equipment and tools testing base of Specification Std, Quality plan.

Review Quality record, COC, Tally and documents supporting for inspection and prepared the release note documents of result inspection.

Prepare and Issued inspections to Lead Auditor and submitted to Customer.

Some of Job Description during progressing such as :

1.Mandrel, : Gas Lift, 4-1/2 MMG, 410 SS

Witnessed Tack Weld Oval Grind, Fit & Tack

Witnessed OD Drift & MPI

Witnessed Hydro testing and Review NDE

Final document review, all required docs are in order and endorsed.

NDE operator qualification and NDE equipment calibration records, Welder Qualification and Welding equipment calibration records. 100% MPI Post Threading process as per NDE-22

Hydro and Drift testing to be perform in accordance with drawing requirement. Hydrostatic Test shall comply with BHPB requirements of zero pressure drop after stabilization.

All procedures listed available in Bartlesville for BHPB or BHPB TPI to review.

D.PT.Telaga Mas Mulia Jl.Pattimura 207 Telaga Punggur Batam –Indonesian

( 19 November 2011 – 26 January 2012 )

The Main Job is as QA Surveillance Inspector ( Third Party Inspection ). Client name is Origin Energy Resources Limited. Project name is Otway Exploration Wells 9.625.

Project Number is 6630 – 05 – 0009. Purchase Order Number is MITO-CPO-4224.

Some of Job Description during progressing such as :

1.CASING, 9 5/8” 47 PPF L80 JFEBEAR R3

Review and Witnessed some of Threading Process starting on verify quantity, identification and traceability marking, visual and overlay inspection, dimensional and visual on sawing coupling, Thread Gauging, make up on buck on machine and End drift, verify length of pipe, stencil marking and verify identification and traceability records, Final Inspection and review Final document report as such Mill Certificate, Telly Report, Certificate of Conformance ( COC ) and Shipping document/ Packing List.

Witnessed OD Drift & MPI

Witnessed Phosphating Coupling

Final document review, all required docs are in order and endorsed.

Responsibilities included :

Assignment for Project Otway Exploration Wells 9.625 TMM in PT.Telaga Mas Mulia, for PPIT Company Singapore.

Witness and conducted Inspection all of equipment and tools testing base of Specification Std, Quality plan.

Review Quality record, COC, Tally and documents supporting for inspection and prepared the release note documents of result inspection.

Prepare and Issued inspections to Lead Auditor and submitted to Project Coordinator and

Customer.

E.PT.Telaga Mas Mulia Jl.Pattimura 207 Telaga Punggur Batam –Indonesian

( 21 February 2012 – 31 March 2012 )

The Main Job is as QA Surveillance Inspector ( Third Party Inspection ). Client name is BHP Pakistan. Project name is ZAMZAMA, TBD.

Project Number is 7176-0937-05-3115. Purchase Order Number is 450*******

Some of Job Description during progressing such as :

2.CASING, 9 5/8” 53.50 PPF L80 JFEBEAR R3

Review and Witnessed some of Threading Process starting on verify quantity,identification and traceability marking, visual and overlay inspection, dimensional and visual on sawing coupling, Thread Gauging, make up on buck on machine and End drift, verify length of pipe, stencil marking and verify identification and traceability records, Final Inspection and review Final document report as such Mill Certificate, Telly Report, Certificate of Conformance ( COC ) and Shipping document/ Packing List.

Witnessed OD Drift & MPI on Coupling and Special Area on Casing

Witnessed Phosphating Coupling

Final document review, all required docs are in order and endorsed.

Responsibilities included :

Assignment for Project Zamzama in PT.Telaga Mas Mulia.

Witness and conducted Inspection all of equipment and tools testing base of Specification Std, Quality plan.

Review Quality record, COC, Tally and documents supporting for inspection and prepared the release note documents of result inspection.

Prepare and Issued inspections to Lead Auditor and submitted to Project Coordinator and Customer.

7. PT. UNITED SINDO PERKASA

PT. UNITED SINDO PERKASA (in short USP) is a 100% subsidiary of Jet Lee

Shipbuilding & Engineering Pte Ltd (JSE). It was set up in 2006 to own and develop a piece

of land in Kabil, Batam into a fabrication and engineering yard to support JSE’s group

of companies in their engineering and marine business. The last position as a QC Inspector

since July 7, 2010 until September 30, 2010. The project name is 8000 DWT 92M Cement Barge.

Responsibility :

Perform Structural and Piping Inspection

Witness Fit up and Visual Inspection based on specific ITP

Review Structural and Piping Inspection Test Report

Report all Structural & Piping nonconforming ( NCR )

Perform Report Inspection and Test status

Witnessed Tank Testing (Air Test, Leakage Test) and Pipe Line Check

Witnessed Pressure or Hydro test

Review NDT Test Report.

Assist Commissioning

Assist Sea Trial

Monitoring QC Activities of Subcontractor

8. CV. ARRAHMAN

The General contractor, New Construction, Ship Building, Ship Repair and Labour Supply.

Last position as a QC Supervisor since February 10, 2007 untill March 15, 2010.

Project Location on PT. Dry dock World Pertama Batam – Indonesian.

The Project name is Bumi Armada Navigation and Cost line.

Duties and Responsibilities :

Prepare Daily Welding Activities

Check all The Preparation before Welding

Ensure approved shop detail drawings have weld symbol detail

Ensure proper sizes of structure steel members as per approved shop detail drawing

Ensure proper cutting and marking of structure steel member as per approved drawing

Ensure correct assembly / fit-up according to approved shop detail drawings

Ensure no misalignment and edge preparation and root gap are acceptable

Check consumable

Review applicable WPS used for project

Ensure welding consumable are issued properly and issue record are correct

Ensure correct WPS is used, Welder is qualified for that particular joint position

Ensure welding parameter are checked

Ensure root, hot passes and capping are done according to the approved WPS

Ensure weldment is accepted by visual inspection and measure for proper size

Ensure unused welding consumable are returned to issue store and market with

paint properly

Procedure and Specification Quality Control Plan

Monitor and Record NDT Status

Review NDT Report and Prepare Weld Summary sheet for Approval by Client and

Third Party

Provide copies WPS & PQR material mill Certificate

Complete, Check and Review final documentation prior to Company, Client and

Third Party Inspector Approval

Verify Materials, and Check Welders Certificate

Stages of Production Activities

Reviews Project’s Specification

Final check on the Welding and dimensions

Completes fabrication records prior to final inspection and release for painting

9. PT.Synco Synergy Batam

The Oil & Gas steel fabrication: Structure (Tank, Pressure Vessel, Power-Module, Platform, Fire Monitor etc), Piping, Skid & Manpower Supply. Last position as a QA / QC Inspector since October 15, 2003 until July 07, 2006. Project Location on PT.Global Process System – Sekupang Logistics Batam – Indonesian. The Project name is Montara Field Development FPSO – T.P.O.T Cicade de Sao Mateos – PROSAFE

Responsibility :

Submit all drawing to fitter for fabricated.

Prepare mill certificated for all pipe and fitting for MOM inspection before fabricated.

Verify all material that received based on material specification in ISO drawing.

Verify Dimension for cutting length and prepare the report.

Inspection for spools after fit-up (Joint Preparation, Dimension, Rotation, Schedule, and Material). Before Production and QC main contractor Inspection.

Prepare Requested For Inspection (RFI) Fit – up.

Arrange all the spools that had been accepted to welding area.

Arrange welder to weld the spool based on Welder Qualification.

Welding Inspection before, during and after welding completed according to WPS requirement’s project and prepared welding report.

Monitoring the consumption of consumable (Argon, Electrode, Cutting Disc and etc.)

Arrange helper to move all the spools to after weld area.

Prepare Daily welder Report.

Follow up out standing material.

Follow up drawing revision.

Follow up out standing RT (Radiography Testing) result and Reject RT to repair the joint.

Prepare completed spools report and key-in for data entry.

10. PT.Giken Precision Indonesia, MESA Assembly Department,

Batu Ampar, as Production Supervisor ( On July 21, 1999 until August 22, 2002 ).

The Job Description is

Active to guide a team leader to achieve production target ( Output and shipment control ).

Daily Inventory control material available on production consumption.

Preventive production line down ( due to material shortage or not enough ).

Do regular time to minimize monthly material discrepancies

Making Physical Inventory Monthly reporting.

Making Schedule of Improvement Activity to supports all production needed whether related to time and motion study, machine capacity - efficiency, and manpower arrangement.

Daily and monthly Man hours performance control.

QUALIFICATION CERTIFICATES

Qualification certificates field concern internal qualifications, external certifications & client approval

Qualification

Description

Certifying Authority & country

Issue date - Expiration date

Certificate No. WIS5/YOG/12/04/062

CSWIP Welding Inspector

TWI Ltd

06 April 2015

Certificate No.026/WI-XV/IWS-B4T

Welding Inspector

Indonesian Welding Society Batam

15 January 2012

Certificate No.LPT-2/XV/IWS-NDE/2007

NDT ( LPT ) ASNT Level II

IWS-Batam

11 June 2010

Certificate No.MPT-2/XV/IWS-NDE/2007

NDT ( MPT ) ASNT Level II

IWS-Batam

11 June 2010

Certificate No.OTI.PP-X.0410.020

Piping Process Engineering ASME B31.3

Offshore Technology Institute

26 March 2015

Certificate No.6201876220010712

Basic Safety Training

STIP Jakarta

-

Certificate No.289/C/Tr-Primavera/BTM-07/2010

Primavera Project Management Ent.P6

OIL Institute

Batam

-

Certificate No.UT/XI/MSS-NDE/2013

NDT ( UT ) ASNT Level II

Multi Spec Sinergindo

19 May 2018

Certificate No.RT/VII/MSS-NDE/2013

NDT ( RT ) ASNT Level II

Multi Spec Sinergindo

10 June 2018

Certificate No.939257073107155884

BOSIET Training

M&O Indonesia –Batam ( OPITO )

30 July 2019

Seaman’s Book No: D070474

SEAMANS BOOK

Republic of Indonesia Ministry of Transportation

Directorate Generate of Sea Transportation

27 July 2018

DECLARATION:

I hereby declare that the above details are true to the best of my knowledge.

Hopefully, this application letter would be available for you and I do thank very much for your

kind of help.



Contact this candidate