Post Job Free
Sign in

Project Fire Watch

Location:
Jaipur, RJ, 302001, India
Posted:
July 01, 2016

Contact this candidate

Resume:

Curriculum vitae

Correspondence Address:

S/O- Mohammad Suleman

EkramKrina Store Chowk Road

Post- H.P.O

Dist- Gaya

Bihar (823001)-INDIA

E-Mail: ***********.****.*@*****.***

Contact Number: (INDIA) +91-810*******

+91-845*******

MOHAMMAD FAZAL

Post Applied For: - FIRE WATCH & SAFETY WATCH

Objective:

Looking for a challenging position in a dynamic organization which can utilize my potential to its full extent in the field of Fire Watcher for all round development of the company within time constraints in a professional way of in the field.

Strength:

Accept challenging roles and able to work in team

Environment and within timeline.

Full commitment to work and have a strong experience to

Carry out tasks ease and accuracy through vast knowledge of

Method,techniques and skills in functional / related field.

Result oriented with excellent interpersonal written / oral

Communication.

Create innovative ideas to improve work performance for a better

Output .

A quick learner and willing to learn new things to get the job done .

Shutdown Project:

RLP Project Qatar

Designation : Fire watcher

Period : 18th April 2009 to 04th October 2011.

Academic Profile:

S.S.C. Passed from B.S.E.B. Patna in the year of 1999 Secured 2nd

Division

Intermediate (I.Sc.) from B.I.E.C. MaaBageshwari Inter College, (GAYA)

In the year of 2012 Secured 1st Division

Technical Qualification

American Society for Non –Destructive Testing ASNT level in SNT-TC-IA 2006

Ultrasonic Testing .

Liquid Penetrate Testing.

Magnetic Particle Testing.

Radiographic Testing.

Six month course in Basic Fire Awareness Completed in (NARTANALAY SECURITY-PATNA) in the Year of 2012

Certificate of Two Year of Vocational Diploma Training in Electronics

ITKnowledge:

Certificate in Computer Application (6th) Month from Manoj Computer

Centre (M.C.C.) at Ajmer . (MS. Windows, MS.Word, MS . Excel,

MS.PowerPoint&Internet .

HSE & Industrial training completed from QATAR GAS.

H2S/BA Certificate.

PTW(Permit to Work Receiver).

Confined Space Entry & Fire Watcher.

Ten Life Saving rules (LSR).

Material Handling

Basic First AID & CPR (Conducted by Enertech Safety Training centre, DOHA –QATAR)

Work Experience:

Over 6.8 month of experience in Various areas and different roles .

GULF EXPERIENCE

1.CONSOLIDATED CONTRACTOR INTERNATIONAL. CO. (CCIC)Qatar Gas Development Project (QGX ) Qatar

Designation : NDT TECHNICIAN

Period : 11th December 2007 to 17th April 2009.

2. CONSOLIDATED CONTRACTOR INTERNATONAL.CO. (CCIC)RLP Project Qatar.

Designation : Fire Watcher

Period : 18th April 2009 to 04th October 2011.

3. CONSOLIDATED CONTRACTOR INTERNATIONAL .CO. (CCIC)Gas Sweetening Facilities Project (G.S.F.)

Designation : Fire Watcher

Period : 06th November 2012 to 12thjuly 2014

SHUTDOWN PROJECT

4 SPECTRA SOLUTION EXPERT (S.S.E) in yanboo industrial city Saudi Arabia

PROJECT ( Sabic Yansab )

Designation : Fire Watch

Period : 23th April 2015 to 23th May 2015

EXPERIENCE IN INDIA

4. ELMATICS Engineers Private Limited (Project. Office)- 30,Vani CHS, Navi Mumbai

Designation : NDT TECHNICIAN

Period : 10th May 2003 to 11th June 2005

Responsibility:

Wear Full PPE Including the fire Watch Identification (Reflective Vest).

Make Sure that a Charged Fire Hose or Hose reel is Laid near the Work Location.

Make Sure that a Suitable Fire Extinguisher is Kept Near the Work Location.

The Area Where the Hot Work Will Take Place Should be Wet or Provided With a Flame Resistant Fabrics (Fire Blanket) To the Placed Around or Underneath the Exposed Location.

Reporting the daily activities to the site supervisor and coordinating the activities with the QC.

Properly Check and maintaining all measuring and test equipment’s.

Interpretation of the defects and making the reports as per the standards codes.

Check and Make sure the Availability of Gas Monitor in Hot Work Activity Area.

Make Sure Before Start of hot Work that: What is the Concentration of H2S and L.E.L

H2S=0ppm and L.E.L=0%

Make Sure that Good Ventilation is Maintained in Order to Avoid any Contamination of Fumes, Gases, or dust to which Welders May be Exposed.

Reviewing witnessing and carryout examination and testing to all incident

stages.

Make sure that the area is free/ Cleaned From any combustible Materials that can be ignited.

Consider the Wind Direction and Always be Up wind.

Make Note of the Nearest muster Point as Well as the Nearest Telephone.

Permanent Address:

2766 –BerawaBasti (KOTRA,AJMER),RAJASTHAN -305001. INDIA

Personal Details:

Name : Mohammad Fazal

Fathers’ Name : Mohammad Suleman

Date of Birth : 09.03.1983

Sex : Male

Marital Status : Single

Nationality : Indian

Religion : Islam

Languages : English,Hindi,Urdu & Arabic

Passport Details:

Passport No: : G3569305

Date of Issue : 15.06.2007

Date of Expiry : 14.06.2017

Place of Issue : Patna

Declaration:

I shall hereby declare that all the information are given by me is correct.

241-***-**** ( MohammadFazal)



Contact this candidate