Khusni Eka Wardana
Email : ******.***.*******@*****.***
Mobile +62-815********
Bangladesh +880**********
http://www.id.linkedin.com/in/khusniekawardana
RAN & Transmission Engineer
RBS Ericsson 6000 Series 2G/3G/LTE
Ethernet Microwave Transmission System
Transport Network Performances Analyst
PDH, SDH, IP Ethernet Transport
Ericsson, Huawei, NEC
WAH (Working at Height) & First Aid Certified
Personal Information
Marital status : Married
Citizenship : Indonesian
Born : 18 August 1984
Based in : Jakarta – Indonesia
Summary Education :
Professional Specialities
Professional Experience
Training Experience :
Reference :
2001-2005 : STTTelkom - Telkom University
Bachelor in Electrical Telecommunication Engineering (3.61 GPA)
RBS Ericsson 6000 Series 2G/3G/4G LTE
Ericsson MLE, MLHigh Cap, MLTN, SOEM, SPI
NEC MW NEO IPASO PNMS
Huawei RTN MSTP OSN DWDM
IP Transport Network
Capacity, Performance & Quality IP Ethernet Services
Project Name : Axiata Robi 3G Expansion 2015
Company Name : Ericsson Bangladesh
Project Location : Bangladesh Dhaka & Comilla
Start Project : October 2015
End Project : April 2015
Possition : Transmission IP Transport & RAN Integration Engineer
Project Director : Mr. Mir Saad Ali
Project Director : Mr. Waskito Noegrohodjati
IP Transmission Transport Engineer - Fast Ethernet
Project Manager : Mr. Hasan Kazi Mahmudul
• Interface with several parties for project rollout (Project Manager, customer, ASP/vendor)
• Hand on Ericsson TN TN R 5.1.3, NPU3D, NPU1C, MMU3A
• End to End FE Network preparation for Node (Layer2, Native Ethernet, VLAN)
• Nodal Preparation Swap TN AMM6P to TN AMM20pB, Slot ReEngineering
• FE MUX Connection at POP Site
• XPIC Transmission Features
• FE Ring Protection Preparation
• Troubleshooting Support Ethernet Traffic, Quality & Performances
• Rectification Issue Report
RAN Integration Engineer – 3G NodeB Integration Engineer
Project Manager RAN : Mr. Rejwan Tahmim
• Experience in Supervision subcontractor doing installation for RBS 6601 with Psi solution and 3x1 configuration
• Experience in Integration and commissioning site for RBS 6601 DUW20 & DUW31
• Upgradation Capacity 3G Psi Sollution to 3x1 Sector
• Experience in Troubleshooting site for RBS 6601 & and VLAN integration Packet Link Data, Switch Port and MAC address connectivity from RBS until RNC
Project Name : TORPEDO - Transport Network Performances 3G XL Axiata & LTE XL Axiata Big Bang Launching
Company Name : Huawei Services
Project Location : Jakarta, Banjarmasin, Purwakarta, Cirebon, Tegal, Semarang, Solo, Yogyakarta
Start Project : November 2014
End Project : October 2015
Possition : Transport Network Performances
Project Manager : Dimas Arya Baskoro
Transport Network Performances
Transmission Network Analysis, Transport Network Performance and Optimization, Access Network Performance and Optimization, Planning Guidelines for IP network. End to End TNP Network Performance Monitoring and Optimization, Tranpsport Congestion, Quality, Alarm Handling
The NodeB Performances KPI is set based by 4 categories: Rejection, Loss, Jitter, Delay
Performed Maintain End to End Transport end to end Bandwidth Utilisation
Performed Maintain End to End Transport Quality Performances
Performed Optimization reconfigure the paramater, to adjust the bandwith capacity, QoS and other parameter
Performed Optimization End to End Transport Iub Link to achieved the KPI
Performed End to End Trobleshooting trace the problem in the IuB link form NodeB to RNC by MacAdd and Vlan ID
Performed Transport Transmission Huawei : RTN, U2000, MSTP, M2000
Performed Transport Transmission Ericsson : Minilink TN R4, Minilink TN R5, SOEM
Performed Transport Transmission NEC : IPASO, NEO, PNMS
LTE Big Bang Event Launching Jakarta (Kelapa Gading, PRJ Kemayoran, ICE BSD Gelora Bungkarno, Senayan City), Surabaya (Sutos) Bogor (Botani Square) Transport Network Performances Preparation
Project Name : Indosat Transmission 2G & 3G Roll Out - 2014
Company Name : PT. Ericsson Indonesia
Project Location : Jakarta – Bogor – Depok - Tangerang – Bekasi
Start Project : January 2014
End Project : November 2014
Possition : Transmission Engineer
Project Manager : Mr Tohap Richard Sihomibing *****.*******.*********@********.***
Line Manager : Yulpien Teng *******.****@********.***
Transmission Engineer
Plan & Execute Project Implementation, supervise Implementation Installation & commisioning ethernet transmission
Coordinate with field support team to goal the project Make sure project successful to be done technically
Support maintenance existing equiptment, improve network performances & upgrading equiptment & configuration
Review & troubleshooting detailed technical problem
Generate & reporting to Project Manager about progres, blocking & sollution
Assist Project Management organize the document acceptance to Customer
Technically Support Transmission Network : TN R.5 6pC & 2pB, Ethernet Transmission, Create & Verification VLAN, Traffic & Congestion. Upgrade Capacity & Maintain Performances.
SOEM Integration
Create NMS (DCN over VLAN, DCN over Traffic, OSPF & Static Routing
Perform Installation, Configure & Upgrade NMS Server, SoEM Baseline
Commisioning & Integration adding the new Network Element MLTN to SoM R8 and Migrating Integration to some R10.3 R10.4 & the Latest R12
Generated & Collect Performance & Alarm by SoEM
Supporting End to End Network Element Routing Integration through to Cisco & Metro Ethernet.
Maintain & Troubleshoot & Upgrading Network Element that already connected SoEM
Project Name : Indosat Transmission 2G & 3G Roll Out - 2013
Company Name : PT. Ericsson Indonesia
Project Location : Jakarta – Bogor – Depok - Tangerang – Bekasi
Start Project : January 2013
End Project : Desember 2013
Possition : Transmission Engineer
Project Manager : Mr Bagus Fakhirul *****.********@********.***
Transmission Engineer
Plan & Execute Project Implementation
Supervise Implementation Installation & commisioning ethernet transmission
Coordinate with field support team to goal the project
Make sure project successful to be done technically
Review & troubleshooting detailed technical problem
Support maintenance existing equiptment
Mantain & Improve the network performance
Support upgrading equiptment
Generate & reporting to Project Manager about progres, blocking & sollution
Assist Project Management organize the document acceptance to Customer
Technically Support Transmission Network : TN R.5, Ethernet Transmission, Create & Verification VLAN, Tranffic & Congestion. Upgrade Capacity & Maintain Performances, NMS Integration, SoEM NE Integration
Support SOEM Integration
Create NMS (DCN over VLAN, DCN over Traffic, OSPF & Static Routing
Commisioning & Integration adding the new Network Element MLTN to SoM R8 and Migrating Integration to SoEM
Generated & Collect Performance & Alarm by SoEM
Maintain & Troubleshoot & Upgrading Network Element that already connected SoEM
Project Name : Indosat 2G & 3G Roll Out - 2012
Company Name : PT. Ericsson Indonesia
Project Location : Jakarta – Bogor – Depok - Tangerang – Bekasi
Start Project : January 2012
End Project : Desember 2012
Possition : Transmission Engineer
Project Manager : Mr Bagus Fakhirul - *****.********@********.***
Installation Support and Supervising, Testing, Commissioning, Scan Frequency for test inteference, and Acceptance.TN R4.3 TN R4.4 and TN R5
Performed advance troubleshooting for Mini Link Traffic Node TN R4 TN R5
Performed software upgrade Traffic Node from Mini Link TN R3 to R4 to R5
SBL Upgrades of all the Nodes of the Network to the Latest Release MINI-LINK_TN_5.0_R24E16 using Minilick Craft V 2.20
TCU 2G Abis Over IP Implementation
Support Hot Swap 2G TDM to Abis Over IP via TCU
Preparation and Support Native Ethernet Traffic for Abis Over IP
Preparation and Support Transmission Native Ethernet Traffic for New Site and Swap NodeB 3000 to NodeB 6000, Create Ethernet Traffic Routing for Node B on Mini Link Traffic Node (Configuring SFPs, LAN ports, Switch ports, WAN ports and creating VLANS for traffic and O&M using MMU2D, NPU1C, NPU3, NPU3B and ETU3, Integration to ME (Metro Ethernet))
Ethernet Over SDH / E1 and Ethernet Over IP with PDH IME and RL-IME
Rehoming Preparation, Reconfiguring of Ethernet Traffic Routing and VLAN
Preparation E1 - TDM End to End Cross Connection for New Site 2G
ReEngineering Site – Transmission TN based
NMS Integration ( SOEM, Static Route, OSPF Route, Cisco Router, and Integration with Metro Ethernet for NMS Core Traffic, DCN Over VLAN, DCN over Traffic, Restore the T.N visibility, Add the new NEs on SOM & ensure their availability, Troubleshooting the IP conflict and loss of visibility issues arising during the DCN configuration using TELNET)
Report to Team leader and Project Manager
Advise customer about operation and technical question related of TN R-4
Project Name : Indosat 2G & 3G Roll Out - 2011
Company Name : PT. Ericsson Indonesia
Project Location : Jakarta – Bogor – Depok - Tangerang – Bekasi
Start Project : January 2011
End Project : Desember 2011
Possition : Transmission Engineer
Project Manager: Mr Bagus Fakhirul - *****.********@********.***
Preparation and Support Transmission Native Ethernet Traffic for New Site and Swap NodeB 3000 to NodeB 6000
Create Ethernet Traffic Routing for Node B on Mini Link Traffic Node (Configuring SFPs, LAN ports, Switch ports, WAN ports and creating VLANS for traffic and O&M using MMU2D, NPU1C, NPU3, NPU3B and ETU3, Integration to ME (Metro Ethernet))
Setting configuration for Dual Stack Traffic
Ethernet Over SDH / E1 and Ethernet Over IP connection with PDH IME and RL-IME
Rehoming Preparation by Reconfiguring of Ethernet Traffic Routing and VLAN
Preparation E1 - TDM End to End Cross Connection for New Site 2G
Installation Support and Supervising, Testing, Commissioning, Scan Frequency for test inteference, and Acceptance.TN R4.3 TN R4.4
Performed advance troubleshooting for Mini Link Traffic Node TN R.4.X
Performed software upgrade Traffic Node from Mini Link TN R3 to R4
SBL Upgrades of all the Nodes of the Network to the Latest Release R 4.4.FP (R22B14) using Minilick Craft V 2.15
ReEngineering Site – Transmission based TN
Advise customer about operation and technical question related of TN R-4
Project Name : Indosat 2G & 3G Roll Out - 2010
Company Name : PT. Ericsson Indonesia
Project Location : Jakarta – Bogor – Depok - Tangerang – Bekasi
Start Project : January 2010
End Project : Desember 2010
Possition : Transmission Engineer
Project Manager : Mr Bagus Fakhirul - *****.********@********.***
Preparation and Support Transmission Integration Native Ethernet Transmission 3G NodeB 3000
Preparation and Support TDM End to End Cross Connection for New Site 2G
Installation Support and Supervising, Testing, Commissioning and Setup Ethernet Native Traffic, Troubleshooting and Acceptance.TN R4.1
Supporting for Rehoming (Changing Routing and VLAN)
Integration NMS (Network Management System)
Project Name : Indosat 2G & 3G Roll Out - 2009
Company Name : PT. Ericsson Indonesia
Project Location : Jakarta – Bogor – Depok - Tangerang – Bekasi
Start Project : June 2009
End Project : Desember 2009
Possition : Transmission Engineer
Project Manager :
Mr. Syaiful Anis - *******.****@********.***
Mr. Indratno - ********.********@********.***
Installation Support and Supervising, Testing, Commissioning and Setup Ethernet Native Traffic, Troubleshooting and A cceptance. Minilink (Minilink e-Classic, Hi-Cap & Traffic Node R3-R4
Supporting for Rehoming (Changing Routing and VLAN)
Integration NMS (Network Management System)
Upgrading Software Baseline of ML Traffic Node
Project Name : Trial IUB over IP 21 Mbps – Indosat - 2009
Company Name : PT. Ericsson Indonesia
Project Location : Jakarta – Bogor – Depok - Tangerang – Bekasi
Start Project : January 2009
End Project : May 2009
Possition : Transmission Engineer
Project Manager : Mr.Syaiful Anis - *******.****@********.***
Trial Implementation Support and Supervising, Testing, Commisioning Network ML TN R4.1 for Native Ethernet Traffic
Trial Implementation Support and Supervising, Testing, Commisioning Network ML TN R4.0 Ethernet over TDM
Project Name : Indosat 3G RO 2008
Company Name : PT. Ericsson Indonesia
Project Location : Jakarta – Bogor – Depok - Tangerang – Bekasi
Start Project : January 2008
End Project : Desember 2008
Possition : Transmission Engineer
Project Manager :
Mr. Rohanizam Ramly - *********.*****@********.***
BayuAryoSusanto - ****.****.*******@********.***
Mr.Syaiful Anis - *******.****@********.***
Installation Support and Supervising, Testing, Commissioning and Setup Ethernet Native Traffic, Troubleshooting and Acceptance. Minilink (Minilink e-Classic, Hi-Cap & Traffic Node R3-R4
Supporting team for Rehoming (Change Routing)
Supporting team for Moving Trafiic (Swap Upgrade)
Integration NMS (Network Management System)
Project Name : Indosat 2G + EDGE RO 2007
Company Name : PT. Ericsson Indonesia
Project Location : Jakarta – Bogor – Depok - Tangerang – Bekasi
Start Project : Mei 2007
End Project : Desember 2007
Possition : Transmission Engineer
Project Manager :
Mr. Rohanizam Ramly - *********.*****@********.***
Mrs. Diah Imawati - ****.*******@********.***
Mr. Sabra All Fajri *****.***.*****@********.***
Preparation End to End Cross Connect RBS 2G Indosat Site (Ericsson link and Alcatel), FO on Indosat Hub Site)
Installation Support and Supervising, Testing, Commissioning and Setup Ethernet Native Traffic, Troubleshooting and Acceptance. Minilink (Minilink e-Classic, Hi-Cap & Traffic Node R3-R4
Troublesooting the Link Problem (Ericsson Link and Existing Cross Connect)
Implementation, Supervising, Testing and commissioning Minilink, Traffic Node and High Capacity Transmission. SOW : Swap Upgrade MLE 4-16E1, Upgrade 8-16E1, Swap Upgrade 16-32E1 TN, High Capacity with TN for Dropped E1
Supporting team for Moving Trafiic
Project Name : Indosat 3G Roll Out 2007 - Central Java
Company Name : PT. Ericsson Indonesia
Project Location : Central Java : Semarang, Salatiga, Pati, Kudus
Start Project : January 2007
End Project : Mei 2007
Possition : Transmission Engineer
Project Manager : Mr.Syaiful Anis << *******.****@********.*** >>
Preparation and Testing Cross Connect End to End 3G Indosat Site (Ericsson link and Alcatel), FO on Indosat Hub Site)
Supporting Team Cross Connect for monitoring TRM on RXI Aggregator for 3G Transmission
Troublesooting the Link Problem (Ericsson Link and Existing Cross Connect)
Supporting team for Moving Trafiic
Project Name : Indosat 3G Roll Out 2006
Company Name : PT. Ericsson Indonesia
Project Location : Jakarta – Bogor – Depok - Tangerang – Bekasi
Start Project : November 2006
End Project : Desember 2006
Possition : Transmission Engineer
Project Manager :
Mr. Rohanizam Ramly - *********.*****@********.***
Installation Support and Supervising, Testing, Commissioning and Setup Ethernet Native Traffic, Troubleshooting and Acceptance. Minilink (Minilink e-Classic, Hi-Cap & Traffic Node R3-R4
Preparation and Testing End to End cross connect Indosat site (minilink, pasolink, FO on Indosat Hub Site)
Supporting team for testing integration end to end Indosat equipment (RXI, FO)
Supporting Team for monitoring TRM on RXI Aggregator for 3G Transmission
Supporting team for Rehoming (Change Routing)
Supporting team for Moving Trafiic (Swap Upgrade)
Project Name : Telkomsel TINEM Roll Out 2006 Sumbagut
Company Name : PT. Ericsson Indonesia
Project Location : North of Sumatra - Medan
Start Project : March 2006
End Project : September 2006
Possition : ITC
Project Manager :
Mr. Fajar Manalu - *****.******@********.***
Mr. Adam B Ompusunggu - ****.********.**********@********.***
Mr. Wima Sakti Ginting Email ******@*****.*** Phone +628*********
Coordinate Clearence Alarm execution (Permit Access to Site, Administration, Requesting Material)
Site Monitoring (Update Database alarm site status (RBS Fault Code Class) for RFI Report, Check site status by WinFiol Software )
Ericsson RBS 2206 and 2106 Commisioning (Local OMT 29_3 Software)
Cross Connect RBS Link
Monitoring Service Provider for Clearence Alarm.
Supporting Team for Clearence Alarm
• Excellent in managerial to lead small team in certain area, controlling and reporting the project progress to Project Manager
• Excellent in Roll Out project to achieve all project target
• Excellent skill in cross connection & integration implementation
• Excellent in using various software’s as : MiniLink Service Manager (MSM), Marconi Local Craft, Minilink Craft For ML TN ( Configure MMU 2D, MMU 2H, ETU 1B, ETU 3B, NPU 1C, NPU 3B, LTU 155 E/O, Setting VLAN, Setting QOS, SNCP and RSTP), Minilink SP,
Nokia UltraSite Manager and Nokia FlexiHopper.
• Expert in Install, commissioning, and troubleshooting both in Minilink ( Transmission ) system and RBS Ericsson
• Strong knowledge in Minilink SP 210/310 and SIU
• Excellent in implementation NMS and DCN topology for Ericsson Equipment
• Telecommunication test equipment as : TEMS, BER Tester, Anritsu Site Master, Ethernet Tester
• Excellent in install, commissioning and troubleshooting RBS 6000
• Strong knowledge in Transmission
2016 RBS 6000 4G LTE Integration
2015 RBS 6000 2G/3G
2014 ML SP 210 Operation and Maintenance
2014 SPO 1410 Operation & Maintenance
2013 ML TN R5.1 Operational and Maintenance Native Ethernet Transmission
2012 ML TN R5.0 Operational and Maintenance Native Ethernet Transmission
2011 ML TN R4.3 Operational and Maintenance Native Ethernet Transmission
2010 ML TN R4.1 Packet Ethernet Traffic over SDH & PDH optimized Radio link,
2009 JDSU Test and Measurement (Acterna) Tools
2008 Demo and Training Petzl Safety Working and Tools
2007 Ericsson Indonesia, RBS 3G Commisioning RBS 3107 and RBS 3206
2006 Ericsson Indonesia, Medan Minilink-E & RBS 2106 Testing & Maintenance
2005 Ericsson Indonesia, Jakarta Minilink-E & RBS 2206 Standard Installation
2005 Minilink E Makro, E Mikro & RBS 2202 on Job Training
2005 Training for installation and commissioning Minilink Ericsson Microwave Radio by PT. LINTAS MEDIA TELEKOMUNIKASI
2005 Drive Test TEMS GSM Investigation Reporting. Sinergi Telecom, October
1.Rohanizam Ramly
PT. Ericsson Indonesia – Program Manager
*********.*****@********.*** - +62-815******** (Mobile)
2.Tutiek Sundari
PT. Ericsson Indonesia – N&TC Project Manager
******.*******@********.*** - +628******** (Mobile)
3.Sabra All Fajry
PT. Ericsson Indonesia – Customer Project Manager
*****.***.*****@********.*** - +628********* (Mobile)
4.Indratno
PT. Ericsson Indonesia – CPM Line Manager CD CSI
********.********@********.*** - +628********** (Mobile)
5.YulpienTeng
PT. Ericsson Indonesia – Integration Manager CD RAN
*******.****@********.*** - +628******** (Mobile)
6.M. Raymil Mirza
PT. Ericsson Indonesia – Integration Manager CD RAN
*.******.*****@********.*** - +628********* (Mobile)
7.Dimas Arya Baskoro
Project Manager – E2E RAN Transport Performances
*********.*******@******.*** +628**********
8.Mr Waskito Noegrohodjati
Project Director - Robi Bangladesh NRO 2015 Program
LM Ericsson Ireland Ltd.
*******.*************@********.***
+880 181******* (Bangladesh) +628********** (Indonesia)
9.Rejwan Tahmin
Project Manager – Ericsson Bangladesh LM
******.******@********.*** +880**********
10.Md Abul Hasan
Implementation Manager - Ericsson Bangladesh LM
**.****.*****@********.*** +880**********
11.Shatil Arab T
Line Manager RAN – Ericsson Bangladesh LM
*.*.******.*.****@********.*** +880**********