SUMMARY

** ***** ** ********** ** Coordination / Supervision and Inspection - QA / QC (QSMSR);

Technical Electrotechnical graduated from Technical School Santa Catarina;

Design and development of administrative controls and project field techniques;

Control monitoring costs and reports;

Development, implementation and control database system to control non-compliance and inspections treports.

Coordination and Supervision of control teams and quality assurance (QA / QC), Implementation of quality assurance plans, Inspection of quality contracts, internal audit operating standards, Supply Certification and service providers, technical documentation, inspections industrial welding, Receiving materials, maintenance planning

Knowledge in the standards: ISO 9001 / ISO 14001 / ISO 18001 / ISO 14000.BS8800.IMS CODE; DIN; ABNT; ASTM; ASME; PETROBRAS; API; ANSI; HI; NBR

Coordination and supervision of all stages of Inspection / Analysis and Preparation of PIT, Expediting, Inspection in equipment, Inspection in Manufacturing and development of Data-Book.

Knowledge in refrigeration systems, chilers absorption, positive displacement pumps, centrifugal, group diesel generators and gas, colds towers. Heat exchangers, inspection chains, belts, and load lifts equipment, physical health evaluation in furnaces, heat exchangers and boilers, digesters, reactors, vessels, tanks, reporting and monitoring of non-destructive testing in static equipment.

Relationship Facility;

Leadership Skills;

Proven Experience in Large Enterprises;

Expertise in industrial segments: Oil & Gas, Marine, Steel.

ACADEMIC EDUCATION

- Mechanical Engineering Attending 5th PERIOD

- CWI AWS D1.1 Structural Steel Code American Welding Society # – (certification phase)

- CWI ASME Section IX, B31.1 and B31.3 American Welding Society # – (certification phase)

- ASNT NDT Level II Penetrant Testing (PT) American Society for Nondestructive Testing (Customer Id # 284642)

- ASNT NDT Level II Magnetic Particle Testing (MT) American Society for Nondestructive Testing (Customer Id # 284642)

- ASNT NDT Level II Ultrasonic Testing (UT) American Society for Nondestructive Testing (Customer Id # 284642)

- ASNT NDT Level II Visual Testing (VT) American Society for Nondestructive Testing (Customer Id # 284642)

- Level I Welding Inspector Brazilian Foundation of Welding Technology # 1809

- Equipment Inspector

- Level II- ASME B31.3 Welding Inspector Brazilian Foundation of Welding Technology # 1809 – (certification phase)

- Level II- AWS D1.1 Welding Inspector Brazilian Foundation of Welding Technology # 1809 – (certification phase)

- Inspector Manufacture IF-CT Level I Brazilian Association of Non-Destructive Testing # 4760 – (certification phase)

- Inspector Manufacture IF-AT Level I Brazilian Association of Non-Destructive Testing # 4760 – (certification phase)

- Inspector Manufacture IF-MC Level I Brazilian Association of Non-Destructive Testing # 4760 – (certification phase)

- ABENDI - Level II Magnetic Particle Testing Brazilian Association of Non-Destructive Testing # 4760

- ABENDI - Level II Penetrant Testing Brazilian Association of Non-Destructive Testing # 4760

- Level II Dimensional Control Brazilian Association of Non-Destructive Testing # 4760

- CREA – RJ (Brazil) Regional Council of Engineering # 200-***-****

- CBSP – RJ (Brazil) Basic Safety Training # 193240

LANGUAGES

English Fluent or Native Portuguese Fluent or Native

PROFESSIONAL EXPERIENCE

UTC Engineering S.A – (Campos Basin - Macaé – RJ – Brazil)

Period: 03/2014 to Current

Position: Quality Control Supervisor (Off-Shore) QA / QC system (QSMSR)

Project: Contratct works and maintenance OU-RIO (P53) (P38) (P54)

Contratct works and maintenance UO-BC - FIXED (PGP1)

Oversight: PETROBRAS

TE-AG – Consortium Techint / Andrade Gutierrez (Comperj – Itaboraí – RJ – Brazil)

Period: 08/2011 to 03/2014

Position: Quality Control Coordinator / manufactures outsourced QA / QC system

(QSMSR)

Project: Construction and Assembly (Structure, Pipe) of units:

U-6821 – Handling Yard and coke storage

U-6821 – Electrical substations

Oversight: PETROBRAS

CMMS – Consortium Mendes Júnior / MPE / Setal (Replan – Paulínia – SP – Brazil)

Period: 08/2010 to 06/2011

Position: Quality Control Supervisor QA / QC system (QSMSR)

Project: Construction and Assembly (Structure, Pipe) of units:

U-1280 - Hydrodesulphurization Unit Cracked Naphtha (HDS-I)

U-1280 - Hydrodesulfurization Unit Cracked Naphtha (HDS-II)

Oversight: PETROBRAS

UTC Engineering S/A (Niterói – RJ – Brazil)

Period: 01/2009 to 08/2010

Position: Level I Welding Inspector QA / QC system (QSMSR)

Project: FPSO Petrobras Jubarte P-57 (Structural and Pipe)

Construction and Installation of modular

02 – Oil Processing

09 – Water Treatment

10 – Water Injection Pumps

15 – Laydown Área

16 – Flare Ko Drums and Gás Dehydration

Oversight: SBM Off-Shore / PETROBRAS

Project: Petrobras Roncador P-55 (Structural and Pipe)

Construction and Assembly / Pipe Production of modules M07 / M08

07 – Compressor Buster / Teg

08 – injection Amina

Oversight: PETROBRAS

UTC Engineering S/A (UTE BLS) Seropédica – RJ – Brazil

Period: 03/2008 to 01/2009

Position: Quality Control Supervisor QA / QC system (QSMSR)

Project: Biofuel Conversion Thermoeletric

Oversight: PETROBRAS

W TORRES ENGINEERING S/A (Port Rio Grande – RS – Brazil)

Period: 01/2008 to 02/2008

Position: Quality Control Coordinator QA / QC system (QSMSR)

Project: Drydock Construction Manufacturing Stakes planks AU-14 BOX / AU-14 unpretentious / AZ-48 / AZ-48E / AZ-36 / GU-13 unpretentious / GU-13 BOX / this profile

Oversight: W TORRES ENGINEERING / PETROBRAS

QUIP S/A (P 53) (Port Rio Grande – RS – Brazil)

Period: 06/2007 to 01/2008

Position: Level I Welding Inspector QA / QC system (QSMSR)

Project: Plataform P-53 Marlim East: Construction and Installation Modules / P-01 / P03A-T / P03A-F / P-03B-T / P03B-F / P06 / P08 / P12.1 / P12.2 / P12.3 / P12.4 / P12.5 (Structural and pipe)

Oversight: PETROBRAS

QUIP S/A (P 53) (Niterói – RJ – Brazil)

Period: 09/2006 to 06/2007

Position: Level I Welding Inspector / Equipment Inspector QA / QC system (QSMSR)

Project: Plataform P-53 Marlim East: Construction and Installation of Modules P02A / P02B / P07 / P07-W (Structural and Pipe)

Oversight: PETROBRAS

IESA OIL & GAS S/A (Port Novo Rio Caju – RJ – Brazil)

Period: 01/2006 to 09/2006

Position: Quality Control Supervisor QA / QC system (QSMSR)

Project: (P 51 / P 52) Construction and installation of compressor modules (structural and piping) of the P-51 platform in the Roncador field

Construction and installation of compressor modules (structural and piping) of the P-51 platform in the South Marlin field

Oversight: PETROBRAS

ENESA ENGINEERING S/A (Shipyard Mauá Jurong Niterói – RJ – Brazil)

Period: 12/2005 to 01/2006

Position: Level I Welding Inspector / Equipment Inspector

Project: Stop for Repair (XVI Platform) (Structural and Pipe)

Oversight: PETROBRAS

SHIPYARD MAUÁ JURONG (Niterói – RJ – Brazil)

Period: 03/2005 to 12/2005

Position: Level I Welding Inspector

Project: Integration of Platform P-50 in the Albacora Leste field (structural and Pipe)

Oversight: PETROBRAS

SCHAHIN OIL S/A. (Campos Basin – Espírito Santo – ES – Brazil)

Period: 08/2004 to 03/2005

Position: Level I Welding Inspector / Level II Penetrant Testing (Off-Shore)

Project: Production and replacement of the mud line (rig) ship NS 09

Oversight: PETROBRAS

STENA DRIILING LTD (Campos Basin - Macaé – RJ)

Period: 09/2003 to 08/2004

Position: Level I Welding Inspector / Level II Penetrant Testing (Off-Shore)

Project: Houses Expansion vessel Sunrise 2000 (Structural and Pipe)

Oversight: PETROBRAS

NOVOTROP COMMERCIAL AND TECHNICAL LTD (Campos Basin - Macaé – RJ)

Period: 03/2002 to 09/2003

Position: Level I Welding Inspector / Liquid Penetrant Inspector Level II (Off-Shore)

Project: Welding Maintenance and repairs (structural and pipe) Platform PPM1 - PAMPO

Oversight: PETROBRAS

COMPETENCE AND SPECIALTIES

Leadership Course UTC Engineering S/A

CWI AWS D1.1 Structural Steel Code AWS American Welding Society

CWI ASME Section IX, B31.1 and B31.3 AWS American Welding Society

ASNT NDT Level II Penetrant Testing (PT) ASNT American Society for Nondestructive Testing

ASNT NDT Level II Magnetic Particle Testing (MT) ASNT American Society for Nondestructive Testing

ASNT NDT Level II Ultrasonic Testing (UT) ASNT American Society for Nondestructive Testing

NR-33 Entry Supervisor and Rescuer in Confined Space Course WEST GROUP

NR-34 Work in progress Height WEST GROUP

Inspection Dimensional Control Level II ZEPTO TRAINING

Spring System P6 SENAI - National Industrial Training Service

AutoCAD System SENAI - National Industrial Training Service

Level I Welding Inspection FBTS - Foundation Brazilian Welding Technology

Inspection Equipment FBTS - Foundation Brazilian Welding Technology

Complementation for Level II Welding Inspection FBTS - Foundation Brazilian Welding Technology

Inspection by Penetrating Liquid Level II SENAI - National Industrial Training Service

Inspection by Magnetic Particle Level II SENAI - National Industrial Training Service

Training Quality Coordinator (QSMSR) BVQI – Bureau Veritas Certificacion

Quality 5S UFF – Federal Fluminense University

CCQ - Quality Control Circle (QSMSR) CISPER

Electrical Technology ETSC – Technical School Santa Catarina

Advanced English Yazigi

Basic Techniques END SENAI - National Industrial Training Service



Contact this candidate