DAMON A. EVANS

*** ***** *****

Manvel, Texas ***78

Phone: 832-***-**** E-mail: acvdco@r.postjobfree.com

SUMMARY: Sr. Pipeline Engineer with over 25 years of experience in the oil & gas industry, including ten years of project management, over five years of pipeline integrity management and general consultation of pipeline systems, twelve years of onshore pipeline design, facility design & construction, four years of offshore pipeline design and two years of general municipal construction and steel pipe testing.

EMPLOYMENT:

09/10 – Present Wood Group Mustang, Inc.

17325 Katy Freeway

Houston, Texas 77084

Project Pipeline Engineer: Pipeline project engineer assigned to four (4) Williams Purity Pipeline Projects of approximately 150 miles of varies sizes of small diameter new build pipelines within the gulf coast region of Texas designed to carry several types of petrochemicals to and from area plant facilities. The majority of these pipelines shall be designed & installed in very close proximity of foreign pipelines within congested pipeline right-of-ways, including Center Point, ExxonMobil Pipeline Corridor and areas throughout the Houston Ship Channel. Along with my project pipeline engineering design responsibility of the pipeline systems, I was also responsible for a supervisory role of managing a young engineering team to complete varies pipeline engineering assignments, such as pipeline routing, pipe calculations, horizontal directional drill design, crossing designs, station piping layout, stress analysis, hydraulic analysis, alignment sheet development, cathodic protection design, AC mitigation, class location studies, project schedule updates and many other pipeline engineering related activities.

Project Manager: Currently a project manager assigned to manage all aspects of the project including detail design, procurement and installation of over 30 capital maintenance projects for Panhandle Energy, ranging from $250,000 to $10,000,000 in cost. Projects consist of meter & regulation facilities, pipelines, launcher & receiver installations, pipeline relocations, equipment change outs and various other gas pipeline installation efforts. Previously, managed multiple design & installation interconnect and meter station projects for Boardwalk Pipeline Partners, LP. Worked inside Boardwalk’s Houston offices as a member of their Pipeline Interconnect group as a consultant charged with managing all aspects of design and installation including but not limited to procurement, permits, fabrication and engineered two meter stations, interconnects and laterals. Managed, designed and installed meter station modifications for Boardwalk’s Enogex Bennington meter station in Oklahoma. This project came in under budget and on time. Also, managed the design and installation of a grass root meter station, interconnect, pipeline lateral and 2,000 feet of permanent access roadway for Entergy’s Power Plant in Attala County, Mississippi. Both projects held the project manager accountable for man-hours, cost and existing budgets.

04/09 – 08/10 Self Employed

Consulting Pipeline Engineer: Worked varies small maintenance and due diligence pipeline and small facility projects in Houston and the surrounding areas. Work included two (2) due diligence projects defining assets and productivity for Spectra Energy; 2,000 feet twelve inch (12”) lateral and gas treatment facility design and installation project for Tandem Energy; managed a pipeline maintenance project for Monument Pipeline, LP, which included line cleaning, hydrostatic testing and small station piping design.

10/07 – 04/09 Maverick Engineering, Inc.

11490 Westheimer Rd, Suite 1000

Houston, Texas 77077

Pipeline Project Manager / Sr. Pipeline Engineer: Previously managed several engineering design and installation projects on gas gathering pipeline systems, which include flow lines, separation facilities, treating facilities, meters and interconnects. Projects include El Paso Energy Springfield Interconnect Project, El Paso Energy Calpine Magic Valley Interconnect & Meter Project, Tandem Energy Lieke Field Pipeline and Separation Facility Engineering Design Project and Tandem Tomball Compressor Station Facility Upgrade Project. Previous work included project management and construction management of Oxy-Centurion’s Pipeline Exposed Pipe Project, which included evaluation and remediation of over 390 exposed 16-inch pipeline locations. Remediation methods included but not limited to, adding structural support, mitigation of soil erosion, line lowering and rerouting. Additional projects consisted of DCP Haul Truck Crossing Study and T-C Oil Pipeline Corrosion Analysis and Recommendation Study, engineering and construction of a two mile dual 24-inch pipeline within a heavy congested corridor along the Houston Ship channel and various pipeline option studies.

08/05 – 10/07 M&H Energy Services

2900 Wilcrest Dr., Suite 300

Houston, Texas 77042

Onshore Project Manager: Management of several gas & liquid pipeline and gas production projects, which includes managing engineering, drafting and procurement personnel and tracking project progress, man hours and cost. Developed of scope of work and managed oversight of all engineering design. Management and inspection of construction work, approval and certification of contractor’s work for payment and managing commissioning and start up of new facilities. Projects included Dominion Field Services Membrane Filter System installation, Enterprise Products Pipeline Hobbs Caverns Meter Modification Project, Suez Wise County Pipeline Project (Preliminary Engineering), Monument Pipeline Line Lowering, Mainline Valve Replacements, Senior Road Meter Station Modification, and CrossTex Aurora Centana Meter Station Engineering Design & Installation. General project proposals and miscellaneous engineering tasks related to other projects within the company. Overall development of design, engineering, cost estimates and execution schedules for several small capital projects.

06/03 – 08/05 Maverick Engineering, Inc.

One O’Conner Plaza, Eighth Floor

Victoria, Texas 77901

Sr. Pipeline Integrity Consulting Engineer: Pipeline Integrity Engineer for Valero Logistics L.P. tasked to develop, implement and maintain an integrity management program for over 5,000 miles of liquid pipelines. Responsibilities included, but not limited to: Assisting in the development of the company's Integrity Management Plan; developing and implementing new integrity assessment procedures to comply with current DOT & TRRC regulations; developing companies annual review reporting and procedures, including OPS Annual Report 7000-1.1; full participation in OPS audits as well as evaluating audit findings and implementing corrective actions; assisted in developing IMP training modules for operations personnel; developing a risk performance program to evaluate the company’s IMP efforts; designed a program to interface with current ILI data and the companies reporting & assessment capabilities; created inspection & repair documentation format while currently maintaining all documentation of integrity inspection data, corresponding assessments and repair data; interpret & assess tool log data to determine integrity issues and repair criteria for reported defects; interface with inspection vendors to determine companies evaluation needs, tool selection and inspection scheduling; developed repair manual and field procedures for evaluation and repair of ILI reported defects; schedule and monitor integrity repairs; identify and propose capital projects based on inspection results; analyze and evaluate corrosion defects, cathodic protection systems and calculate safe operating pressure of pipe by ASME B31G, B31G Modified and/or effective area calculations; and in the process of implementing a separate gas integrity management program for approximately 25 miles of gas pipelines to comply with DOT and the Oklahoma Gas Commission.

12/01 – 05/03 Alliance Engineering

16340 Park Ten Place Drive

Houston, Texas 77084

Senior Project Technical Professional (Pipeline Unit): Lead Pipeline Project Engineer for Reliant Energy – Napoleonville Salt Dome Project, my responsibilities consisted of detail design of several pipeline installations within the swamps of southern Louisiana, route selection, pipeline design, and meter and interconnects designs. Developed typical environmental and installation design drawings for the pipeline unit.

Additional pipeline project duties included pump station design, meter design and writing bid documents for construction contracts and material acquisitions. Pipeline consulting assignments within the pipeline unit included pipeline system evaluations, asset due diligence and integrity management reviews for Plains Resources / Plains All-American Pipeline on the following acquisition ventures:

Equilon Basin Pipeline System – West Texas

Burlington Resources Val Verde Gathering System – San Juan Basin, NM

EnCana Pipeline Systems – Alberta, Canada

Tasks included evaluation of pipeline system bottlenecks, hydraulic flow modeling (steady state & transient analysis w/ TLNet software) of the current and proposed pipeline system upgrades, and reviewing code compliance, SCADA systems and major equipment performance.

03/99 – 12/01 BMH Eagleton, Inc

3900 Essex Ln.

Houston, Texas 77027

03/99 – 12/01 Sr. Pipeline Engineer: Participated in a variety of pipeline and related facilities projects. Duties included project management, route selection, pipeline design with directional drill, boring and wet lay crossing experience, right-of-way liaison, permit acquisition (federal, state & local), material acquisition, preparing construction contract documents, developing bid packages, estimating, design and construction management, drawing preparation and field technical support. The above assignments were displayed on the following projects.

BP America – Destin Pipeline Onshore Liquid Handling Facility Expansion, Pascagoula, Mississippi – Expansion design of facility piping and slug catcher.

Wolverine Pipeline Company - Spartan Phase II Project, Stockbridge and St. Johns Michigan – Design of modifications to storage terminal and two pump stations.

Chevron Phillips Chemical Feedstock Integration Project, Mont Belvieu, Texas – Design of 40 miles of pipeline for a refinery gathering system.

Lavacca 2000 North Project, Mont Belvieu to Texas City Texas – Design of 45 miles of a 12” ethane pipeline and facilities.

Teppco Pipeline System, Port Arthur to Mont Belvieu, Texas – Design of a 210 mile, 12” pipeline system, 70 miles of three (3) lines in the same ditch.

Enron Vector Slug Catcher Modification, Corpus Christi, Texas – Design and evaluation of modifications for a newly acquired slug catcher.

04/01 – 09/01 Supervising Engineer: On-site engineer for Wolverine Pipeline Company, Stockbridge and La Paugh Pump Stations and Terminal Project. Responsible for the engineering design of two pump stations, tank farm terminal piping and related facilities. The project included meters/provers, booster pumps, terminal piping, pipe manifolds, launchers/receivers and 5,250 HP of centrifugal pumps with VFD drivers and synchronized switching.

06/97 – 03/99 Universal ENSCO, Inc

1811 Bering Drive

Houston, Texas 77057

06/98 – 02/99 Pipeline Field Engineer: As field engineer representing TransColorado Gas Transmission Company on their TransColorado Natural Gas Pipeline Project; my responsibilities encompassed overseeing all technical engineering issues pertaining to approximately 272 miles of 22-inch & 24-inch gas pipeline installation and construction of all pipeline appurtenances. Additional tasks included pipeline completion verifications, final field verification of design on all above ground appurtenances, field pipeline design changes, field inspections, site design changes, and communicating directly with the construction contractors on all technical issues pertaining to design changes and construction specifications.

06/97 – 06/98 Sr. Pipeline Engineer: Duties included detail pipeline design of 272 miles of 22-inch & 24-inch natural gas pipeline for the TransColorado Pipeline Project located along the western slope of Colorado. My design responsibilities were comprised of the following assignments; pipeline routing, line pipe wall thickness selection, railway, highway & road crossing designs, line pipe distribution, site specific & steep slope installation design, horizontal directional drill design, road & highway construction plans, major river crossing designs, temporary bridge, culvert & flume designs, fabricated assembly design, and extra workspace & ancillary site design and selection. All design issues were environmentally sensitive and were in compliance with all federal, state and local permitting agencies. Additional responsibilities included creating construction specifications, alignment sheet design & preparation, transportation plans, technical studies, and various engineering tasks and calculations.

06/93 – 03/97 JP Kenny International

5100 Westheimer, Suite 400

Houston, Texas 77056

Staff Pipeline Engineer: Responsibilities included offshore and shore approach pipeline design, engineering and construction in the oil & gas industry. The work involved detail and preliminary pipeline process analysis, steel pipeline riser configuration, offshore cathodic protection design, wall thickness and pipeline sizing selection, stability analysis, pipeline route selection, laystress analysis, diverless connection design, thermal expansion analysis, shore approach & crossing design, and varies soil, load & stress calculations.

EDUCATION: BS Civil Engineering – University of Houston

TRAINING: Pipeline Reliability Assessment Course, 2004

Piping Design & Pressure Stress Analysis Certification, Mercer University, 1996

United Parcel Service Certification of Completion, 40 hours Management Training

United Parcel Service Certification of Completion, 40 hours People Skills Training

References supplied upon request