Matthew A Moore
***** ******* ** ********* ** ***45
***************@*****.***
Mobile : 936-***-****
OBJECTIVE
I am a consistent, hard working, highly motivated person. I feel that i am a friendly, outgoing and dependable person. I feel it is crucial to demonstrate the importance of my job duties and expectations. I am looking to improve my position in the work force, expand my knowledge and skills. I am also looking to establish long term employment in a friendly environment.
ACADEMIC DETAILS
Degree/Course Institution Year of Passing Percentage / Grade High school Waller High 2006 4
WORK EXPERIENCE
Organization Designation Duration
Odebrecht construction Lead man / concrete finishing Aug 2015 - till date R&B Group Forman/operator Jun 2014 - Aug 2015
East texas pre cast Operator Mar 2013 - Jun 2014
HTS Ameritec Level 3 Tech Sep 2009 - Feb 2013
Baker pile driving Operator/Laborer Jul 2006 - Sep 2009 Roles
• rub and patch defects in walls copping ripwrap etc. Ensure crew completes tasks according to print or punch list help for man with varous tasks, and operate heavy equipment including articulated front loader, dozer, sky lift, man lift etc. as needed to complete job in safe and timely manner.
• ensure crew completes project in timely manner, according to print. operate heavy equipment including backhoe, excavator, ditch witch, smooth drum roller, grove hydraulic crane, American friction crane with clam bucket attachments etc. as needed to complete job in safe and timely manner.
• responsible for keeping Hopper's full of specific rock, gravel, and sand. maintain a smooth an safe roadway throughout plant using various pieces of equipment including dozer, excavator, pull behind box blade. also responsible for maintaining wash out pits and clean out as needed. other responsibilitys were the demolition and loading of debris from rejected casts using jackhammer and crusher attachments on excavator, and load trucks with front loader
• performed various tasks pertaining to heat treating, stress relief, and line thaws. responsibilitys included installation of thermo copling, ceramic heat pads and insulation. also ran cables for pads and insured treatment was done correctly and within specs
• performed various jobs, including land clearing, carpentry work, metal work including welding, operation of excavator with pneumatic pile driver, and vibrating attachments. REFERENCE
Manual Espinosa III
Forman
Zachry odebrecht parkway builder's
Corey Houghton
Superintendent
R&B Group
Brian lyons
Supervisor
East Texas Pre cast
dcx
DECLARATION
I hereby declare that the above mentioned details are true to the best of my knowledge. gbgb
Date : 1-2-2016
(Matthew A Moore)