Post Job Free
Sign in

Piping Engineer

Location:
Singapore
Posted:
June 22, 2016

Contact this candidate

Resume:

KUMARAN

PERSONAL DETAILS

Name : Sangaiah ilankumaran

Date of Birth : 17/04/1983

Martial Status : Married

Residential Status : SPR (Singapore PR)

Driving Licence : Class 3 and 2B

Languages known : English & Tamil

CONTACT INFORMATION

Residential address (Singapore) : BLK 359 #01-385 Bukit batok st-31

Hand phone Singapore : +65 88684072

Email address : **************@*****.***.**

ACADEMIC CREDENTIALS

Degree : Marine offshore technology

University : Ngee Ann polytechnic (Singapore).

Computer Skills : MS office, Auto cad & drafting, Computer sys architecture,, Project planning and scheduling.

CAREER SNAPSHOT

13 years of rich experience in Shipyard, oil & gas.

PROFESSIONAL EXPERIENCE (In Chronological Order)

Dyna-mac Engineering ServicesPte Ltd(From Jan 2012, ~Till date)

45, Gull road Singapore 629350

Project Name : ARMADA OLOMENDO FPSO, ONGC-1 FPSO, FPSO ARMADA CLARE, FPSO ARMADA PERDANA

Designation : Piping Engineer (Production).

Drydocks world Singapore pte. Ltd.(From May 2010 Nov 2011)

No:33Tuas crescent, Singapore-638722.

Project Name : H 190, H-367, H-368, H-391 (new building)

Designation : Snr. Supervisor.

Keppel Offshore & Marine (KOM)

Keppel Shipyard Limited (Tuas), (From Jan 2009 to Apr 2010)

51, Pioneer Sector 1, Singapore-628437.

Project Name : FPSO PETROBRAS-57, FPSO SAXI,

Designation : Asst. Engineer (piping)

Keppel Offshore & Marine (KOM)

Keppel Shipyard Limited (Tuas), (From Jul 2007 to Dec 2008)

51, Pioneer Sector 1, Singapore-628437.

Project Name : Songavenus (semisubmersible), Ensco 51 (jack up),

Designation : Supervisor (piping)

Keppel Offshore & Marine (KOM)

Keppel Shipyard Limited (Tuas), (From 2003 to 2007)

51, Pioneer Sector 1, Singapore-628437.

Project Name : FPSO Marlimsul, TeknikBerkat (deep displacement), Intermac 650 (semisubmersible), DB 101 (offshore),

Designation : Pipe Fitter.

Plant engineering construction pte ltd. (From Sep 2001 to Sep 2002)

21, Shipyard road, Singapore-628144.

Project Name : OSP-1 (pfizer plant)

Designation : pipe fitter

LIST OF MAJOR FPSO CONVERSIONS & RIGS OVERALL INCHARGED

Name of the project : PETROBRAS-57 (Jul 2009 ~ April 2010)

Project type & Client : FPSO / SBM

Nature of job : Overhead piping with various lines in engine room,

Name of the project : FPSO Armada Perkasa (Sept 2006 ~ Sep 2007)

Project type & Client : FPSO/ Bumi Armada

Nature of job : Helideck and flare tower piping fabrication & installation, Heating coil system.

Name of the project : Songa Venus (Oct 2007 ~ Feb 2008)

Project type & Client : Semisubmersible/K.Tuas

Nature of job : High pressure cement & Mud line, Co2 & Deck foam system, Diverter line.

Name of the project : Intermac 650 (Feb 2006 ~ Jun 2006)

Project type & Client : Deepdisplacement/K.Tuas

Nature of job : Quick ballast system, Hydraulic system,

Name of the project : Ensco 51 (Jan 2009 ~ Jun 2009)

Project type& Client : Jackup / K.Tuas

Nature of job : Spud can system, Entire piping systems iwo Living quarters including testing, .

Work Scope;

To identify the Piping Fabrication and installation sequence as per Client WBS Requirement in site as per Clint requirements and completion within planned schedule.

To Coordinate with QC and Project team for all NDT Requirement and hydro testing.

To identify using P&ID, Isometric for piping size and fittings and grade in accordance with drawing and client specifications.

To conduct field check to monitor work in accordance with proper work manner.

To assist with construction team for all the site concern problem and solve it.

To organize the Construction work package scope and arrange all the necessary spools fabrication status and coordinate with Planner for the priority scope of work.

To maintain the spreadsheet for the piping spool, support and all other Special items such as Valve, in line items etc. and update in the system for the fabrication and installation.

To monitor the piping construction sequence and loading plan for the site as per client requirements.

To Read and interpret the detail drawing from the client and prepare the MTO for the Different Material Requirement and inform to the procurement department for the material sourcing as per the client standard specifications.

To track the piping dia-inch completion daily basis and update the progress update and weekly report to the client.

To identify the construction Work pack scope based on the contractors, client Scope and identify the variation order, site instruction and report to the Piping HOD for the Variation order request to client.

To highlight the piping construction issue in the Site/Vessel such as clashing with Structure, E&I or Equipment’s and identify the solutions and implement the latest revision drawing to the site installation team and record all the manpower loading and facilities and consumables for variation.

PROFESSIONAL CREDENTIALS

Course Type : Marine Offshore Technology.

Conducted by : Ngee Ann Polytechnic, Singapore .

Duration: 2005~2008.

Course Type : National Trade Certificate (ITI).

Conducted by : Govt of india .

Duration: 1999~2000.

Course Type : Project management.

Conducted by : Ngee Ann Polytechnic, Singapore .

Duration: Feb 2008~ Aug2008.

Course Type : Project planning & scheduling.

Conducted by : Ngee Ann Polytechnic, Singapore .

Duration: Aug 2007~ Feb 2008.

Course Type : Marine & process piping.

Conducted by : Ngee Ann Polytechnic, Singapore .

Duration: Sep2008~Oct2008.

Course Type : Problem solving and decision making.

Conducted by : Kaplan, Singapore .

Duration: Jun 2009~ Jun2009.

Course Type : Purchasing management.

Conducted by : Ngee Ann Polytechnic, Singapore .

Duration: Feb 2008~ Aug2008.

Course Type : Safety leadership course.

Conducted by : Keppel Tuas, Singapore

Duration: Dec 2007.

Course Type : Shipyard safety supervisor course (SSSC).

Conducted by : NTUC Learning Hub, Singapore .

Duration: Mar 2007~ Apr2007.

Course Type : Effective supervisory, & Basic Essential Supervisory skills .

Conducted by : PSB Academy, Singapore .

Duration: Apr 2008~ Apr2008.

Course Type : Skills Evaluation Test (Piping).

Conducted by : ITE, Singapore .

Duration: Jul 2007.

Course Type : Pipe Fitting Level 1, & 2.

Conducted by : Keppel Tuas, Singapore .

Duration: 2004~2005.

ROLES & RESPONSIBILITIES

PipingEngineer (Piping/Site)

To Assist in resolving engineering & Construction issues at site, coordinating with the respective engineering support units and referring to the Project & Construction Manager for guidance

To highlight piping engineering issues to client & follow-up with the client engineering team. Responsible to study the project requirement, specification and follow by document submission

To Undertake & assist engineering, planning, execution works in site as and when required by the Project Manager and his designates

Responsible for supervision of fabrication and installation of piping, Structure, items as per drawings and clients specifications

To Co-ordinates with QC, Painting Supervisors and Client representative for Hydro-test and completion as per client specifications

To Ensure field works and carry out the works in proper manner

To carry out daily reporting and monitoring at site progress in order to achieve planned schedule.

To prepare engineering documents, such as work instructions and progress reports/data hand-over status to client & Vendors & Mechanical Completion of completed CWP with all documents.

To Perform the Coordination meeting with Vendors, Client & Sub Contractors.

To lead and negotiate with project team, subcontract and client representative for technical issue, variation charges with proper maintaining Documents of the Projects.

To Interpret isometric drawing from the GA drawing, Hook-up Drawing, Tie-in Line, Pipe rack Structural Piping, Pipe Routing, and MSDS and to plan BOM as per the drawings inorder to purchase and Fabrication.

To assist the Site In-charge in mapping out detailed work plans, activities, Lifting plan for Mechanical Equipments and piping components and tasks for the engineering projects and to prepare Work procedures, Risk assessment for installation works.

To Prioritized scope activities to most efficiently meet project schedule requirements and ensure safe work performance at site.

To plan the erection work sequence by area and the most prioritized work completion schedule and meet the target within deadline. Arrange the Crewmembers to perform the task by disseminating the drawing, location and work plan with appropriate machineries, equipment and work force.

To Ensure site housekeeping are well maintained and strictly follow proper work sequence and work flow.

To Co-ordinate with site Construction team for forth-coming installation spools, supports, structure requirement for erection, testing and commissioning works.

To Assist in the monitoring of construction materials, equipment and labor status, and report

To Assist the Construction Superintendent in assigning task to work teams and recommend changes to the work teams if they are not suitable for the project

To explain the site situation, technical requirements, project specifications, special engineering instructions, coordination procedures, execution approach and activity priorities to the various work teams, and seeks contributions for further Progress Measurement & control.

To Attend site meetings and inspections, report regularly on progress and monitor schedule & activities and maintain proper documentation in accordance to client’s requirements and specifications

To Estimate the project cost control & monthly progress claiming with all necessary Site instruction & Variation Order for the FPSO/Process Plants which involves the Scope of Work includes Structure, Piping, E&I, Mechanical & Equipment & Scaffolding & Painting Works & Measurement for Qty.

To Monitor the Works Progress in site measurement & daily work sequence & follow up as per the project milestones

To validating Contractors’ progress submissions and liaising with and providing support to the Project Control Manager and Contracts Engineers and evaluation of Change Order Requests.

To Reconcile measurements with clients Monitor changes on site and claim for contract variations

Valuate and Negotiate with the client on the variations submitted compile Final Account/Price-book of the contract

To Understand the Contractual requirements of the Contract documents Quantity measurement and valuation of the works in accordance to the contract

To Interpret & Review of all Isometrics Piping Drawings and P&ID to determine material, schedule & dimensions for Site Fabrication & Erection Sequence

To Perform Full Detail of MTO, Procure Piping materials & expedite materials to be deliver on time & Cost Estimates for Piping, Mechanical, Structural, Painting Works

To read and interpret drawings and to handle project procurement cost control, project planning & Quantity Surveying of each Discipline such as Piping, Mechanical, Structural & Insulation, Painting and preparation of documentation for submission for Monthly Progress Claims & Variation Works

To control the budget & costing for the Project Work packages scope in all the Original Scope & Variation includes Tools, Consumables, Machinery, Lifting Equipment, & Other Necessary incidentals usage for the FPSO/CWP Packages

To Calculate usage of resources, such as labor hours, materials and tools, and other costs and cost control to make comparison with budgets and report prognosis to the Site Manager.

DECLARATION

I solemnly affirm that the above information is correct

S I G N A T U RE

S.ILANKUMARAN.



Contact this candidate