Post Job Free

Resume

Sign in

Self: inventor/designer/researcher/electromechanical : Mechanical Sy

Location:
Cairo, Cairo Governorate, Egypt
Salary:
000000000000
Posted:
June 19, 2016

Contact this candidate

Resume:

File Name: (WIND): CV at the end

I may turn you the world leader in:

(Wind/wave/tide), (Rotorcraft) and

(Propulsion: Air/Land/Rail/Water/Subwater)-Technologies.

Dipl. Engineer Nabil Mostafa

Birth date 27th Nov. 1939

E-mail acvbh2@r.postjobfree.com

acvbh2@r.postjobfree.com

acvbh2@r.postjobfree.com

Cairo 11744, Egypt

(Scientific inventions)_: Adopt, patent, finance, produce & market: Engineering/Aerospace/ Helicopters/Airframes/ [for Marine, and land: 100++MW highest efficiency environmentally friendly low speed giant diesel units]/ Marine/ Hull-Parts/ Aircushions/ Naval/ Submarines/ Defense-Military/ high power-density propellers/ Auxiliaries/ Fisheries/ OffshoreOil/ Automotive/ Bikes/ Transportation/ Vehicles: (More-Electric and All-Electric: air, land, sea, subsea)/ Civil/ Snow-Roofs/ Shore breakwater/ Ultimate piles and Diaphragms/ Fast deep pier caissons/ Structures/ Flood Rescue Countermeasures-Integrator/ Renewables/ Electrodynamics/ Hydrodynamics/ critical steam cycles/ New Sports of Olympic Tendency/Clubs/ Entertainment/ House Hold stuffs/ Tourism/ Musical- instruments/ Toys/Arts/ Collectibles/ Some rural and urban development concepts/ Science-Museums/

Handicapped: some needy gadgets/Cartography/ sustainability/ etc...

I am swimming day and night in a wide ocean of innovations, For the last four decades:

Renewables, helicopters, prime-movers, shipyards, geomechanics, civil, military, naval, sports, artworks, etc...

I may license all free only to any government

which may sponsor (At least POLITICALLY)

Very new concepts and design principles to ideally harvest

(Wind power): (HAWT) and (VAWT), featuring all:

-Extraordinary generator (design/construction)-principles.

-Slip Rings (sparkless), durable/reliable

-Inherently highly-(mitigated/damped) noise levels.

-Highly-resilient (gear-meshing)-principles:

(Design/construction/materials).

-plenty modification-Concepts for the existing:

Giant multi-MW turbines.

-New (blades): Both for Windturbines and

(Helicopters main rotor blades):

(Theory, design, construction, and materials).

-Regulation Methods: (VP, Stall, brake, yaw and Sail).

-New (Nacelle-Theory).

-New (Hub-Theory).

-New Transmission Concepts

-Distributed-(peak-peckers):

(integrated-complexes) theory/design.

- (Lightning arresters) for the park: (new theory).

-plenty hurricane Protection concepts.

-Windturbine-Designs may extract energy,

Safely, automatically, At all wind states as:

Very low wind: (Breeze: below existing design cut-in) And even during critical winds which are:

(Hitting/Gusting/Cycloning)

-New Anemometry Principles and Schemes.

-plenty designs of giant: Meteorological-(down-swinging poles).

-Hybrid-(OWC): Oscillating Water-Column Principles

-OWC: modern designs of: (air-Tunnels) and (airturbines).

-Wind-powered-vehicles:

[Paved-Land, ice/sand, marine and amphibious]:

For (Sports, competition, entertainment and amusement).

- (Autonomous Ocean Wave Energy Converters).

- (Wind/Wave/Tide-currents) Energy Converters

- (Steel Tower Foundations): (Monopiles and Jackets):

(Modern Design Schemes, featuring):

(Lower cost), (Longer life),

(Remediable: if loosing Soil Consolidation), or

(Increased tower lateral oscillations), or

(Tower Sinking by-time)

-Several [Modern Renewable Energy Schemes]:

Could be fulfilled at Shipbuilders and sheet metal fabricators As an added new business,

And to multiply the number of players on the market, Ex-shed production lines.

-Abandoned offshore platforms:

(TLP, Jacket, Gravity-concrete, and Spars), turned into:

(Wave/wind)-unprecedented Energy Converter concepts, Plus (Tourism/scientific research) -Visits

-Ditto; for my highly developed and engineered Integrated Shoreline-Breakwater Designs: (the same as above item)

-Miniaturized (toy-sized) turbines, inviting brand toy Producers to supply:

(Global science museums)-market supply industry type, And collectibles. Also standing as economical demonstrators For the mother very new prototypes-concepts of my

Invention items, and for International events use.

- Table-sized demonstrators to switch earlier to:

Their multi-megawatt sizes

- (CCS): Carbon Capture and Storage under seafloor: Extraordinary modern gas pumping system:

High efficiency, durable,

Fast-: (wear-compensators/adjusters)

-Seafloor Multi-phase Pumping System, durable,

Automatic Fast: (wear-compensators/adjusters),

Handling mixed percentages at once of:

Oil, gas, water, high percentage of sand safely, than Other existing pump types

-Sucker Rod Deepwell Pumping Systems:

Plenty Variation of Reliable Concepts for the Surface Power Pack, Effectively/Economically used as for:

(The Very Crowded Group Wells) in the Oil Farm

-Plenty Modern (Cold/Hot)-(Fluid-Handling):

Turbomachinery: For all industries

- (NABYRINTH): Highly advanced (LABYRINTH) design

Schemes, Unprecedented, (TAILORED) for all Industrial Turbomachinery applications, (Self-Adjustable),

(Heavy-Duty), Durable, (all-Ratings), as follows:

(Speed): (Critical, of air bearings), (High), (Medium),

(Low) and (Ultra-Low)

(Temperature): (Critical-Combustion), (Critical-Steam), And Down to (Cryogenics)

(Pressure): (Critical), (High), (Medium), (Low), (very low)

(Vacuum): (Deep-Critical), (High), (Medium),

(Semi-Rarefaction)

-For the global carbon reduction target:

Improving fuel efficiency by:

Very new (Turbine-blading)-(Theory/design) featuring: Very light weight and much reduced-:

(Internal Drag resistance) and (Internal leaks)

For all turbine Types-:

Industrial-: (Steam/Combustion/Turboshaft), as well as:

(Turbofan/turboprop/turbojet), for:

(Land/sea/air)-Applications

- Powerplant Steam-(Cycles):

Modern, Unprecedented Concepts, Featuring all:

(Supercritical Temperatures), (Supercritical Pressures),

(Higher Economical Indices), (Longer Life), (Reliable),

(Deeply reduced Heat-Lost, or -Rejected, toward Global Warming Mitigation), (Wider, Safer Regulation Levels),

(Plans to modify existing plants at least cost), etc... including existing nuclear steam cycles

- (Nabil)-(Greener Energy –Related Projects):

(Industries), (Parks), (Open-Air Museums),

(Science Museums), (General Public Culture),

(Virgin Islands Bases), (Vehicles), (New Beaches Promotion),

(Fisheries), (Undesertification), (Zoo-Wildlife Interests),

(Global Warming Mitigation) etc...

TECHNOLOGIES of the coming future

MAY ACT NOW)))

-I may afford a single Windturbine unit concept of generation capacity unprecedented, over: (10++ MW): onshore/offshore, curious-applications.

-For the (Heavy Winged Air Transporters, with Very Long Fuselage):

(Existing Regular FATAL, non-Recoverable STALLS), of:

(Nose-Up), or (Nose-Down), as well as (C.G Migration)-Attitudes: Now becomes automatically Recoverable in Real-time, with full safety, but to be above a limiting safer minimum ALTITUDE, Provided that the full installed THRUST POWER still alive (Intact)

-] I have only research designs and extraordinary schemes,

(To be PATENTED first), with deep affordable investigations and Solutions to (alleviate/mitigate) all of the existing drawbacks In wind technologies as:

(High initial coast),

(Few global-: manufacturers/developers),

(Labor load),

(Low energy density),

(Very rough generated power curve),

(Fragile to: high-winds/hurricanes/lightning),

Costly: (logistics/erection/frequent-repair),

(Wider land/sea-area requirement per installed power),

(greenless-recycling industry), etc...

-Plenty of my preliminary tests are designed without the need to the costly and permanently busy WINDTUNNELS, saving great time too.

-Setting [NEW STANDARDS] for all of the above and extra.

-Any of my items holding the name as existing counterparts but will be fully different in every thing like if you try to find the difference between a bicycle and a boat. How could you compare?!

E-mail acvbh2@r.postjobfree.com

acvbh2@r.postjobfree.com

acvbh2@r.postjobfree.com

Curriculum Vitae [CV]

[Mechanical Power Engineer] and [Marine Engineer]

Name : Nabil Mostafa Abdelhamid Hamdi

Birth : 27th Nov 1939, Cairo, Egypt

Nationality : Egyptian

Address : Cairo, Egypt

Health conditions : good, sportsman.

Qualifications:

i) B.Sc. degree, mechanical power engineering,

Ainshams University, Cairo, June 1965

ii) M.Sc. degree, design of heavy mechanical Equipment for metallurgical plant, from the Eltabbine Metallurgical Institute for Higher Studies, Cairo, supervised by the mother headquarte:

(Steel Institute) of [Moscow-USSR], June 1973

iii) No. 4533 Certificate of Competency, Marine Engineer Officer class two, Motorship (Diesel), from The Mercantile Marine Office, Dept. of Trade and Industry, London, England. 24th Sep 1980

iv) Short courses:

a) Human Relations: Alexandria

b) First aid at sea: England

b) Fire-fighting at sea: England

v) Other documents available:

a) Tourist Passport

b) Seaman's passport

c) Driving license

d) Sports trainer certificate (weight lifting)

Previous Experiences:

A) Total of 45 years in many engineering and industrial fields of which 13 years at the Jeddah Seaport Authority Saudi Arabia

B) Details:

1) Sugar Factories (Egypt), mechanical engineer,

General maintenance, (28 Oct 1965 till 14 Oct 1968). 2) Lead Storage Batteries Factory (Alexandria, Egypt) Chief of lead casting dept., equipment development, production and maintenance, (2 Nov 1968 till 30 Sep 1969).

3) Alexandria Shipyard, chief of Ship repairing Shop

(15 Sep 1969 till 16 Sep 1970).

4) Sea Going Ships, Greek Flag, third engineer,

Engine room, Mediterranean and oceans (high seas) as: a) Motor Vessel MV- LEFKIPOS, TDW 9160

(5 Aug 1970 till 22 Dec 1970).

b) Steam Ship Ss- THISBE, TDW 4400

(23 Dec 1970 till 3 May 1971).

5) The Egyptian Iron and Steel Company, Cairo

Senior engineer (mines, plant, project dept.)

(14 June 1971 till 18 Oct 1974).

6) Jeddah Seaport, Saudi Arabia, Diesel mechanical marine engineer for tug boats and different coastal barges and service vessels, (Marine Dept.), that was for six years, then to the

(seawater desalination plant of the port) of one million gallons per day, multi- staged flash evaporation that was for 4 years, then to the (Marine and Civil Workshops), for the last 3 years, i.e. total of 13 years, (16 Oct 1974 till 23 Sept 1987).

Hint: More than 3 months as engineer for the

Stand by Gas Turbine Genset of the Port 18 MW.

7) Since leaving Saudi Arabia till now:

Consulting works from time to time (free-lance) with private sectors, preliminary study, calculations, equipment estimation, Selection of contractors, manufacturers and suppliers, etc. for new projects and extensions.

C) FIELDS OF EXPERIENCE: Boilers, networks: (steam, waters, oils, fuels, compressed air & control lines), engines: (small

& heavy), turbines: (steam& gas), compressors, pumps, processing equipment: (sugar, seawater desalination, mining, metallurgy& chemical industries), Equipment: (marine, earth moving, mechanical handling, stevedoring, construction& machine tools), steel structures, sheet metal works: (light, heavy, hot& cold working), pipe works: (cold& hot), welding, civil works:

(masonry, carpentry, aluminum, asphalt works& plants), instrumentations& controls, safety engineering& fire fighting, Materials conveying: (mechanical, pneumatic& hydro-systems). D) TOPICS OF EXPERIENCE:

Design, development, modification, extension, improvement, Manufacturing of: (sister equipment, parts, special tools for Maintenance make easy, jigs and fixtures), operation and Maintenance, new erections, plant capacity modify or develop, etc. End of message

Dipl. Engineer

Nabil Mostafa

E-mail: acvbh2@r.postjobfree.com

acvbh2@r.postjobfree.com

acvbh2@r.postjobfree.com



Contact this candidate