Post Job Free
Sign in

Project Engineer

Location:
India
Posted:
June 18, 2016

Contact this candidate

Resume:

Curriculum Vitae

MADHANI DIXIT

Email:-

***************@*****.***

**************@*****.***

SKYPE ID:- madhani_dixit74

Mobile:-

+91-704*******

+91-942*******

Contact Address:-

Madhani Dixit,

504, Jay Complex, Near Shri Ram

Petroleum, Anand Mahal Road,

Surat, Gujarat. India.

Pin-395009.

Personal Data:-

DOB:- 11/05/1988

Gender: - Male.

Nationality: - Indian.

Marital Status: - Single.

Passport No: - K4235944

(30/03/2012-29/03/2022; Ahmedabed, India.)

Language Known:-

English, Hindi, Gujarati.

Favorite Pursuits:-

Music, Travelling,

Browsing Internet, Driving.

Objective:-

To achieve a challenging position and professionally stimulating in the profession that will enable me to prove my technical, managerial and interpersonal skills together with my ability to quickly acquire new skills so as to attain the goal of the organization aiming at mutual growth.

Education:-

BE in Mechanical Engineering, from Nagarjuna

College of Engineering and Technology, Bangalore in June 2011.

Skills & Accomplishments:-

Dynamic.

Good Logical & Analytical skills.

Effective Stress Management.

Good learner.

Technical direction/product strategies.

Dissertation:-

Software Knowledge:-

Catia V5 R19(CADD)

Solid Edge V18/19(CADD)

Ansys 10 (CADD)

CADEM 10 (NC PROGRAMMING)

MS Project 2013

PRIMVEERA P6

MS-OFFICE 2013

Work Experience:-

From 04-Nov-2015:-

Currently I work as Project Planning Engineer for 4*350MW CCPP Power Project, Reliance Industries LTD, Hazira, Surat, India from 04-Nov-2015.

Job Responsibility:-

Preparing Commissioning based schedule by checking work completion of entire system including operation related PSSR punch Point.

Preparing System wise completion plan as per Operation requirement.

Timely monitoring & updating construction Level 3 Schedule & analysis critical path.

Developing Area wise work completion plan based on overall project schedule.

Developing & Monitoring S-Curve for construction Leval 3 schedule.

Analysing the available resourse for proper utilization in project for completing project as per schedule.

Co-ordinating Engineering & Procrument related issue with Design & Material team.

FROM 06-May-2014 to 03-Nov-2015:-

I worked as a Project Planning Engineer for J3 Project – Reliance Industries LTD, Jamnagar, India from 06-May-2014 to 03-Nov-2015.

Project Details:-

NAME- J3 Expansion Project of Reliance Industries LTD for new project of DTA-PCG, SEZ-PCG, C2 Complex & PX-4. at Jamnagar, India.

Job Responsibility:-

Timely monitoring & updating construction Level 3 Schedule & monitoring critical path analysis with respect to EPC data, S Curve, Updating various Construction Databases & Monitoring Progress monitoring report for Management review.

Proper co-ordination with EPC team, Contract Cell & various other Dept.

Estimate Area Wise total scope as per drawing release, Generate proper front as per drawing avaible for construction & workout for material availability for construction.

Preparation of Weekly; Monthly & Three Months look-ahead Schedule. Updating actual Progress and all related information & comparison analysis

Tracking and maintain scope changes of Mechanical items for Piping; Structural Steel; Piping& Mechanical Equipment’s and its effect on the overall project schedule.

Estimation of Manpower Requirement for the Project based on standard productivity norms. Monitoring of actual resources availability & analysis using Histogram.

Preparing progress % calculation systems, earned man-hours, productivity & Trend analysis.

Preparation of Discipline wise liquidation plan, Productivity Analysis, Resource requirement assessment on weekly/monthly basis to enable management to fill up the gap.

Preparation Executive Progress Summary Report / Presentations to the Top Management on Project Status for periodical review.

To interact with PCM & issue project MIS to Client & H.O. on daily; weekly & monthly basis.

Development of Base Line Schedule (Level 2) using Planning Software Primavera or MS Project.

FROM 10-Aug-2012 to 26-Apr-2014

I have worked as a Project Engineer for Al Turki Enterprises LLC, PDO, Oman.

Project Details:-

NAME- Greater Rima Field Development Project – PDO, Oman.

SCOPE OF PROJECT:-

23 Nos. MSV with Carioles Meter & Red Eye Water Cut Meter in each MSV’s Test Header.

New 24” x 28 kms U/G GRE Pipe Line Installation

New 24” x 9 kms U/G GRE Pipe Line Installation including replacing existing 8” CS Pipe Line.

New 14”x 14 kms U/G GRE Pipe Line Installation.

Expansion work for the upcoming 150 wells

Installation of new MSV’s, CS Bulk Headers, Manifolds, GRE Transfer Pipelines & other Project Related Actives.

Job Responsibility:-

GRE pipeline installation project work.

Construction of Cross Country Pipeline work as per drawings & standards.

Hydrotestings, Radiography & Ultrasonic test for pipeline joint. Also Hook-Up

& Tie In’s to connect with existing Pipeline.

Handling Shutdown activity for project work.

Monitoring all activity of project from starting of construction work & Follow-up day to day activity & reporting to higher authorities.

FROM 01-Aug-2011 to 31-Jul-2012

I was working in Essar Power Salaya Ltd, Jamnagar, India, As an Assistant Manager from 01-Aug-2011 to 31-Jul-2012 in coal handling system for 1200MW Capacity Power Plant.

Project Details:-

Name: - Essar Power Salaya Ltd, Jamnagar, India.

SCOPE OF JOB:-

Operation & Maintaince activity of of coal handling system for Thermal Power Plant.

Job Responsibility:-

Operation handling for 2*1000TPH Capacity Belt Conveyor for Coal Handling System in 2*600 MW Capacity Thermal Power Plant.

Maintance activity of plumber block, replacement of rollers & idlers, gearbox, magnetic separator & other related activity for coal handling system.

Responsible for process troubleshooting, process start-up & shutdown operations, process improvement and process planning.

Job Assignments:-

Lending a team of Engineers (Operation & Maintaince).

Inspection of plant’s equipments along with Operations, Maintenance and Technical services.

Following Standard Operating Procedures, Monitoring of all Equipment’s. Academic Project:-

Project 1:- To study the fuel loss in the fuel tank of 2-wheeler at different conditions.

Project 2:- Development Condition based Monitoring for vital machine. Affiliations:-

• I completed my vocational training in “Vadinar Oil Terminal Ltd, (Essaroil)” from 4/7/2010 to 1/8/2010.

Fellowships & Awards:-

I got Rajya Puraskar on 22 fab 2003 in Scouts & Guides. Certifications:-

I completed my training course in Advance Catia V5 from 15/03/2008 to 30/04/2008. Job Interest:-

I interested specially for EPC project related to Oil & Gas plant, Petrochemical, Power Project, Steel Project etc as a Project/Planning Engineer. Declaration:-

I hereby declare that the information furnished above is true to the best of my knowledge and belief. I assure that, if I am placed, I will serve the firm with genuineness and dedication.

Your’s sincerely,

MADHANI DIXIT



Contact this candidate