Chinnadurai.P,
*******@*****.***,
UAE : Ph: +971*********
IND : Ph: +919*********
PROFILE
Mechanical Engineer with 7 years of experience in an EPC company for Oil & Gas construction project and major Shutdown work’s in piping. carried out testing activities in accordance with relevant standards – ASTM, ASNT.I have played the role of Piping engineer with excellent exposure and experience in various Construction Projects involving time bound schedules, Possessing good management skills.
Career Summary
Piping Engineer
Construction Knowledge
Generate the Master and Micro schedule based on the time construction circumstances,
Analyze the man power and equipment for the project, based on the master schedule,
To prepare the consumables for the project,
Analyze the material availability,
Preparation of Method statement for construction activities,
Responsible for fabrication and erection,
Report the progress details based on the production,
Prepare the progress report on daily and weekly basis,
Responsible for the site coordination between client and contractors,
Responsible for testing and commissioning for the equipment and system,
Pre-commissioning Activities
Establishing and maintaining professional working relationships with clients, subcontractors, vendors and suppliers.
Ensuring the project complies with detailed engineering, contracts and safety practices,
Able to handle work under pressure, achieving excellent results in the entire project handled.
Familiar with ASME, ASTM. API
Comply with Health, Safety & Environmental (HSE).
Sound Experience in analyzing the P&ID, GA and ISO Drawings.
QUALIFICATIONS AND PERSONAL SKILLS
B.Tech in Mechanical Engineer
RVD university –New Delhi
Diploma In Mechanical Engineer
Lakshmi ammal Polytechnic College, Kovilpatti
EXPERIENCE SNAPSHOT
Piping Engineer
Audex Fujairah LL FZE, Fujairah, UAE, Sep 2012 – Till date
Supervisor(piping)
Apr 2011 - Jul 2012
CCC International Company, Abudhabi, UAE
Junior Engineer (Piping)
Apr 2010 – Apr 2011
Mark Engineering (I) Pvt ltd, New Delhi, INDIA
Trainee Engineer
Apr 2009 – Apr 2010
Surya Fabricator, Kudankulam, INDIA
EMPLOYMENT DETAILS
AUDEX FUJAIRAH LL FZE –FUJAIRAH UAE. (Sep 2012 – present)
Audex Fujairah LL FZE is the EPC contractor; I have worked in various different Projects in this company till now.
Client: HORIZON EMIRATES TERMINALS LLC (HETL)-FUJAIRAH, U.A.E.
Projects Involved In: ENOC FUJAIRAH DISTRIBUTION & TREADING TERMINAL,
Client: FUJAIRAH OIL TERMINAL GROUP.
Projects Involved In: FUJAIRAH OIL TERMINAL- FUJAIRAH, UAE.
Client: VOPAK HORIZON, U.A.E.
Projects Involved In: BLACK PEARL PROJECT- FUJAIRAH,UAE(CURRENT PROJECT)
Position: Piping Engineer
Key Responsibilities:
To support to preparation the master schedule and micro schedule for the project,
Prepare the daily and weekly progress schedule for the project, involved in the piping technical clarification for the all in piping material,
Prepare the MS (Method of Statements) for all the piping construction activates, involved in coordination with the client and contractors,
Plan the work and prepare the manpower and equipment requirement based on the project schedule,
Coordinate with shop and site activates and full fill their requirements on time,
Prepare the fabrication schedule and erection schedule based on the master schedule,
Study the engineering drawing and check accordingly to the site condition, and get the knowledge of material delivery and plan the fabrication and erection,
Prepare the spool, support details and MTO for the fabrication, and survey the existing facilities for the erection and fabrication,
Involved in all the interfaces for the fabrication and erection activates,
Coordinate and plan with the other discipline for the inspection and testing,
Liaised with the Client and Company Inspectors in arranging for the Inspection and co-ordination with the Shop & Site Construction Teams.
Prepare all the MTO and mark drawings for the As-Built,
Prepared Permit to work (PTW) for all mechanical activities
Coordinated with QC Team for inspecting all project materials and getting approvals.
Fabrication done by using the international code ASME B 31.3.
Monitored and updated the materials usage and welding consumables for construction.
Engineer -In-charge & permit holder for all mechanical activities in site
Coordinated with Project and Quality departments for completing the project without any issue.
Coordinated and followed the HSE for safe working condition.
Prepared & Updated the Planning & Project Management chart for Mechanical works and explain to the client about the job completion.
Coordinated with Blasting, Coating and Painting team.
Planned and scheduled the work accordance with the clients’ project procedure.
Involved & completed the task of the Testing, Pre-Commissioning and Commissioning
Start Up with 100% of success
CCC INTERNATIONAL COMPANY, ABUDHABI
(Apr 2011 to Jul 2012)
Client: (ADCO) ABUDHABI COMPANY FOR ONSHORE OIL CORPRATION
Project: BAB THAMAMA GAS
Position: Piping Supervisor
Key Responsibilities:
Prepare material Procurement as per Drawing,
Construct & supervise the job as per our Requirement,
Preparation MTO based on the ISO drawings,
Preparation of Daily Progress Reports.
Prepare the Permit to work system
Refer the material specification and prepare the MTO as per the ISO,
Coordinated with Project and quality departments
Coordinated with Blasting, Coating and Painting team.
Execution Support for Hydro Testing Process
Coordinated and followed the HSE for safe working condition.
To do the field measurement where ever conflict at the site and prepare the site modification drawing as per the site condition.
MARK ENGINEERING (I) PVT LTD, NEW DELHI
(Apr 2010 to Apr 2011)
Client: (IGL) INDIRAPRASAD GAS LIMITED
Project: JDPL
Position: Junior Engineer (Piping)
Key Responsibilities:
Prepare the fabrication schedule and erection schedule based on the master schedule,
Study the engineering drawing and check accordingly to the site condition, and get the knowledge of material delivery and plan the fabrication and erection,
Prepare the spool, support details and MTO for the fabrication, and survey the existing facilities for the erection and fabrication
Prepare material Procurement as per Drawing,
Construct & supervise the job as per our Requirement,
Preparation MTO based on the ISO drawings,
Preparation of Daily Progress Reports.
Prepare the Permit to work system
Refer the material specification and prepare the MTO as per the ISO,
Coordinated with Project and quality departments
Coordinated and followed the HSE for safe working condition.
SURYA FABRICATOR, KUDANKULAM
(Apr 2009 to Apr 2010)
Client: NPICL
Project: Kudankulam Atomic Power Project
Position: Trainee Engineer
Key Responsibilities:
Study of Detailed Engineering of Piping Layouts & Isometrics
Ensure the pipe & materials and consumables as per specification during erection and installation
Preparation MTO based on the ISO drawings,
To prepare the weekly and Daily reports
supervising and monitoring the site Manpower force and the work
IT SKILLS
Well versed with MS Office Suite, knowledge of AUTOCAD
PERSONAL DETAILS
Nationality
:
Indian
Date of Birth
:
11th May 1987
Marital Status
:
Single
Current Location
Passport no
:
:
Fujairah (UAE)
H-6007213
Languages
:
English, Tamil, Hind
I hereby declare that the information furnished above is true and correct to the best of my knowledge and belief.
Place: Fujairah Truthfully
Date :19 Aug 2016 Chinnadurai.P