Samer Korek
Address
Ladkani building - Haykalieh – El Koura - North of Lebanon
Lebanon
Mobile: +234********** / +961-*******
Home: 961-***-****
e-mail: acv89i@r.postjobfree.com
Personal
Information
Nationality: Lebanese
Date of Birth: February 12, 1973
Place of Birth: Tripoli - Lebanon
Experience March 2013 – Present
NETCO DIETSMANN
AFAM VI COMBINED CYCLE POWER PLANT – RIVER STATE – NIGERIA – SHELL PETROLEUM DEVELOPMENT COMPANY SPDC DCS ENGINEER.
DEPUTY MAINTENANCE MANAGER
Managing the Maintenance department and monitoring the scheduling of all Preventive and Corrective maintenance activities in order to comply with SPDC KPIs (Key Performance Indicator).
Act as Outage manager, during Alstom’s inspections. Automation & Control for METSO DCS system
Automation & Control for Alspa DCS system (Alstom Steam Turbine Control system).
Automation & Control for SIEMENS S7
Automation & Control for Egatrol – Alstom Gas Turbine 13E2 SAP access holder for SPDC (Shell Petroleum Development Company) for the execution and integrity of Maintenance activities MIE. October 2012 – February 2013
HOLCIM CHEKKA – Lebanon
Sofimat – BCC Servives
Erecting and Commissioning for all Electrical equipments Erecting and commissioning for all instrumentation and Automation.
Assistance in all aspects of Start up of the plant (Process, Operation and Maintenance)
August 2012 – November 2012
HOLCIM CHEKKA – Lebanon
Sofimat – BCC Servives
Revising and Engineering for Holcim Power Plant.
Coordinating between the Client, Main Contractor and different sectors on Site.
The project is to install 3 Heat Recovery Steam Generator on 3 Diesel Generators, in order to run a 4 MW Steam Turbine. The plant include the installation of ORC – 265 KW
BCC Services is the main contractor to achieve the installation of Piping, Electrical and instruments.
June – July 2012
Deir Aamar Powre Plant – Lebanon
YTL Malysia – Siemens / BCC services
DCS upgrade from Siematic S5 to Siematic S7
Implementation of SPPA-T3000
Process and Start up of Siemens Gas Turbine V94.2 after LTE May 2012
Zouk Power Plant – Lebanon BCC Services / EDL
DCS expert ABB Symphony – Harmony DCS
POSITION: DCS engineer
Commissioning and start up for Boiler of unit 3 at the completion of rehabilitation of Boiler.
April, 2012
Zouk Thermal Power Plant - Lebanon – EDL/BCC Services I&C expert
Design, installation and commissioning for Boiler Fire Sight Furnace Camera LENOX
March, 2012
BARKAII Power Plant - Oman – ABB Genova/BCC Services DCS expert ABB Symphony – Harmony DCS
Intervention activities on Site
To implement major modification requested by Ansaldo Energia on Control logic for Gas Turbines # 1
To make investigations on failure of several DCS Modules. To check communication system, with Siemens system (Sequence of Events.)
December, 2011
BARKAII Power Plant - Oman – ABB Genova / BCC Services DCS expert ABB Symphony – Harmony DCS
Intervention activities on Site
To implement major modification requested by Ansaldo Energia on Control logic for 2 out of 3 Gas Turbines.
To make investigations on failure of several DCS Modules. To check communication system, with Siemens system (Sequence of Events.)
August, 2011
Kfoury Metalls–BCC Services
I&C Expert
Rehabilitation of the control system DIEGO II ABB
Calibration and checking all set points
Open loop and close loop check
Logic and process functional tests.
July, 2011
CHEHAB MEDICAL GASES –BCC Services
I&C Expert
Rehabilitation of various type of instrumentation
Calibration and checking all set points
Open loop and close loop check
Logic and process functional tests.
June, 2011
VALATHUR Power Plant - India –BCC Services/ ABB
Genova/ANSALDO ENERGIA ASPL
DCS expert ABB Symphony – Harmony DCS
Urgent Intervention activities on Site
- To assist in starting again the Turbine after a sudden trip due for human operation done on DCS system.
- Installation of new Termination unit cables.
- Installation and Calibration of new IMHSS03 for the Fuel Gas Pilot Control Valve.
April, 2011
VALATHUR Power Plant - India –BCC Services/ ABB
Genova/ANSALDO ENERGIA ASPL
DCS expert ABB Symphony – Harmony DCS
Intervention activities on Site
To assist in the Re-commissioning and Start up of the Gas Turbine V64.3.
- complete check-up for the DCS system, Hardware configuration and connection prior to Power Up the system
- Changeover of damaged Power supply
- Changeover of damaged Modules
- Re-build for the PGP (HMI) data-base
- Clear of Diagnostic unused Alarms
- Calibration of Fuel Gas Control Valves: Premix, Diffusion and Pilot
- Check of all field to DCS input terminations (analog and digital) signals, as well as Electrical equipments and protections for SFC,EXC and Generator Circuit Breaker.
May, 2011
LIBERTY Power Plant - Pakistan – BCC Services /ANSALDO ENERGIA
DCS expert ABB Symphony – Harmony DCS
Intervention activities on Site
To assist in the Re-commissioning and Start up of the Gas Turbine V94.2. Complete check-up for the DCS system, to Power Up the system
- Changeover of damaged Modules
- Re-build for the PGP (HMI) data-base
- Retrieve of Historical Data for the plant
- Calibration of Fuel Gas Control Valves: Premix, Diffusion and Pilot
- Calibration of Fuel Oil Return Control Valve
- Check of all field to DCS input terminations (analog and digital) signals, as well as Electrical equipments and protections for SFC,EXC and Generator Circuit Breaker.
December, 2010
BARKAII Power Plant - Oman – ABB Genova/BCC Services DCS expert ABB Symphony – Harmony DCS
Intervention activities on Site
To implement major modifications requested by Ansaldo Energia on Control logic.
To complete a list of pending point in DCS infi 90:
- calibration of Fuel Oil Return Control Valve for GT#1
- Changeover of Servers
- Clear of Diagnostic unused Alarms
- Rebuild of Data – base for GT#3
- Changing of damaged modules (NIS, NPM, BRC & MFP) December, 2010
AMMAN East Power Plant- Jordan – ABB Genova/BCC Services DCS expert ABB Symphony – Harmony DCS
Intervention activities on Site
To implement major modifications requested by Ansaldo Energia on Control logic.
To complete a list of pending point in DCS infi 90:
- Synchronization of infi 90 with Emerson system’s Master clock
- Clearness of unusual Alarm messages
- Changing of damaged modules (NIS, NPM, BRC & MFP)
- Signal Check with Electrical Department ( Medium Voltage signals)
- Upgrade of EWS Operating Systems
21/06/2009 – 21/10/2010
Zouk Power Plant - BCC Services – Lebanon
EDL
DCS expert ABB Symphony – Harmony DCS
Training programs for Engineers and Technicians
In order to achieve complete training for EDL Engineers and Technicians to take the complete control of the system.
DCS engineer for the 3rd Unit – Steam turbine 150 MW
Duties are to resolve, modify and enhance all the operating conditions of the plant (Auxiliaries, Boiler and Turbine).
Achieve and increase efficiency and performance done on the machine.
To monitor all blocks and to make any modification requested by the client.
To check all power supplies and their redundancy
To check all Processors and their redundancy
Complete with the management of the plant any modification to be implemented, modified, tested and approved.
On call duties for any emergency and operational of the turbine February,2010 Hraycheh power plant – BCC Services - Lebanon KADISHA
POSITION: I&C engineer
Rehabilitation and complete calibration of all instruments for the 5th set of steam turbine in Plant.
01/09/2009 – 16/04/2010 Zouk Power Plant - BCC Services – Lebanon EDL
DCS expert ABB Symphony – Harmony DCS
POSITION: DCS engineer
DCS engineer for the 3rd Unit – Steam turbine 150 MW
Duties are to resolve, modify and enhance all the operating conditions of the plant (Auxiliaries, Boiler and Turbine).
Achieve and increase efficiency and performance done on the machine.
To complete all existing and resulting outstanding items after the complete commissioning work that had been done.
To monitor all blocks and to make any modification requested by the client.
To check all power supplies and their redundancy
To check all Processors and their redundancy
Complete with the management of the plant any modification to be implemented, modified, tested and approved.
On call duties for any emergency and operational of the turbine May 2009 – September 2009
Zouk Power Plant – Lebanon- BCC Services / ABB Genova Senior commissioning engineer DCS – I&C
Symphony – Harmony DCS and Power Generation Portal as Human interface
Replacing the existing obsolete automation system with the new generation DCS.
Duties started from controlling all hard-wired connection, putting under supply the DCS system, cold commissioning and hot commissioning
Achieve the complete start-up of the unit.
Complete all interconnections from field to the DCS.
Complete all configurations of Electrical Side, during the re-installation of the new Low Voltage cubicles
Complete all configurations with Substation, In order to have the system integrated in DCS. Programming all converters for High Voltage ( VT’s and CT’s)
The commissioning and start up of the machine by the detailed work on each equipment: Lubrification, control oil, hydraulic system etc.
The check of each loop, by simulation and by real tests
Modification, configuring, tuning and testing of each block in the logic system
All configurations for the modules made by software and hardware. March 2009
ABB- Genoa – Italy/ BCC Services
DCS engineer Symphony – Harmony DCS
Update training courses for the new Symphony – Harmony DCS and the PGP Power Generation Portal.
September 2008 – February 2009
BCC Services - Lebanon
Dcs – I&C Engineer –ABB Power Generation Portal
Translating all P&ID’s to the new Display Graphics for Zouk Power Plantt- Unit 3. (PGP Display Builder).
Complete Reverse Engineering for the Zouk Power Plant- Unit 3
Preparing all Field Instruments Calibration Forms. 2007 - 2009
Technical institute of Chekka
Electronic Teacher for courses and laboratory division. 2006 – 2009
IPE Industrial Power Electronics - Lebanon
-Partner in the above mentioned company.
-Design and implementation of various control electronic boards for Low Voltage Generators.
-Competition of various projects for automated and controlled systems for
- Start up and ATS (automatic transfer system).
- Programming range type of micro-controllers and micro-processors ( Microchip PIC, Motorola and Cypress)
15/02/2006 – 15/05/2011 KEPPCO – Keleco
2004 – 2006 Power Services and Management PSM
2001 – 2004 Enel Produzione
1998 – 2001 ANSALDO – O&M
Deir Aamar Combined Cycle Power Plant – Lebanon
Central Control Room Operator
Operating and monitoring two gas turbines
(Siemens kW UV94.2 - 2 X150 MW)
Operating and monitoring the two Heat Recovery Steam Generators
(HRSG) combined to the two Gas Turbines.
Operating and monitoring the Steam Turbine (150 MW) coupled to the 2 HRSG’s
Operating and monitoring the complete combined cycle.
Operating and monitoring all Auxiliary Systems in the Plant ( Fuel Gas System - Fuel oil Treatment – Water Treatment - Waste – Chemical etc .)
Monitoring the Plant Performance as is open cycle power plant and as in well in closed combined cycle.
Insuring the Operational Conditions of the Plant from several points of view: Control, Electrical, Mechanical and Safety conditions.
Insuring as to the Process Control Engineer the operational parameters of all instrumentation and logical sequences of each system.
Insuring the contacts between all administrative positions and the field: Operation Engineers, Unit Operators and Field Operators.
All these task were directly involved with the infi 90 DCS system 1997 – 1998 ANSALDO – energia
Deir Aamar Combined Cycle Power Plant – Lebanon
DCS and Instrument & Control Technician ( commissioning)
DCS commissioning under the direct supervision of infi 90 Bailey.
All configuration and tuning of various blocs of the control logic philosophy
All configuration for software and hardware
Cold commissioning of DCS as well as Hot commissioning
The start up of each equipment for the hot commissioning and tuning all feedbacks and controls.
Calibration of large categories of field instruments, local and remote.
Calibration of large categories of chemical instruments.
Reviewed, checked and tested instruments wirings according to drawings
Checked the logical sequences according to IFCD Functional and Logical Drawings.
1995 – 1997 Simec sarl
Tripoli, Lebanon
Head of Technicians and Sales
Involved in the organization of the technical department of the company as well as sales.
Responsible for the office equipment department sales.
Leading the technical team in the office equipment department that was involved in various task:
- Copier machine, Cash register, Teller machine and Faxes
- Electronic switching systems
- Power regulation
Education 2005–2006 Technical Institute of Tripoli (2 years)
Technical Licensee in Industrial Electronics LT
1992–1995 Technical Institute of Zghorta (3years)
Senior Technician in Electronics TS
1989–1991 Technical Institute of Tripoli (3 Years)
Technical Baccalaureate in Electronics BT
Languages
English, French and Arabic fluently.
Italian poorly.
Tips Professional Experience
The role played in Afam VI CCPP implement different type of responsibilities and acquisition.
In order to perform the higher standards of maintenance rehabilitee and execution, it was due to undertake several seminars conducted by SPDC experts and coaches.
As I was undertaken the Official training of SAP, and MIE for Shell Petroleum Development Company it implement different aspects in Maintenance Execution even regarding the management of the FSR Facility Status Report and monitoring all the dashboards in order to ensure the compliance of the maintenance activities.
The role involved in different aspects of responsibilities and it starts from the DCS tasks to be implemented, to preventive maintenance and corrective maintenance of the control system in the plant. The plant is controlled mainly by METSO control system that accepts all communications from different control systems: ASLPA for Alstom Steam Turbine, EGATROL for 3 Alstom Gas Turbines and all relevant auxiliaries in the plant controlled by SEMATIC S7.
The necessity of expertise implemented on me to take over the HVAC department, and to control the Contractors on site for the preventive & corrective maintenance plans, insuring the high performance of the equipment.
The role implements the capability of raising RCA (root cause analysis) for most of the disciplines in the plant.
The type of rotation of the team, gave me the chance to role as Acting Maintenance Manager of Afam VI Combined Cycle Power Plant taking all responsibilities and professional responses for all kind of activities. Insuring the compliance of the Maintenance Department with SPDC MIE. The previous experience with ABB & ANSALDO enhanced my expertise: The ABB DCS systems have the same basics, which will open all possibilities to work on all products of ABB.
As known that ABB has several systems that have the same basis configurations starting from infi 90, through Advant system till reaching the Power Generation Portal and Composer – Harmony Working deeply in One of ABB products give the chance to work on all ABB systems, for me I did work on more than one(composer,PGP, Advant, Infi90) The experience in any DCS system will implement the knowledge to be involved in various types. I was involved in S7 – SPPA – T3000 for siemens, during the upgrade from old X-teleperm used with S5. Power Plant Experience
As the experience of working with international companies as NETCODIETSMANN, SPDC, ABB, Ansaldo, Enel and Siemens, it gave me a new frontiers and perspectives in Power plant industries. The professionalism of preparing, coordinating, correcting and implementing the job upon the planning done by the management that is used by international companies gave me a great idea of the jobs and tasks that must be done by individuals.
The implementation of SAP in order to ensure the compliance of maintenance activities enhanced my aspects regarding maintenance integrity and execution adopted by many international companies as the client that was SPDC
During my work with Ansaldo O&M (1998-2001), I’ve took many jobs
(freelancer) with Ansaldo energia concerning putting in preservation the third set of generation ( 2 Heat Recovery Steam Generators, Turbine, Generator and all the auxiliaries related to this set). The preservation of this set was done on Instrumentation, Electrical and mechanical equipments as well as the chemical preservation.
Before starting these tasks, I was involved, under a local subcontractor to Ansaldo energia, in the completion of outstanding items that were not done during the erection and commissioning of Deir Aamar Power Plant. During my work with Enel produzione (2001 – 2004), I was transferred by my company to the EDL client Ansaldo energia in order to start up the 3rd set ( 2 HRSG’S AND STEAM TURBINE). My job was in re-commissioning of all systems related to this set. The job was from DCS, line up of system, start-up till the operation act under normal conditions.
During my previous work with BCC Services, I manage several activities indirectly, starting from biding, procurement, training, managing and several minor activities.
One of the major achievements was the reverse engineering for ZOUK thermal power plant, where we had to convert a very old Control System ELSAG BAILEY to the new ABB Harmony-Composer DCS. We had to prepare all documentation from instrument lists, electrical loads, all I/O signals. The second stage was to convert all the logic to compatible logic with the new DCS system. Then it was all loaded in Italy, ABB Genova. I had the honor to be involved in Italy with the FAT.
ABB Genova planned the commissioning of ZOUK thermal power plant, and I was the DCS Engineer for installation, commissioning & start up, under the supervision of ABB Commissioning manager. After the completion of the commissioning phase, I was the DCS Engineer in Zouk for 9 months to support during O&M of the plant, than I played the role of main instructor to the I&C Engineers, I&C Technicians & Operation Department in order to handover all the activities for them.
From my point of view, this professional experiences in Power plant industries, Water treatment or Fuel treatment could assist in choosing several sectors in industry, jumping from Power plant and auxiliaries till Oil & Gas industry.
The experience of working with NETCO DIETSMANN & SPDC developed too many managerial and engineering skills. The power plant contains most of the important process in industry, from power generation, gas stations, condition emissions & water treatment.
To add, I did work with several industrial equipments:
- TSI (Turbine Supervisory Instruments)
Bently Nivada
- TSI Philips
- Power Converters SINEAX – PHILLIPS
- Transient Recorders AMETEK
- BMS (Burner Management Systems) and
flame detection (ABB)
- Boiler Fire Sight Furnace Camera Lenox
- MINIMAX fire detection system
- URAS 14 & 26, LS25 & MAGNOS 106 &
206 for CEMS
- Notifier AM6000
- Tantronic Gas Detection System
Certified via several international companies in domains of Automation, HSE, CO2 emission, Maintenance Execution, Auditing:
- Internal Audit Training: QESH Standards limited, Nigeria
- Emergency Response Training: SULAN Services Limited, Nigeria
- Continuous Awareness for HSE rules, complying with SPDC and Dietsman regulations
- Microsoft Project 2010: Eldmux Global Concepts Limited, Nigeria
- CO2 emission management: SHELL Training School, Nigeria
- Incident & investigation reporting: El Sapic, Port Harcourt, Nigeria
- Confined space Training : El Sapic, Port Harcourt, Nigeria
- MIE SPDC NIGERIA: Maintenance Integrity and Execution, SHELL Training School, Nigeria
- HUET : Training done by CHARKIN MARITIME SAFETY CENTRE, Nigeria
- SAP professional training, Access and execution, SHELL Training School, Nigeria
- ABB Genoa – Italy :Harmony-composer DCS system (done in Italy)
- ABB Genoa – Italy :Power Generation Portal PGP (done in Italy)
- JMS software USA: Reliability-Centered Maintenance RCM (done in Zahrani combined cycle power plant - Lebanon)
- KOMIPO Korea: Operation and Maintenance for Combined Cycle Power Plant (done in Beddawi combined cycle power plant - lebanon)
-ANSALDO ENERGIA Lebanon : for commissioning activities done on infi 90
-ANSALDO ENERGIA Lebanon: for I&C commissioning activities on Gas turbine v94.2, Heat Recovery Steam Generator HRSG, Steam turbine, Desalination plant, Demineralization plant, Fuel Oil Treatment Plant. Computer skills
Microsoft Project 2010 - Microsoft office – SAP - OrCad – Simplorer – Mplab – Matlab – Proteus – MicroBasic –AutoCad - Network Computer languages
Basic - Fortran - C++ - Visual Basic – HTML - Java REFERENCES
ABB Genova – Italy:
Michel Fares 003***********
Carlo Guesto 003***********
ANSADLO ENERGIA
Vittorio Cristofori 009***********
Fulvio Valerio 003***********
YTL Deir Aamar Power Plant – Lebanon
Amer Demloj 009*********