Jon Paul Davis
************@*********.***
Professional Experience
Arrow Energy Feb. 2015- June 2015
Queensland, Australia
Senior Wells Operation Supervisor
Project suspended, accepted settlement to return to Texas.
Ener- Safe Consulting Jan. 2014- Feb. 2015
West Texas / Permian Basin
Drilling Consultant
Supervised all drilling operations on- site (both straight hole and directional)
Planned and executed the activities related to drilling operations as part of a high performance team
Project cost management and the accuracy of morning reports and cost data
Responsible for the over site of logistics (equipment, manpower, materials)
Work closely with engineering, subsurface teams, and vendors in planning and executing work safely and efficiently
Maximized the rig team performance by building an enabling environment where everyone has the freedom to contribute to the success of the operation
BP America- Texas, Oklahoma and Wyoming Oct. 2006- Feb. 2013
Well Site Leader
Supervised rig activity including tubing installs, tubing lowering, dry hole tree installation and repair, casing patch(s), wellbore clean outs
Coordinated/ Supervised wellhead change outs and/ or repairs
Conducted well P & A’s and wellhead cutoffs
Worked with slick line unit(s) on the plunger maintenance/plug installation
Installed surface casing risers and record pressure anomalies and report back to Well Integrity Team to formulate a plan forward
Supervised all drilling operations (both straight hole and directional)
Drilled the fastest horizontal hole section in the Woodford Shale
Assigned to Special Projects- Coil Tubing Drilling (CTD) project in the Panhandle of Texas and Oklahoma as a Well Site Leader (WSL)
Utilized managed pressure drilling techniques along with a 2 phase circulating system(fluid and nitrogen)
Managed different sidetrack and re-entry jobs (kick-off plugs, one trip whip stocks in the casing, and open hole whip stocks)
Education
WEST TEXAS A&M UNIVERSITY. Bachelor of Science in Agricultural Education
Canyon, TX August 14th, 2006