Post Job Free
Sign in

Engineering Engineer

Location:
Flower Mound, TX
Salary:
125,000
Posted:
August 15, 2016

Contact this candidate

Resume:

PHILIP SCHIED, PE

*** ********* ******

Flower Mound, Texas 75028

c: 972-***-****

*******@***.***

EDUCATION:

Aug 1980- May 1984 South Dakota State University, Brookings, South Dakota

Bachelor of Science Degree in Electrical Engineering

Aug 1976-May 1980 University of South Dakota at Springfield, Springfield, South Dakota

Bachelor of Science Degree Electronic Engineering Technology, with a

minor in Industrial Engineering

ENGINEERING EXPERIENCE:

Jan 2016 - Present C&D Utility Consulting.

Energy – Distribution, and Project Management

Engineer VI: Distribution Services and Project Management

Jan 2013 - Sep 2015 Freese & Nichols Engineering Consultants: Fort Worth, Texas.

Energy Group -Transmission, Substation, Distribution, and Project Management

Engineer VI; Electric Utility - Transmission, Substation, and Distribution Services

Reviewed Transmission, Substation, Distribution projects for Co-ops and

Investor Owned Electric Utilities with in Texas.

In addition, my responsibilities include:

Lead on Underground Distribution Feeders for Southern Methodist

University; Dallas, Texas.

Developed utility clearances recommendations within the high speed

rail corridor and provide utility contacts per county for all routes from

Dallas to Houston, Texas.

Reviewed designs of future Transmission and Substation projects

for Denton Municipal Electric. Developed inventory

method to track Capital Expeditors for transmission and substation

projects.

Lead Transmission line design and line location. Lead PC Based

Material Acquisition System and Electronic Construction List

Conversion Projects, Denton, Texas.

Developed distribution layout, materials cost to serve oil field, West Texas.

Aug 2008-Jul 2012 Texas New Mexico Power Company: Electrical Utility - Lewisville, Texas.

Engineering Manager – Transmission, Substation and Distribution Services

Review Transmission, Substation, Distribution projects for Co-ops and

Investor Owned Electric Utilities

In addition, my responsibilities include:

Supervised; 3-Engineers, 2- Engineering Technicians

and 3-Engineering Assistants

Designed Substation Expansion, cutover existing 4.16kV to

12.47kV. Installed a 3750kVA 3Ø transformer, install 69kV

Dead-end tower, vacuum reclosers, regulators, and metering,

Saint Jo. TX.

Lead Substation upgrade, increase transformer capacity for 20MVA to

42 MVA, Lewisville, Texas.

Lead 138kV Transmission metering connection point, Lewisville, Texas.

Implement the purchase and change out of eleven 345kV breakers

throughout TNMP’s substations with 345kV breakers on Oncor’s system.

Design within the five year budget a 138kV transmission loop system and

Two additional substation housing 4- 42MVA 138kV/24.9kV distribution

substations in Princeton, Texas.

Prepared loading data and route selection for a 138kv transmission line to

energize a new substation in Westminster, Texas. Presented route and

future station site to the Public Utility (PUC) of Texas

Lead person on the SADI and SAFI reduction team.

Design and install, DC protection fences on perimeter of substations to

reduce varmint outages

Developed third source transmission feed to TI Substation

Provided Field Troubleshooting and Construction Assistance

Reviewed Geotechnical and Foundation Designs for Transmission

Line Structures

Lead Engineer for the Longneck Substation Design and build, Princeton,

Texas.

Nov 2002-Aug 2008 Texas New Mexico Power Company – Electrical Utility

Engineering Supervisor - Distribution and Project Management

In addition, my responsibilities include:

Supervised 1-Engineering Technicians, and 3-Engineering Assistants

Developed plan to serve a 300 lot subdivision (Grand Cave Subdivision)

with 12.47kV underground distribution service, Texas City, Texas.

Designed, Project Manager of distribution feed to Grand Cave

Lead Team in compliance of Levey Clearance Issues, Texas City, Texas

with the Core of Engineers of Galveston County, Texas.

Jun 1998-Nov 2002 Texas New Mexico Power Company (New Mexico) – Electrical Utility

Engineering Manager: Lead Coordinator of Transmission flows and access,

Substations, and AC-DC tie shared assets with New Mexico Public Service

and El Paso Electric, Texas.

In addition, my responsibilities include:

Lead person to review all contracts with other utilities operating

within NM service territories.

Lead Representative (TNMP) in negotiating changes to contracts

involving shared ownership of facilities

Upgrade and Increase 138kV line capacity from Deming to Los Curses

New Mexico from 60MW to 130MW

Provided Field Troubleshooting and Construction Assistance

Reviewed Geotechnical and Foundation Designs for Transmission

Line Structures

May 1994-Jun 1998 Texas New Mexico Power Company – Electrical Utility

Business Unit Manager: Bay Area Business Unit, Friendswood, Texas.

In addition, my responsibilities include:

Supervised 2-Engineer, 2-Engineering Technicians, 6-Engineering

Assistants, 2-Line Foreman’s, 2-Crew Supervisors, 38-Linemen,

2-Material Coordinator, and 6-Office personnel

Supervised operations involving transmission, substation and

distribution facilities serving over 34,000 customers

Jun 1990-May 1994 Texas New Mexico Power Company – Electrical Utility

Business Unit Manager: North Texas Business Unit, Lewisville, Texas.

In addition, my responsibilities include:

Supervised 1-Engineer, 2-Engineering Technicians, 4-Engineering

Assistants, 3-Linecrew Foreman’s, 3-Crew Supervisors, 20-Linemen,

and 3-Material Coordinator

Supervised operations for transmission, substation and

distribution serving 34,000 customers in South Texas.

Jun 1984-Jun 1990 Texas New Mexico Power Company – Electrical Utility

Energy, Engineer I, II, III, IV, and Engineering Supervisor

In addition, my responsibilities include:

Supervised: 1- Engineer, 2- Engineering Technicians, 4-Engineering

Assistants, and 3-Line Foreman’s, 3-Crew Supervisors, 20-Linemen,

and 3-Material Coordinators.

Engineered Transmission, Substation and Distribution projects

Lead in reviewing purchase power statements to determine correct

billing

Appointed Facilities Information Coordinator for computer

distribution modeling software

Developed system conversion from 4kV to 22kV to reduce circuit

Loading

Developed distribution underground system for 190 lot Mobile

Home Park

Lead on estimating additional growth for new High School

ADDITIONAL INFORMATION:

Registered Professional Engineer in the State of Texas

Associate member of the National Society for Professional Engineers

Texas Society of Professional Engineers

Institute of Electrical and Electronics Engineers, Inc.

SKILLS & CERTIFICATIONS:

Computer: Oracle, Banner, Arc-FM, Access 7.0, Power Plant, Micro Soft Office -Word,

Excel, Schedule, Power Point, Note, Calendar, (Windows) Pass-Port, Mil-Soft

(Wind Mill) Engineering Analysis, People Soft, Asset ++, Hyperion Budget

Planning (Oracle).

UPPER LEVEL MANAGEMENT TRAINING:

Training: Six Sigma-Green Belt, Achieving Extraordinary Customer Relations for Electric

Utilities, Contract Law 101 Manager’s coaching for Employee Development,

Fundamentals of Project Management, and Inspiring People at Work.



Contact this candidate