Post Job Free
Sign in

Industrial Engineer

Location:
Arlington, TX
Posted:
August 12, 2016

Contact this candidate

Resume:

SUMMARY

Highly motivated and solutions-driven professional with ability to leverage current education and relevant experience while excelling in Industrial Engineering.

EDUCATION

Master of Science in Industrial Engineering May 2016

University of Texas at Arlington, TX GPA 3.4/4.0

Bachelor of Technology Industrial Engineering May 2013

Vishwakarma Institute of Technology, Pune, India GPA 7.9/10.0

SKILLS

Continuous Improvement: Lean Manufacturing & Six Sigma, Kaizen, SPC, DFMEA, Time/ Motion Study (PMTS, MOST), JIT

Data Analysis: Linear regression (SLR & MLR), Simulation & Optimization

Logistics: Logistics Transportation, Inventory and Materials Management, Facilities Planning & Design

PROFESSIONAL EXPERIENCE

Industrial Engineering Intern Feb-May 2016

North Central Distributors, Dallas, Texas

20% increase in the warehouse capacity was achieved by redesigned and drafting warehouse layout and inventory locations considering Par-level of inventory

Conducted training for warehouse employees for application of standard procedures. Streamlined product flow by implementing KANBAN system

Supported demand planning team with data analysis and improvement initiatives. Maintained inventory accuracy by cycle counting and updating DAC – CDR system

Spearheaded time studies to reduce order picking time and establish labor standards

Research Assistant Sept-Dec 2015

Radio Frequency & Auto Identification (RAID) Labs at UTA, Arlington, Texas

Reading of UHF RFID Tags was done to measure their performance to compare with benchmarked standards

Designed standard technical operating procedure manuals for RFID tags readers

Supply Chain Intern May 2012-March 2013

KSB Pumps Ltd., India

Reduced 20% of overall lead time by using Lean waste reduction techniques and Kaizen to improve work flow schedules

Reduction in 40% product search time and 10% capacity increase was achieved by designing a new storage rack system in the dispatch section

Determined root cause/corrective preventive action for material on hold, customer complaints and supplier corrective actions (SCARs). Liaised between manufacturing and executive teams as a contributor to development of SOP’s to reduce lead time

CERTIFICATIONS

Green Belt in Six Sigma (Expected August 2016)

ACADEMIC PROJECTS

Quality Improvement: Rectified mobile phone manufacturing procedure by using PDSA tool and Statistical Process Control techniques

Regression Analysis using SAS: Simple and Multiple Linear Regression analysis using SAS was performed using real time data to find out the factors hindering product performance

Factory Simulation: Simulated PV cell production factory to satisfy 0.75 MW/month power requirement using WITNESS

Time Study Project: Reduced packaging cost by 11% using method and time study

Facilities Design: Designed facility layout for wholesale footwear distribution center to facilitate the storage for the next 5 years anticipated growth

COMPUTER SKILLS

MS Office, MS Access, SQL, MS Project, MS Visio, Auto-Cad, SAS 9.4.0, WITNESS 14, AS400, SolidWorks, Minitab, Matlab

HONORS

Technical Education Scholarship for undergraduate studies – All India Council Aug 2009- May 2013



Contact this candidate