Post Job Free
Sign in

Management Project

Location:
Madison, AL, 35758
Posted:
August 11, 2016

Contact this candidate

Resume:

EDWARD BROOKS JR

**** ******* *****, *******, ** 35758 C: 206-***-**** *************@*****.***

PROFESSIONAL SUMMARY

Seeking an opportunity for employment to further experience and become a value for your company. With the

ability to learn very quickly, stay focused, along with qualified skills and eagerness to learn, I can become a

value and an asset to your company and together, grow towards success.

SKILLS

Failure Analysis Photography

Metrology - Calibration/Certification Windows Office 7 and 13

Fiber Optics Precision cutting

Digital Microscopes Fiber Optic Testing/Inspection/Cleaning

3D Optical Measuring Systems Thermal and Temperature Cycling

Metallurgy Analysis Evaluate and Qualify Crimp Tools and

Cross-Sectioning w/ Epoxy Combination

Project Management Soldering

Inventory Management Accelerometers

System Troubleshooting Low/High Frequency Shakers

Electrical Design & Intergration Wire/Cable/Coaxial Installation/Removal

Database Entry & Management Tensile using Bluehill Software and Instron

Report Analysis Testing with Pins/Sockets/Terminals/Splices and

Read & Understand Schematics Copalums

Very Quick Learner Understanding and performed work following

Specifications, Procedures and Standards

WORK HISTORY

Cable/Internet/Phone Installation Technician, 04/2016 to Current

CVRS Telecommunications – Hazel Green, AL

Check and verified signals with meter also calculating Db signal loss/gains

Ran cables, connect and ground cables and connected receivers.

Attached electrical and telephone wiring to properly connect components.

Positioned and terminated cables, wires and strapping.

Fed cables through access holes, roof spaces, attics, crawl spaces and cavity walls (wall fishes).

Installed cable support systems and prepared outlets.

Programmed and troubleshot devices following installation (trouble calls).

Frequently diagnosed mechanical problems and determined how to correct them.

MP&P Lab Technician Level 2, 07/2010 to 09/2015

The Boeing Company – Seattle, WA (Feb. 2015) / Huntsville, AL

Perform Failure Analysis on in-flight airplanes.

Design and build text fixtures to recreate the failures on airplanes.

Test and evaluate crimp tools and crimp indents to specifications (BSS7070) and report to our customers,

vendors and upper management.

Provide emergent testing while following procedures and requirements that are approved by the FAA.

Train and coach new employees how to test, evaluate and report out test results and data.

Writing procedures and processes for future and current employees

Researching about new products and presenting to management and/or hosting meeting/presentation.

Working with fiber optics, performing Optical Lost Test, Swing Test and Temperature Cycling, along with

examining the end faces of the cables.

Used precision test equipment such as oscilloscopes, multi-meters, waveform generators and spectrum

analyzers.

Collaborated with engineers at the new product introduction phase to develop and verify design changes.

Initiated contact with vendors and built solid working relationships with them.

Followed up on manufacturing and field reports and resolved outstanding problems.

Conducted engineering and detailed experimental tests to collect design data and assist in research work.

Compiled, processed and analyzed test data and results to improve product quality.

Completed projects by effectively applying engineering, technical and maintenance procedures.

Test Operations Tech, 11/2007 to 06/2010

The Boeing Company – Seattle, WA

Provide tech support for the sustaining avionics and flight controls test benches in the Airplane Systems

Laboratory.

Coordinate the test requirements with the customer/supplier.

Verifies that the test system is in the appropriate configuration to meet testing requirements and makes

necessary changes.

Assisted engineers with simulation bench/cab integration with other simulation systems, hydraulic

systems and installation/removal of LRU's.

Established physical, mechanical and scientific principles to analyze and resolve lab and test related

problems and anomalies.

Initiated contact with vendors and built solid working relationships with them.

Generated production graphs and analyzed production trends using BART 429 analyzer.

Followed up on manufacturing and field reports and resolved outstanding problems.

EDUCATION

Certification: Project Management, 2009

Villinova University - Online

GPA: CEET - ITT Tech, Honors - 2007

Project Management Training workshop

Principles of Operations Management training

Strategy and Problems in Management course

Associate of Arts: Computer Electronics and Engineering Technology, 2007

ITT Technical Institute - Seattle, WA

Top 10% of class - HONORS

Coursework in Computer Science and Engineering

Coursework in Information Technology and Computer Applications

Outstanding Achievement Award

Perfect Attendance Award

ADDITIONAL SKILLS

Adobe Acrobat, Photoshop, FireFox, Internet Explorer, MS Excel, MS Office, MS Outlook, MS PowerPoint,

MS Word, MS Visio, MS Project, Problem Solver, Quick Learner, Detail-Oriented Self-Starter, Team Player,

Time Management, Great Communication Skills



Contact this candidate