Abby Perkins Jr.
**********@*****.*** or *********@*****.***
Breaux Bridge, La. 70517
Education: Hopehaven Tech. School, New Orleans,, La.
Classification: Pipeline and Combo Welding Supervisor/ Structural Fabrication /Drydocking Barges
Certification: Pipe-60625 O.D. Pipe
Metal Spec.A106
Grade B to ASTM A106
Grade B
Certified in Water Survival, Rigging, Hydraulic jack, Asbestos, Confined Space, Defensive driving, Fall protection, Hazard communication, Hazmat 126, First response awareness lookout/Tagout affected, NORM awareness respiratory protection, and Tool safety, BBSI orientation, Atmosphere test, Benzene test,
Performs all testing of welder performance prior to commence of project. Oversees all xrays and weld procedures, oversees all specifications of job pertaining to ie, xrays, doping (slick or cement) all bevels. Certified with Flux Core, Heli Arc, Alum. Short Arc, and Mig Wire, and automatics.
Objective: Performance in the specifics of metallurgy. Provides definite technical advice and formats pertaining to job activities at hand. Discusses and presents outcome of project with team leaders. Suggesting alternative solutions where appropriate in the fabrication are construction whilst on project . Provides technical overview of working personnel where and when needed ie, including monitoring project process and contract client requirements. Understands designs, selection of metallic materials, welding procedures and qualifications.
I supervise the installation, repair and job performance on all welders. Test out all welders for project assignment. I plan, assign and set schedules for all welding crew. Train crew personnel on all safety and work procedures. Establishes safety and work performance standards. I supervise the work of multinational journeyman and helpers and enhance safety and top job performance. Able to communicate clearly and concisely orally and in writing. I have the professional skill in the use and care of tools and equipment used on work assignments. Well established and knowlegable of the properties of ferrous and non ferrous metals encountered in the welding task at hand. I prepare and establish material list, order supplies and equipment required for the project. Very knowlegable of the occupational hazards and I enforce safety precautions in the welding department. I maintain and effective working relationship with all personnel on board.
Employment:
2010 – 2015– O.P.I. International, Houston, Texas, Pipeline Welder Foreman/supt DLB 332- layed pipelines, installed jackets, risers, crossovers, tieins, Nigeria, West Africa
Projects : Afren Resources Nigeria Limited Dec 2010 ---March 2011
Installation of an 879 ton platform including 4 pile jacket, boat landing,
Risers, three deck sections and a helicopter deck. Installation of approximately 5000’ of four pipelines and one 4”, one 6” and two 8” and a power and data umbilical from a new platform toa future location of a MOPU in a 65 degree bend, side by side in 140 ‘ water depth,
Addax Petroleum Development March 2011--- July 2011
Installation of a Guide Template and the fabrication and driving of six 36” conductor pillings in the 30’ water depth. Fabrication and installation of a Guide Template and boat landing for TPU, riser support tripod platform. Fabrication and installation of a Guide Template and one 36” conductor piling for TPU monopod platform as well as the installation of the TPU deck and riser and subsea spool .
Shell Petroleum Development Company of Nigeria Limited Aug. 2011 March 2014
FYIP (Forcados Yokri Integrated Project) continuation of phse 1. Multiple scopes of work to relative to pipeline, hookup/commissioning, refurbishment and abandonment activities over a three season work period in the Forcados estuary in Nigeria.
Afren Energy Resources Limited March 2014 – April 2014
2, 4, pile platform installations CFBX and OKWOK in the EBOK and OKWOK fields respectively.
2005 – 2009 – Global Industries, Houston, Texas, Pipeline Welder Foreman, Worked Gulf of Mexico, LayBarge Cherokee, installed risers, pipelines, salvage jackets, platforms, conductor pipe
2005 – Worked Trinidad, Laybarge Cherokee, Layed pipelines
2006 – 2008 – West Africa, Nigeria, Ghana, Gabon, Angola, Luanda – Derrick Barge Comanche, Installed pipelines, pipeline crossings, risers, installed sbm bouies, sbm bouies to plims, including damage ends on bevels, egg shaped, scale and rust inside pipe, check all xrays and doping of pipe etc. In charge of 35-100 personnel, ie multi national. Projects performed and completed by Global Industries, for Chevron, Worked in Meji, Okan Meren Fields, Africa.
2008 – Vietnam, Derrick Barge Comanche – Layed pipelines and crossings.
2004 – 2005 – Offshore Specialities and Fabrication, Houma, Louisiana, Combo Welder Foreman, Salvage platforms and the installation of new platforms and jackets in the Gulf of Mexico
2003 – Huval Engineering, Lafayette, Louisiana – Structural Welder Foreman, Projects worked on, Sunshine Bridge, Donaldsonville, Louisiana, Louisa Bridge, Delcambre, Louisiana, Fresh Water Bayou Locks, Freshwater City, Louisiana. Main objection of these projects was to erect and reconstruct floor structure of bridges.
McDermott Dubai – Retired Pipeline Welder Foreman Foreign Operations 35 years.
Job Spec.
LPG Project, Saudi Arabia- Combo Welder Foreman and Structural Fabricator
Conoco Dubai- Pipeline Welder Foreman, Installation of pipelines, subsea platforms, risers, in Arabian Gulf.
Juayma Project – Pipeline Welder Foreman
Dugas Project – Combo Welder Foreman
Desalutation Plant – Doha, Saudi Arabia
Drydocking Experience – Drydocking, overseeing and orchestrating the fabrication and repair of offshore vessels.
Derrick Barge 9 – Mossogon Dock, Bombay, India
Derrick Barge 11 – Athens, Greece
Derrick Barge 7 – Soukna Yard, Egypt-, Supervised the removal and replacement of entire bow of barge.
Soukna, Egypt – Fabrication/ Structural Welder Foreman
Dahran, Saudi Arabia – Pipe Inspector 27 miles of 20” pipe and refacing of imprint machine
McDermott South East Asia, - Derrick Barge 20 – Pipeline Welder Foreman, Worked Indonesia
McDermott North Sea Division, - Aberdeen, Scotland.- Back Welder, Plaste Oil Co. installation of 52” pipelines and subsea tie ins.
McDermott Nigeria,- West Africa – Layed pipelines, layed floor lines in the bush, layed pipelines in Duwalla, South Africa
McDermott South America Division,- Trinidad- Insalled pipelines and jackets
Ingram – Welder, Structural and pipeline, tubescope pipe inspector