Career Profile:

+ 13 years involved in various upstream and downstream projects from onshore to offshore location. Projects includes such as High Rate Thickeners, LNG/LPG Tanks, Industry & Facilities (Crane Inspection & Certification, ISO Tank Inspection/Certification, Vendor Assessment, Shop Inspection), Fabrication of Platform Piping, Pipeline Assemblies (Pipe laying Barge, Spool base facility and Cross Country), Fabrication of various Pipe spool and Dry Container, Valve Testing, LNG Train (On Site and Off Site welding and piping works), Columns and Spherical Pressure Vessel (Fabrication and Erection). Knowledgeable in the application of ASME VIII & IX, ANSI B 31.3, API 1104, 620 & 650, AWS D1.1 and AS/NZS 1554.1

FROM TO POSITION COMPANY PROJECT COUNTRY

June 2014

Present

QAQC Inspector

Freelancing

Various

Philippines

Sept 2012

Dec. 2013

QAQC Inspector

Ventech Int’l Services Phils

KAR III – Process Columns

Philippines

May 2011

June 2012

Welding Inspector

Outotec - Australia

Taganito HPAL Project

Philippines

Oct. 09

Apr 2011

Welding Inspector

LYON Manut. Metal. SARL

ALNG Project

Angola

Sept. 08

Oct. 09

Industry Inspector

BUREAU VERITAS S.A. PHILIPPINES

Industry & Facility

Philippines

Mar 2007

May 2008

QC Inspector

Petromar S.A. Angola

FARM Project

Angola

Aug 2005

Dec 2006

Welding Inspector

BUREAU VERITAS Angola

TECHNIP Spool Base

Angola

Mar 2005

June 2005

Welding Inspector

Qatar Inspection Services

Maersk Oil Qatar Project

Qatar

July 2004

Oct 2004

Welding Inspector

Amec Spiecafag Petrofac JV

BTC Dual Line Pipeline

Georgia

Mar 2004

July 2004

Welding/Mechanical Inspector

Geotechnical Testing Center

Qatif Maintain Potential

K.S.A.

Aug 2001

Sept 2002

Welding/Piping Inspector

DOTANAH Engineering & Contracting SDN BHD

MNLNG TIGA Plant

Malaysia

Aug 1999

Nov 1999

Piping Supervisor

Al Yusr – Townsend & Bottum Company

Petrokemya Refinery - Shutdown

K.S.A.

Dec 1997

Dec 1998

Welding Inspector

Techint Cimi Montubi Nigeria LTD

NLNG Plant

Nigeria

Dec 1996

Dec 1997

Welding Inspector

Industrial Inspection (Intl) Inc.

PETRON Spherical Tank

Philippines

EDUCATIONAL, TRAINING AND SEMINARS ATTENDED:

B.S. Mechanical Engineer – Graduate 1994

De La Salle University – Araneta (Formerly Gregorio Araneta University Foundation)

CSWIP 3.1 Welding Inspector

Certificate No. 84064

Valid Thru: 12 January 2019

TWI Certification Ltd.

Radiographic Film Interpretation – Practitioner

ASNT - SNT - TC - 1A

Qatar Inspection Services

Radiographic Testing Level 2 – Seminar

ASNT - SNT - TC - 1A

Philippine Nuclear Research Institute

Ultrasonic Testing Level 2 – Seminar

ASNT – SNT – TC – 1A

Philippine Nuclear Research Institute

Magnetic Particle Testing Level 2 – Practitioner

ASNT - SNT - TC - 1A

Qatar Inspection Services

Liquid Dye Penetrant Testing Level 2 – Practitioner

ASNT - SNT - TC - 1A

Qatar Inspection Services

AutoCAD 2000 & 3D Studio Max 3 – Seminar

MICROCADD Technologies Company

EMPLOYMENT HISTORY

COMPANY : Freelancing

PROJECT : Various

POSITION : QAQC Inspector/Consultant/Evaluator

DATE : June, 2014 – Present

DUTIES AND RESPONSIBILITIES

EWPCI – Training Center Ponte St. Pasong Tamo Makati City

Conduct Welders Qualification Test and Welding Procedure Qualification Test as per ASME IX

Consultancy work for Training for Work Scholarship Program in Infanta and Gen. Nakar municipality of Quezon. TESDA courses are Carpentry NCII, RSB NCII and Mason NCII.

Interface with EWPCI and related government agencies for conducting the program.

Conduct evaluation for Welders, Pipe Fitter and Steel Fabricator.

Conduct training for steel fabricator, welder and pipefitter.

UMTC – United Marine Training Center Leon Guinto, Malate Manila

Conduct consultation work for the approval of their WPS as per EN ISO standard

Develop procedures and checklist for the conduction of Welding Procedure Actual Record

Witness the conduction of Non Destructive and Destructive testing.

ALL ‘BOUT PEOPLE INC. Gil Puyat Ave, Makati City

As On call - Technical Evaluator for Oil and Gas sector

Conduct preliminary interview and evaluation and endorse for trade test

BUREAU VERITAS PHIL. S.A. Malate, Manila

As on call Third Party Inspector for shop inspection industry

(PQR, WQT, NDT & Root Analysis).

Projects handled Chevron WQT @ MFI Pasig and Yamal WQT at AG&P.

3rd party witness for Function Test of tank washing machine for ship.

COMPANY : Ventech Engineers International, Pasadena Texas

Ventech International Services Philippines, Alabang Muntinlupa

PROJECT : KAR Phase 3 – 60,000 BPD Crude Unit w/ Naptha Train

Fabrication of Process Columns

POSITION : QAQC Inspector

Contractor – AG&P, Bauan Batangas Philippines

Contractor – MRY, Taiwan

DATE : Sept. 10, 2012 – December 20, 2013

DUTIES AND RESPONSIBILITIES

Conduct Vendor Assessment.

Review and approve all inspection reports and liaise with Authorize Inspector and conduct film interpretation.

Ensure that all work is performed by design and in accordance with the applicable standards, codes and Ventech Engineers Intl. Standards.

Cross check between Ventech and AG&P all drawings for correct revision level.

Approve Inspection and Test Plan as per witness point task completed.

Conduct final inspection prior to hydrotesting and witness all inspection points.

Generate technical/progress reports, highlight action/non conformance items.

Review and approve Manufacturer Data Book.

COMPANY : Outotec Pty. LTD, Australia

PROJECT : TAGANITO – HPAL Project Surigao, Philippines

POSITION : Welding Inspector (Vendor Inspector)

For Metaphil Fabrication Yard, Balamban Cebu

DATE : May 23, 2011 – June 1, 2012

DUTIES AND RESPONSIBILITIES

Review, check and familiarize all plans, specifications, contracts and other related documents. Recommend modifications, changes, revisions, alterations,

Conduct join inspection with Metaphil QC Inspector for Physical quantity, bolt hole orientation, dimension, deflection and welding inspection of High Rate Thickeners Bridges Assembly, Feed Assembly, Mechanism Assembly, Rake lift Assembly

Witness painting and coating inspection for structural plates, Bridge Assembly, Feed Assembly, Drive Assembly, Flocullant Piping and Shear Thinning Assembly

Witness Spark Testing for Rubber Lining assemblies

Witness trial fit assembly and dimension of Drive shaft to Rake arm, Feed well to Bridges &Transition Box

Witness and coordinate material delivery to barge and container.

COMPANY : Lyon Manut. Const. Metal. SARL

PROJECT : Angola LNG Project

POSITION : Welding Inspector (QC Coordinator)

DATE : October 14, 2009 – April 20, 2011

DUTIES AND RESPONSIBILITIES

Prepare QC reports, coordinate NDT inspection and submit Request for Inspection

Assign QC Inspector for different task and coordinate inspection with area inspector as per ITP

Conduct inspection on roof liner/rafter, roof nozzles, corner liner, roof raise, bottom plate, secondary & inner plate, inner shell (9% Nickel), insulation, internal piping, etc.

Coordinate and/or conduct PMI, WQT.

Prepare QC documents such as Welding & Material Traceability Record, Summary sheet, Consumable control, Daily Welding Inspection report.

Conduct QC tool box meeting to highlight qc concerns and improve quality works for welders.

Liaise with client regarding spot witness, hold point and handover inspection as per ITP.

Conduct evaluation for the staff (Safety Engineer and Inspector) and skilled workers (Welders, Welding Foreman/Supervisor, Fabricators, Electrician) in Singapore and Vietnam.

COMPANY : BUREAU VERITAS S.A. Philippines

PROJECT : Various Projects for Industry & Facilities Department

POSITION : Industry Inspector / Marketing Coordinator

DATE : September 09, 2008 – October 12, 2009

DUTIES AND RESPONSIBILITIES

Prepare and submit quotation proposal as per client requirements

Review documents and witness & certify statutory testing such as ISO Tank testing (5yr / 2.5 yr) Periodic Inspection and Crane & Lifting Gear Periodic Inspection.

Conduct Vendor Assessment (Tank Fabricator) Representing Velosi Australia

Third party Inspection for shop fabrication (WQT and PQR) Client includes AGIP KCO, Kentz KSA, HHI and Shell Brunei.

As Site Representative for Inspection and Assessment of Second Hand Equipment of Ventech Phils at Chevron Terminal Batangas for YPF Argentina.

Conduct Product Conformity Assessment, witness container loading and BV sealing for different commodity for export.

COMPANY : Petromar S. A. Angola

PROJECT : FARM Project – Chevron

POSITION : Welding/Piping/NDT Inspector

Main Contractor Representative

DATE : March 28, 2007 – May 12, 2008

DUTIES AND RESPONSIBILITIES

Attain all relevant documents such as isometric drawing, procedures, ITP and contracts.

Attend for Kick Off Meeting, QA/QC Meeting and Progress Meetings as may required

Review documents pertaining to QA/QC standards and procedures and comments as necessary.

Witness PQR, WQT, Bend Test and Hydro Test according to specified standards and specifications

Conduct visual and dimensional inspection with subcontractor QC inspector

Verify if WPS parameters are meet properly, heat control are checked by subcontractor QC, consumables are issued according to procedures

Interface with subcontractor QA/QC Manager, Inspector, Third Party and Chevron representatives

Review NDT films and reports, Material Traceability, Welding Report and Test Pack

Conduct Quality Meeting with sub-contractor; discuss inspection issues, progress and non conformance.

Coordinate with site representatives in releasing pipe spools for sandblasting and painting

Assigned as QA/QC Supervisor for 10 days to pipe laying barge CASTORO 2 for Mafumeirra Project – CABGOC Malongo, Angola.

COMPANY : Bureau Veritas, Angola

PROJECT : Sonangol – Technip Angoflex, Dande Spool Base

(TOTAL/BP Project)

POSITION : Welding/NDT Inspector

DATE : Aug 1, 2005 – Dec. 28, 2006

DUTIES AND RESPONSIBILITIES:

Front-End Welding Inspection (Mainline Welding-AGMAW/TIG)

Conduct front end inspection as per ITP:

a)fit-up inspection

b)preheat requirement

c)welding audit

d)verify the pipe no. with the Pipe Tracking System

e)Encode the welding production details into the system

f)Monitor the downtime

Field Inspection

Welding inspection on onshore tie-ins, repairs and re-weld

(TIG/FCAW)

Verify NDT carrying out and review RT films

Witness WQT, Pipeline pigging and gauging

Pipe in pipe insertion (1.5 KM)

Spooling of pipes to the ship

HDPE Plastic liner fusion

HDPE in pipe insertion

Others

TPI works for WPQT using Duplex/Superduplex pipe (Jumper)

COMPANY : Qatar Inspection Services

PROJECT : Madina Group W.L.L.

POSITION : Welding Inspector

DATE : March 12, 2005 – June 10, 2005

NOTE : Reference certificate - NDT Trainings

DUTIES AND RESPONSIBILITIES

Assigned as QA/QC Inspector for Madina Group W.L.L. at fabrication shop Salwa Industrial Area

Conduct material, visual, fit-up and dimensional inspection of various projects involving structural, piping, and vessel for onshore and offshore projects.

Schedule NDT as per QCP requirements, interpret films as per acceptance standards, and verify NDT reports as per approved procedures.

Coordinate painting inspection as per Madina Painting System with Client representatives, Supervisor and Inspector

Witness WQT, PQR, and Hydro testing with concurrence with clients.

Check and verify WPS and WQT against project requirements

Prepare and submit Quality Dossiers.

COMPANY : Amec Spiecafag Petrofac JV

PROJECT : BTC Dual Line Pipeline, Georgia

BRITISH PETROLEUM

POSITION : Welding Inspector

DATE : July 29, 2004 – October 18, 2004

DUTIES AND RESPONSIBILITIES

Work as back end welding inspector for the manual, automatic, tie-in section.

Conduct visual inspection as per API 11.04 Standard. Check and verify pre-heat and interpass temp.

Conduct time inspection on the issuance of electrodes.

Conduct welding audit as per WPS

Conduct inspection report.

COMPANY : Geotechnical Testing Center

Dammam, Juaymah K.S.A.

PROJECT : QATIF MAINTAIN POTENTIAL

Oil Production Flow lines

POSITION : Welding & Mechanical Inspector

DATE : March 6 – July 5, 2004

NOTE : Reference certificate – ARAMCO approval

DUTIES AND RESPONSIBILITIES

1 Welding Inspector – Fabrication Shop

Conduct visual and dimensional inspection on all fabricated spools and removable/plate/full-thrust anchor.

Ensure proper adherence to ITP, WPS and Saudi Aramco Standards.

Conduct DWR, schedule NDT as per requirement and witness WQT

Coordinate with Project Management Team regarding schedules, queries and priority works.

2Mechanical Inspector – Fabrication Shop

Conduct valve testing, hydro testing on pre-test spool and air-leak testing on different types of anchor

Schedule calibration test on pressure gage, relief valve and manifold as per procedure.

Ensure safety awareness while conducting pressure test

Raise Request for Information as to day to day basis for any witness and hold point inspection

Document and submit to Aramco Quality Project Inspection Services the pressure test report.

Provide information to PMT about priority and schedule.

COMPANY : Dotanah Engineering & Contr.

SDN.BHD. Bintulu, Sarawak Malaysia

PROJECT : MLNG TIGA PLANT (Train 7&8)

POSITION : QC Inspector – Welding/Piping

DATE : Aug. 11, 2001 up to Sept. 13, 2002

DUTIES AND RESPONSIBILITIES

1.Spool Releasing Inspector for the fabrication shop of Carbon Steel, Low-Impact Tested Carbon Steel and Stainless Steel

Conduct inspection in welding and piping (dimensional, mat’l specification, orientation, squareness, heat nos., identification and cleanliness) on all finished spools.

Spools, which are for rectify are properly commented on

Traceability Records and marked also on pipe.

Accepted spools are then verified on computer confirming the

welding dates and welders code, while attachments such as

air leak test report and orifice flanges dimensions reports

included.

Traceability Records are endorse to the main contractors

welding and piping inspectors for their inspection. Remarks or

comments are coordinated with shop engineers, supervisors

and foreman for repairs.

Accepted TR’S are documented and released for NDT.

Repairs of welding resulting from RT are checked again until RT accepted.

2.Pneumatic/Hydro Test and Orifice Flange Inspector

Conduct air leak test on all reinforcing pads, record and document.

Measure the orifice flange ID, verify the nipple orientation, record and document.

Witness hydro test for water line pipes prior for galvanizing and ensure test pack are in order.

3.Other works

Verifying heat nos. at the lay down area which does not conforms

on the computer master lists and submits a query to the main contractor.

Conduct spool verification if double fabricated and advice shop engineers for necessary action.

Conduct fit-up inspection and daily welding report verification.

Ensure the proper adherence to WPS, ITP, Project Specifications and standards and observe safety awareness.

COMPANY : Al -Yusr Townsend Bottom Co.

Jubail, K.S.A.

PROJECT : Petrokemya Petrochemicals Shutdown

POSITION : Piping Supervisor

DATE : Aug. 23 – Nov. 13, 1999

NOTE : Certificate not available

DUTIES AND RESPONSIBILITIES

Obtain, review and check tie-in plans, isometric drawing, P&ID and piping reference plan.

Mark and identify tie-in location, prepare materials and consumables to be use and arrange safety requirements through assigned safety officers.

Prepare and allocate manpower in all tie-in schedules.

Plan and execute the lying of random pipes that will be used in the tie-in works.

Supervise the execution of work in accordance with the procedure, provide safety measure and coordinate with Petrokemya supervisor and engineer.

Coordinate with welding supervisor and their foreman regarding welding works and QA/QC department about NDT requirements.

Raise query with engineering department regarding rerouting of pipes, spool orientation and other design and specification problem.

Prepare and submit tie-in report.

Conduct toolbox meeting.

COMPANY : Techint Cimi-Montubi Nigeria Ltd.

Bonny Island, River State Nigeria

PROJECT : Nigeria Liquefied Natural Gas Plant

POSITION : Welding Inspector

DATE : Dec. 22, 1997 up to Dec. 16, 1998

DUTIES AND RESPONSIBILITIES

1.Shop Inspector (CS, LTCS & SS)

Conduct fit-up and welding inspection on pipes before, during and after welding works.

Ensure the proper handling of pipes and free from contamination.

Ensure WPS are strictly meet and copies are visible within the shop area.

Conduct daily welding report, heat number verification and isometric number verification on pipes.

Schedule RT, PT, MT and PAMI as per line class and welder wise Ensure the RT repairs are properly executed, tag and identified and coordinate with NDT groups the location of the spools.

Issued tracers for RT repairs as per accepted procedure.

Attend regular and special meetings with regards to improve the quality of workmanship.

Advised assigned foreman about the repair rate of their welders and take necessary actions in improving of their workmanship.

2.Site Inspector (Off – Site Battery Limit)

Area of responsibility were slug catcher, condensate tank area, fire water area, LNG piping components and flare area.

Conduct fit-up and visual inspection and daily welding report.

Schedule NDT requirements as per line class and welder wise.

Ensure RT repairs are done properly and tracers were issued

Verify the pre-test package for welding completion, welders ID and NDT requirements.

Review the DWR submitted by other inspectors for any discrepancy in the absence of Inspectors Supervisor.

Coordinate any remarks made by main contractor inspectors with site supervisors and foreman for rectification.

Raise query with engineering department regarding revisions, tolerances and details.

COMPANY : Industrial Inspection (Int’l) Inc.

Pasong Tamo Makati City, Phil.

POSITION : THIRD PARTY INSPECTOR

DATE : Sept. 15, 1997 up to Dec. 15, 1997

PROJECT : Erection of 2 units 4Mb Spherical Tank

CLIENT : PETRON CORPORATION

MAIN CONTR. : A de Vera Engineering Corp.

Petron Bulk Plant, Poro Point San Fernando La Union

DUTIES AND RESPONSIBILITIES

1.Site Welding Inspector – Pressure Vessel

Attain, review and evaluate all project drawings and plans, QA/QC

procedure, work schedules, list of qualified welders, WPS, PQR and other pertinent document.

Verify all delivered dished plates and columns from fabrication shop at Valenzuela Metro Manila duly authorized by shop inspector from both parties.

Witness the erection and advise necessary action if not conforming to approve erection procedure.

Ensure the fit-up are properly tacked, welders code is stamped adjacent to the joints, preheating and interpass temperature are done in accordance with the approved WPS.

Verify the scheduling of RT, its identification & location and review results for final acceptance.

Advise main contractor to conduct MT for surface detection were

weld spatters are removed by grinding works.

Submit bimonthly project progress report to the Petron Corp.

Witness Post Weld Heat Treatment/Hydro Test, verify data and submit the recorded data.

Conduct and attend regular/special meetings with different contractors

regarding progress, non-conformance and safety procedures.

Witness the Brinnel Hardness Test after the completion of PWHT,

sandblasting and painting of the pressure vessel.

Attain and verify all necessary documents for the commissioning of the pressure vessels.

COMPANY : Industrial Inspection (Int’l) Inc.

Pasong Tamo Makati City, Phil.

POSITION : THIRD PARTY INSPECTOR

DATE : Dec. 9, 1996 up to Sept. 10, 1997

PROJECT : Fabrication of 2units 20 MB &

4 units 4MB Spherical Tank

CLIENT : PETRON CORPORATION

MAIN CONTR. : A de Vera Engineering Corp Valenzuela Metro Manila

DUTIES AND RESPONSIBILITIES

1. Shop Welding/Mechanical Inspector

Check purchased materials and consumables with compliance to the standards and codes.

Review, check and familiarize all plans, specifications, contracts, procedures and other pertinent documents and obtain these for documentation.

Investigate base metal imperfection and deviations and advise NDE, evaluate results according to ASME IX and VIII.

Integrate and coordinate all the activities of various contractors to the designer and owner.

Witness dimensional and conduct visual inspection on all welded joints, fit-up preparations and support details.

Conduct Welders Qualification Test (WQT) and witness procedure qualification based on the contractors Welding Procedure Specifications (WPS).

Witness and/or verify NDT done by Main Contractor/Subcontractor, evaluate them and interpret results for final acceptance.

Monitor and record welders’ performance with its repair rate and issue non-conformance report or stoppage of welder from doing welding works.

Ensure that the approved welding procedure specifications are meet such, as electrodes are inside the quiver, preheating when require and interpass temperatures are meet.

Ensure that the dish plates’ arc, segments and bevel meet the required design with the accepted tolerance.

Prepare semi-monthly report to the owner for the status, acceptance, and evaluation progress and work chart.

Personal Details:

Nickname : Argie

Age : 46 yrs old

Date of Birth : 2nd of August 1970

Place of Birth : Valenzuela Bulacan, Philippines

Civil Status : Married

Nationality : Filipino

Height : 5 ' 9" (1.75 meter)

Weight : 88 kilos

Religion : Roman Catholic

Home Address : Purok Ilang - Ilang Barangay Batican, Infanta Quezon Philippines 4336

City Address : 379 Dama De Noche St. Reparo Baesa Caloocan City, Philippines 1401



Contact this candidate