Post Job Free
Sign in

Engineer Electrical

Location:
Broken Arrow, OK
Posted:
August 05, 2016

Contact this candidate

Resume:

Profile:

Self-motivated electrical engineer with over 14 years of experience coordinating and actively participating in multiple projects simultaneously. Thrives in a fast-paced environment. Extensive expertise in troubleshooting both product and process issues. Highly skilled in reading and modifying BOMs, product drawings, process plans, and test plans all while maintaining engineering intent and using an ECM process. Proven track record leading integration of systems involving hardware, software, electrical, and mechanical disciplines.

Summary of Qualifications:

Problem solver who takes responsibility for actions

Active with Lean Six Sigma Techniques

Leader who motivates others

Goal-oriented and strong time management skills

Excellent presentation skills

Adept with Microsoft Office Suite

Programing languages used Assembly, C, C++, Basic, SQL, and HTML

Professional Experience:

Enovation Controls (formerly FW Murphy) Tulsa, OK 5/2002-Present

Sustaining Engineer / Third Party Coordinator

Investigate and troubleshoot product issues including high infant mortality rates, poor throughput yield, application specific issues and component obsolescence

Investigate and troubleshoot process issues including poor throughput yield, special cause failures and production equipment inconsistencies

Create procedures and processes to efficiently obtain and maintain Third Party Certificates

Determine requirements to obtain Certifications

Became familiar with ATEX, CSA, UL, ABS, NACE, NEC, IECEX, and CE directives

Develop the proper infrastructure to declare and maintain Self Certifications

Work with multiple certifying agencies to obtain Third Party Certifications

Led both new and existing products through the specific required standards with minimal impact to timeline and budget

Key Accomplishments

Managed taking an existing low cost display with only minor modifications to be ATEX certified

Managed a team of 4 engineers and technicians

Project Budget: $120,000, Estimated initial 3 year profit $1,200,000

Learned new directives and standards

Used Six Sigma techniques to develop creative solutions to meet standards’ requirements, budget, and timeline

Led a team to ATEX certify an Oil Level Maintainer that was in development

Led a team of 2 engineers and a technician

Only minor modifications and no disruption to the existing schedule

Systems Engineer

Led the technical side for all Oil & Gas products

Used Six Sigma techniques to determine best resolutions for design issues

Directed design validation plan and testing

Coordinated between Marketing needs and Engineering’s capability, time line, and budget

Key Accomplishments

Managed an Oil & Gas controller/annunciator redesign

Managed a team of 7 engineers and technicians

Project Budget: $460,000, Estimated initial 3 year profit $5,400,000

Designed Access web page to catalog type and quantity of failures

Worked with customers to determine their perceptions of product's short comings

Responsible for determining root cause

Managed an Oil & Gas controller redesign for obsolescence and Marketing refocus

Managed a team of 9 engineers and technicians

Project Budget: $800,000, Estimated initial 3 year profit $4,800,000

Developed cohesion between feuding critical teams

Managed the creation and implementation of the plan to test the dynamic controller, display, two expansion boards and the windows based configurator

Sustaining Electrical Engineer

Developed unit tests for PCB and Oil & Gas products

Maintained manufacturability of multiple product lines

Investigated and solved customer problems

Identified failure trends in products

Designed test fixtures

Developed panel tests

Designed the standardized panel line

Key Accomplishment

Managed PC104 board PLC competitor redesign

Managed a team of 5 engineers and technicians

Estimated protected profits of over $8,000,000 per year

Led troubleshooting and root cause analysis

Determined resolution for non-volatile memory loss and loss of data logging capabilities

Determined proper testing to verify resolution

WorldCom Tulsa, OK

Implementation Engineer, 5/2001- 4/2002

Evaluated project requests from upstream groups

Ordered all project materials

Issued detailed installation specifications

Updated the engineering database

Part of the EDP (Engineering Development Program)

Bentley Nevada Corporation, Minden, NV

Electrical Engineering Intern, Summer 2000

Designed Circuits

Performed Trouble Shooting

Developed end of line tester

Certifications:

Lean Six Sigma Greenbelt

Education:

University of Tulsa, Mini MBA Program Graduate

Tulsa, OK

University of Nebraska-Lincoln, Graduation May 2001

Bachelor’s Degree - Electrical Engineering



Contact this candidate