A qualified Mechanical Engineer with over 3 years of experience in Power plant Mechanical Maintenances
Good experience in Power plant Hot insulation works ( Insulation & cladding)
Hands-on experience of planning the maintenance activities and achieve the targets
Good communication skills and problem solving abilities
Have some experience in Quality control works
Good Leadership Qualities and Management capabilities
Also Good exposure in Office Admin work & warehouse management
JOB EXPOSURES
Previous Organization 1:
Company Name : TEXMO INDUSTRIES, Coimbatore, Tamilnadu
Designation : Engineer Trainee
Department : Production
Working Period : 6 months
Previous Organization 2:
Company Name : PONNI SUGARS ( ERODE) LIMITED, odappalli, Namakkal ( D.T), Tamilnadu
Designation : Engineer Trainee
Role : DCS Operator
Department : Operation and Maintenance
Working Period : From 03.12.2012 to 20.09.2014
Plant Details:
The unit comprises of the following plant,
Working in the ABB 800 XA DCS System in the 19-MW Co-Generation plant
95 Tons/Hour Boiler at 112 ata pressure of CETHAR VESSELS make
19 MW Steam Turbine of SIEMENS make
20 m /hr Reverse Osmosis Plant
MAINTENANCES IN POWER PLANT
Handling Belt Conveyors ( Bagasse conveyor & Coal conveyor ) Assemble & Deassemble work
Handling Return Bagasse Conveyor Erection work
Soot Blowers ( LRSB & MRSB) Pipes Assemble & Deassemble work
Handling Hydraulic test in Boiler
Handling Furnace ( Travelling grate) Maintenance work
FD Fan ( Forced Draught), ID Fan ( Induced Draught) Alignment work
Dry ash Silo Maintenance work ( Bag Filter cleaning & Replacement )
Wet ash silo Maintenance work ( Ash cleaning )
Handling Superheater coils scale & sludge cleaning work & check coil thickness
Economiser tubes Maintenance work ( Tube cleaning work)
Evoporator tubes Maintenance work ( Tube cleaning work)
Air Preheater tubes Maintenance work ( Tube cleaning work)
Handling ESP ( Electro Static Precipitator) cleaning work
Handling Deaerator tank, Blowdown tank Maintenance work
Handling Steam drum Safety valves, Water level indicator
To maintain the 5S principles throughout the organization
Current Organization :
Project 1:
Company Name : LAPTRONICS SDN.BHD, Negeri Sembilan, Malaysia
Client Name : SHIN EVERSENDAI ENGINEERING SDN.BHD
Project Owner : MALAKOFF ENGINEERING
Designation : Site Incharge
Department : Insulation & Cladding
Working Period : From 29.10.2014 to 22.01.2016
Job Profile
Doing as a Site Incharge for Insulation & Cladding works in 1000 MW coal fired power plant
Which is placed in Tanjung Bin 4, Johor, Malaysia
Have good exposures in Insulation & Cladding jobs especially for
1.Turbine Piping & Equipments
2.Auxiliary Boilers
3.Flue Gas Desulphurisation Plant ( FGD)
4.Fabric Filter
Conduct Tool Box briefing for workers daily
Also acted as a Quality Controller for Turbine Insulation jobs
Achieving the targets set by client on time
Preparation of all Documents such as Progress report, costing report, QC Inspection report & submit to client
Establish standard job procedures to train the workers & ensure safe working practices
Handling Client’s complaints & make client satisfaction
Analyze the Rejection / Rework complaint from client & take corrective action to reduce the rejection
Project 2:
Company Name : LAPTRONICS SDN.BHD, Negeri Sembilan, Malaysia
Client Name : MALAYSIA MARINE AND HEAVY ENGINEERING SDN.BHD
Project Owner : PETRONAS
Designation : Project Incharge
Department : Scaffolding
Working Period : From 28.01.2016 to Till Date
Job Profile
Doing as a Project Incharge for scaffolding activities in MMHE ( Ship yard)
Maintaining the Warehouse Management
Also Doing as a Office Admin
Doing Drawing Feasibility study, Documents preparation & submit to Client
Conduct Tool box briefing for workers daily
Attend Management review meeting with Top Management & monitoring the results
Reporting to Top Management regarding Project Progress on monthly basis
PROJECT HANDLED IN MY U.G
Project Name : Design and Fabrication of Domestic wet grinder
Description : This is the most suitable method for grinding maximum amount of rice & white pulses as
Well as to reduce time consumption ( 10kg/hr) & power consumption.
ACADEMIC DETAILS
DEGREE
Course : B.E. Mechanical Engineering
Institution : M.Kumarasamy college of Engineering, karur ( Anna University, Coimbatore)
Percentage : 93%
Duration : 2007-2011
H.S.C
School : Shri Aanjaneyaa Higher secondary school, Namakkal
Percentage : 86.25%
Duration : 2006-2007
S.S.L.C
School : Municipal High school ( Fort), Namakkal
Percentage : 95.40%
Duration : 2004-2005
INDUSTRIAL EXPOSURE
Undergone 7 days In-Plant training at VST( Tata Motors), Namakkal, Tamilnadu
AWARDS AND ACHIEVEMENTS
Secured University 24th rank in my under graduation
Secured University Second rank in V semester
Secured Third Rank in VII semester
Secured First class with distinction in HSE public Examination
Secured District third rank in SSLC among the Government schools, Namakkal
Won more prizes for my academic performances
COMPUTER SKILLS
MS Word
MS Excel
MS Power Point
PERSONAL DETAILS
Father’s Name : Mr.K.Mohan
Mother’s name : Mrs. M.Santha
Date of Birth : 02/02/1990
Marital status : Single
Nationality : Indian
Languages known : Tamil, English, Malayalam, Hindi & Malay
Permanent Address : 5/3 D, karupanar kovil street,
Kuppampalayam road, Bodupatty ( p.o),
Namakkal (D.T) – 637003,
Tamilnadu, India
DECLARATION
I hereby declare that the above details are true to the best of my knowledge and belief.
Place : M.KIRUBASH
Date :