R E S U M E
Personal Information
Education Background & Professional Training
No
Certificate Date
Professional Training
1
2
3
4
5
6
7
September 20, 2002
June 6, 2009
June 2, 2010
September 25, 2011
November 22, 2011
January 4, 2013
August 3, 2016
Degree of Information Management and Computer at YPTN-AMIK BATAM
Coating Inspector Indonesian corrosion Level-1 Conducted by an INDOCOR’S Authorized Training Body for research and development of corrosion and material product. Held in Bandung on June 1st – 6thth, 2009
Certificate no: 027/IC.I/I-65/VI/2009
Coating Inspector Indonesian corrosions Level-2 Conducted by an INDOCOR’S Authorized Training Body for research and development of corrosion and material product. Held in Bandung on May 31st – 2nd June 2010
Certificate no: 015/IC.II/16/V/2010
ASNT-SNT-TC-1A (2006), NDT UT Level-2 Conducted by Annamalai Institute of NDT Batam.
Certificate no: UT003/09/11
ASNT-SNT-TC-1A (2006), NDT MT/PT Level-2 Conducted by Annamalai Institute of NDT Batam.
Certificate no: MT04/11/11, PT004/11/11
T-BOSIET Training at PT. Indika Jaya Pratama, Balikpapan
CSWIP WI 3.0, Certificate No 110602, Exp. Date : 02 Aug 2021
Working Experiences
No
Company Name
Position
Project Name
1
PT REKAYASA INDUSTRI
Pipeline QC Coating, Painting, Insulation, Welding Inspector
Pertamina EP, Donggi - Senoro. Proyek Pengembangan Gas Matindok
Period
12 Dec 2013 – 30 June 2016
Job Description
Visual Inspection incoming bare pipe, Witness and monitoring on Inspection of surface preparation Blasting, Coating, Painting and Insulation (check abrasive, surface profile, environmental and Perform test such as Blother Test, Relative Humidity (RH), Dry Film Thickness (DFT), Salt Testing and Holiday test. Material Inspection Report and Traceability Records, Final Inspection.
Reason for leaving
End of Project
2
TOTAL EP & P Balikpapan on behalf of PT Radiant Utama Interinsco Tbk
NDT Phased Eddy Current Inspector
Maintenance of T970 Tank, Dia. 77Mtr
Period
20 August – 7 Sept 2013
Job Description
Visual Inspection of Coated welded joints, Inspection Welding Joint Annular to Shell of Tank with Phasec3 Tester. Analyses defect and reporting.
Reason for leaving
End of Project
3
PT Inwha Indonesia
QC Painting
Banyu Urip Project, EPC1
Period
28 March – 28 July 2013
Job Description
Visual Inspection of welded joints, Witness and monitoring on Inspection of surface preparation Blasting and Painting (check abrasive, surface profile, environmental and Perform test such as Relative Humidity (RH), Dry Film Thickness (DFT), Wet Film Thickness(WFT), Salt Testing and Holiday test, Material Inspection Report and Traceability Records, Final Inspection of Structural Assembly.
Reason for leaving
End of Contract
4
TOTAL EP & P Balikpapan on behalf of PT Radiant Utama Interinsco Tbk
NDT Phased Eddy Current Inspector
Maintenance of T1090 Tank, Dia. 77Mtr
Period
12 March – 26 March 2013
Job Description
Visual Inspection of Coated welded joints, Inspection Welding Joint Annular to Shell of Tank with Phasec3 Tester. Analyses defect and reporting.
Reason for leaving
End of Project
5
TUV on behalf of Thailand Nippon Steel
Coating/Painting Inspector
SALAMANDER ENERGY (BUALUANG) LIMITED, Process & Utility Modules BLPMB, Hydro Cyclone System
Period
4 February – 5 March 2013
Job Description
Visual Inspection of welded joints, Witness and monitoring on Inspection of surface preparation Blasting and Painting, Final Inspection of Structural Assembly.
Reason for leaving
Finished Project
6
PT PROFAB
QC Painting Inspector
OSX 3 FPSO, JN1026
Period
October 2012 – January 2013
Job Description
Visual Inspection of welded joints, Witness and monitoring on Inspection of surface preparation Blasting and Painting (check abrasive, surface profile, environmental and Perform test such as Relative Humidity (RH), Dry Film Thickness (DFT), Wet Film Thickness(WFT), Salt Testing and Holiday test, Material Inspection Report and Traceability Records, Final Inspection of Structural Assembly.
Reason of Leaving
Finished Project
7
PT. WASCO ENGINEERING on Behalf of PT Radiant Utama Interinsco, tbk
NDT MT/PT/UT Inspector
OSX 3 FPSO E-House, GLNG, D1 and CENDOR
Period
January – October 2012
Job Description
Prepare inspection procedure and inspection report forms, Responsible for technical data review, NDT Inspection as per clients spec, Report of Inspection.
Reason of Leaving
Finished Project
8
PT. McCONNEL DOWELL on Behalf of PT Radiant Utama Interinsco, tbk
NDT MT/PT/UT Inspector
TONKOLILI STAGE
Period
September – December 2011
Job Description
Prepare inspection procedure and inspection report forms, Responsible for technical data review, NDT Inspection as per clients spec, Report of Inspection.
Reason of Leaving
Finished Project
9
PT. Ho Wah Genting
Electrical Asst. Engineer
Wire and Cable Manufacturer
Period
August 2009 – September 2011
Job Description
Prepare Machine Operation/Repair/Maintenance/Modification Procedure, Responsible for technical data review, Product Inspection as per clients spec, Reporting.
Reason of Leaving
End of Contract
10
PT. Matsushita Kotobuki Peripheral Indonesia
Senior Technician
Harddisk Drive Manufacturer
Period
July 1994 – July 2009
Job Description
Prepare Machine Operation/Repair/Maintenance/Modification Procedure, Responsible for technical data review, Product Inspection, Reporting.
Reason of Leaving
Resigned