AWS CWI (Certified Weld Inspector) Certificate Number – 06100621 expires 2018,

Senior Lead Source Inspection / Turnover package Document Review Supervision,

Radiation Safety Officer for 5 years,

Level II X-Ray technician for 15 years,

Level II certifications in dye penetrant, Magnetic Particle and Level I thickness reading,

Strong working knowledge of various codes including but not limited to API 1104, B31.3,B31.1 ASME section VIII, D1.1 andD1.1,

Level I, II, IIl VT Nuclear Inspector,

Certified welder on storage tanks,

Worked as a rig welder for seven years.

Professional History:

Permanent Position

CB&I / Shaw Power Senior Lead Source Inspection / Document Review

July 2010 to Present

Perform CQR (Client Quality Representative) over sight duties,

Supervise 20 plus Level II Source Inspectors / QC Inspectors / Document Reviewers,

Schedule turnover packages to reviewers for review, attend daily meetings,

Perform Source Inspection Document Review of AP1000 Turnover packages documentation in accordance with customer contracts, purchase orders, documented procedures, industry practices, codes / standards and NQA-1,

Perform other supervision duties as applicable,

Performed Daily inspections on the shop floor of fit tack and welding operations.

Permanent Position

WPS Industries Group

April 2010 to July 2010 QA/QC Manager

Daily inspection of welding and fit up of parts,

Ensure proper wire is in use along with proper welding procedures are in place and in use.

Contract Assignment

Gulf Engineering

March 2010 to April 2010 (End of Contract) CWI Inspection

Performed inspections for turnaround project,

Performed vendor surveillances.

Contract Assignment

A-Tex Manufacturing

January 2010 to March 2010 (End of Contract) CWI Inspection

Performed inspections on tanks and skids,

Performed vendor surveillances.

Contract Assignment

LMT / PCI

February 2008 to December 2009 (End of Contract) CWI QA/QA Inspection

Project Locations: Vogtle Nuclear Plant, Cooper Nuclear Plant, Conoco Phillips, Georgia, Nebraska, California

Issue welding wire/ rods per WPS and weld traveler Verify line and weld numbers,

Check fit up, tacks and root pass and final weld cap,

Performed Sign off on hold points and prepare NDE request.

Contract Assignment

Washington Group / URS / AECOM

September 2007 to February 2008 (End of Contract CWI Inspection

Project Location: Eunice, New Mexico

Performed VT Level ll, P.T. Level ll, M.T. Level ll Inspector on new build Uranium Enrichment facility.

Contract Assignment

Burns & McDonnell

May 2007 to September 2007 (End of Contract) CWI QA/QC Manager

Project Location: St. Mary’s Kansas

Performed repairs on air handling system and new build tanks at coal fired plant.

Contract Assignment

Purity Systems, Inc

March 2007 to May 2007 (End of Contract) CWI Inspection

Project Location: Vacaville, California

Performed Visual Weld Inspections on piping systems to verify compliance with design,

Performed P&ID Walk-downs.

Contract Assignment

Mistras Group Inc. / Conam

February 2007 to March 2007 (End of Contract) CWI Inspection

Projection Location: PP&L Susquehanna Nuclear Power Plant Berwick PA

Performed VT Level I, Level II, and Level III Inspection in accordance with ANSI/ASME Sec. N45.2.6 & ASME Sec. XI & NQA 1-2004 on pipe welds as well as structural welds,

Performed Level II PT Level II and MT Level II in accordance with Conam Procedure 99 CNTP-006 and CP-189 on pipe welds as well as structural welds.

Contract Assignment

Johnson Machine Works / Team Industrials

November 2006 to January 2007 (End of Contract) CWI Inspection

Project Location: Chariton, Iowa

Performed Inspection of welds on beam girders in accordance to D1.1 structural codes section 4 and section 6.

Contract Assignment

Wolf Creek Nuclear Operating Corporation

October 2006 to November 2006 (End of Contract) CWI Inspection

Project Location: Burlington, Kansas

Performed VT Level II, MT/PT Level II Inspections.

Contract Assignment

Gonzales Industrial X-Ray / Mistras Group

August 2006 to October 2006 (End of Contract) CWI Inspection

Project Location: Prairieville, LA

Working part time when needed, performing dye penetrant, and magnetic particle and RT inspection as a level II,

Performed visual inspection as a CWI inspector.

Contract Assignment

Global Santa Fe Corporation

January 2005 to August 2006 (End of Contract) Certified ABS Maintenance Welder

Project Location: Houston, TX

Responsible for all aspects of welding and repair of a wide range of machines,

Planned and implemented alterations to ensure safety, to improve operator ergonomics, and to increase machine productivity.

Permanent Position

Transocean Todco

December 2000 to January 2005 (End of Contract) Maintenance Welder

Performed various welding projects,

Responsible for all aspects of welding and repairs rig wide,

Performed continuous upgrades to Rig Specifications.

Permanent Position

Ionics Inc.

November 1997 to October 1999 Maintenance Welder

Project Location: Watertown, MA

Handled the fabrication of equipment modifications to upgrade systems,

Responsible for all aspects of welding and repair of a wide range of machines.

Permanent Position

Gonzales Industrial X-Ray

May 1992 to September 1997 X-Ray / MT / PT Technician

Project Location: Prairieville, LA

Performed inspection services in boilers and various piping jobs,

Worked in vessel shops and in chemical plants,

Performed visual inspection. Level II dye penetrant, and magnetic particle inspection,

Level II state licensed radiographer.