LOVENRI SOADUON MANURUNG
Address: Puri Buana Indah Blok K No.16 Rt 006/022
Kelurahan buliang
Kecamatan Batu Aji-Batam Indonesia
Date of Birth : April 14ͭ ͪ, 1982
Nationality : Indonesia
Marital status : Married
Sex : Male
Mobile Phone : (62) – 813-**-***-*** / (62) – 813-**-***-***
E-mail : acuoya@r.postjobfree.com
Skype : lovenri.manurung
OPTION OF APPLICATION
QC/Inspector Electric&Instrument
Foreman Electric&Instrument
Senior / Technician Electric&Instrument
Travel of Document
Number of Certificated
Place / Institution
Date of Issue
Date of Expiry
Passport
A 9275105
Batam, Indonesia
31/10/2014
31/10/2019
Seaman Book
C 082759
Batam, Indonesia
18/11/2014
17/11/2019
Complement of Certificated
Number of Certificated
Place / Institution
Date of Issue
Date of Expiry
Basic Offshore Safety Induction&Emergency Training_BOSIET And Travel Safety by Boat_TSbB
131157072310140182
BSTC TRAINING
Batam, Indonesia
21/10/2014
22/10/2018
Electric&Instrument Inspector
368/Ins.-XXII/III/2014
IKBAL-M-YOS
Batam, Indonesia
29/02/2014
No Limit
Basic Safety Training_BST
0196/EBK-LAT/IX/2013
PT.Exaudi Bina Karya
Batam, Indonesia
01/10/2014
No Limit
Diploma III Electro_D III Electro_Electrical Engineering
175/K/PL29/IX/ 2013
Politeknik Negeri Batam, Indonesia
19/09/2013
No Limit
Basic Safety Training_BST
6211435870010113
STIP Jakarta, Indonesia
15/03/2013
15/03/2018
Cables Glands Awareness Course
CMP PRODUCT
Mc Dermott, Batam Indonesia
29/06/2006
No Limit
3 Days Management Orientation
HR-04838/IV/03
Mc Dermott, Batam Indonesia
30/04/2003
No Limit
SUMMARY OF EXPERIENCES
I have over 13 years of extensive working experiences in the electric & instrument process, in various practices on quality control new fabrication, construction, installation (erection), mechanical completions, pre- commissioning and maintenance of Oil and Gas platform onshore and offshore. Front End Engineering Design (FEED); Project document: procedure, project specification, vendor document, project drawing, testing&inspection document, QA/QC document and dossier (DAC, hand over certificate). Witness current injection test for transformer, MCC, Switchgear and Witness Battery Charge Test. Knowledge in to evaluate Factory Acceptance Test. Inspection of electrical installation switchgear and MCC, transformers, UPS systems & motors. Inspect on lighting, instrument; pressure, temperature, level, flow, Fire and Gas detectors.I did fabrication, installation support and equipments all types on platforms. Having worked my way from a surface defects and discontinuities from welding for fabrication and installation electric&instrument support on platform. I am experience in offshore to finishing project all equipments in electric&instrument process for revision and additional of modern electric system, such as instrument, fire protection and Gas system, Valve control panel and power control (LV,MV and HV). I am capable of ensuring that call client’s specification, QC Procedures, and International code and standards are complied with as well as maintaining a high standard of safety. I have always considered myself to have a good relationship with the client and my managers. I am hard working and I follow company safety policies and procedures and I also lead a good example to those people working under me. Safety is always my first thought.
EDUCATIONAL BACKGROUND & QUALIFICATION
- Politeknik Negeri Batam " Electrical Engineering / Electric Installation"
(Batam, Riau Islands Indonesian) 2010 ~ 2013
- Senior High School (P. Siantar, North Sumatera Indonesian) 1997 ~ 2000
Language Skills
Indonesia : Mother tongue
English : English Practice and more applicable
SCOPES OF SPECIALIST TRAINING
Quality Awarness (QSHE).
ISO 9000 Quality management and quality assurance standards – guidelines for selection and use
ISO 9001;2008 Quality systems.. Model for quality assurance in design, development, production, installation and servicing
Profile Measurement, Document Package and Project Drawing.
Code and Standard International (ISA, IEC, NEC, IES, BS, ABS, API, NEMA, ASME)
Valve Control and Power Control (LV,MV and HV)
Inspection and Quality Control
Equipment System Platform and Barge Troubleshooting
Discontinuities Degradation, Welding defects and remedies
Test Functional and Calibration Instrument
Electric & Instrument Inspector job and responsibilities
Destructive Test (Hydrotest and Pneumatic Test)
Safety in Electric Operation.
Electric Compatibility and PPE
Inspection Test Plan (ITP) & Quality Plan
Hydraulic and Pneumatic System
HVAC, PAGA, Fire and gas
Structure and Fabrication
Onshore and Offshore Construction and Marine Crew
Summary Of Experience in Vessel Sea Of Offshore
Vessel
Company
Type of Vessel
DWT / GRT
Type of Engines
BHP
Rank
Sign on Date
Sign off Date
Songa Venus Majuro
Connect Energy Service
Semi Submersible Rig
12088 GRT
MAN CAT 3512
4xEMD 16-645 E8
Electric
19/01/2015
02/04/2015
MV. Tiare Moana
Neptune Pacific Agency Australia
Shipping
3972 GRT
MAN B&W
3360 KW
Electric
05/11/2015
29/02/2016
WORK EXPERIENCES
Period : Nov 2015 ~ February 2016
Company : Neptune Pacific Agency Australia Pty. Ltd.
Project : MV. Tiare Moana IMO NO 8912871 Portsmouth
Designation : Electrician
Location : Auckland City New Zealand
Job Description :
Vessel & Alarm Management System (VMS); ballast control system, tank gauging system, anchor line monitoring system, fire fighting monitoring, emergency shutdown system, bilge alarm system
Power Management System (PMS); Diesel engines monitoring and control, generator control, Synchronization and load sharing, control of switchboard power distribution circuit breakers, Power reservation program: Automatic starting of the standby generator, blackout recovery, alarming and advisory messaging
Tank Gauging; Level indication and alarm of all monitor tanks, potable water sea water and fresh water, fuel oil and lube oil
Distributed Control System (DCS); Fire and gas detection, Co2 detection, HVAC/ dampers monitoring, fire fighting, sewage collection/ treatment
Period : May 2015 ~ October 2015
Client/End Use : Yamgaz
Project : Yamal LNG Project
Designation : Lead QC Inspector Electric & Instrument
Fabricating in : PT. Siemens, Batam Fabrication Yard Indonesia
Company : Bintan Marine Technology
Job Description :
Strong knowledge in Electrical Inspection : Vendor package / incoming, preservation, Hazardous area, Mechanical Completion, RFI (Record For Inspection)
Strong knowledge in system completion: Mechanical Completion, Pre Commissioning, Commissioning, start up
Having knowledge with technical drawing: AFC, IFC, Technical drawing technology, calibration & function test instrument
Prepare FEED / Project document, procedure, project specification, vendor document, drawing, testing and inspection document, QA/QC document and dossier (DAC and hand over certificate)
Inspection and observation material, equipment (preventive action) followed procedure,specification and code, standard project
Fix and problem solve in the site (corrective action) and meeting requirement
Observation process and implementation fabrication, assembly, installation, witness, testing, inspection and controlling product according standard, codes, rules and approval design drawing
Implementate process Factory Acceptance Test (FAT) and Site Accaptance Test (SAT) in manufacturing and site
Witness quality in the site / Inspection Test Record (ITR) and prepare E&I documents including of: code and standard international, P&ID
Witnees and inspection quality in the site and prepare form Punch List in site for construction
Period : March 2015 ~ April 2015
Company : Connect Energy Service
( Songa Venus Majuro) SemiSubmersible Rig
Project Site : Keppel Fells Shipyard Singapore
Designation : Electrician
Job Description :
Electrical maintenance in a limited time, troubleshooting and fault finding
Basic Knowledge in winch operation
Monitoring the functioning of the electrical equipments and electric motor
Assisting Chief electrician for maintenance NCR, Engine Room and Control Room
Period : May 2014 ~ October 2014
Client/End Use : Petronas Carigali
Project : Kepodang Gas Development Project
Client/End Use : INPEX Ichtys
Project : INPEX Operations Australia PTY LTD
Umbilicals, Riser and Flowlines (URF) EPCI Contract
Designation : Lead Electric & Instrument
Fabricating in : PT. Mc Dermott Indonesia, Batam Fabrication Yard
Job description:
Assistances prepare Project document and drawing project
Inpection process installation equipment instrument (pressure instrument, temperature instrument, level instrument) installation fire and gas system (smoke detector, flame detector, flame detector tester, heat detector, thermal leak detector and gas detector)
Fabrication support (equipment E&I, Juction Box, ladder tray)
Lead process pulling cable, dressing, Arrange process glanding and termination cable power and instrument
Megger test and continuity (MC), punch list items (clearance), ITR and ITP
Arrange install support cable power and instrument, install equipment process
Period : May 2011 ~ March 2014
Client/End Use : Chevron Gorgon Project
Project : Chevron Processing Platform and Chevron Quarter Platform
Designation : Quality Control Electric & Instrument
Fabricating in : PT. Mc Dermott Indonesia, Batam Fabrication Yard
Job description :
Prepare FEED / Project document, procedure, project specification, vendor document, drawing, testing and inspection document, QA/QC document and dossier (DAC and hand over certificate)
Inspection and observation material, equipment (preventive action) followed procedure,specification and code, standard project
Fix and problem solve in the site (corrective action) and meeting requirement
Observation process and implementation fabrication, assembly, installation, witness, testing, inspection and controlling product according standard, codes, rules and approval design drawing
Implementate process Factory Acceptance Test (FAT) and Site Accaptance Test (SAT) in manufacturing and site
Witness quality in the site / Inspection Test Record (ITR)
Witnees and inspection quality and prepare form Punch List in site for platform
Period : August 2009 ~ March 2011
Client/End Use : Chevron Platong Gas II
Project : - Chevron Processing Platform (CPP)
- Chevron Quarter Platform (CQP) and Heli Deck Platform
Designation : Lead Electric & Instrument
Fabricating in : PT. Mc Dermott Indonesia, Batam Fabrication Yard
Job description :
Prepare document and drawing project according rules and approval design drawing
Observation process fabrication and Installation equipment instrument (pressure instrument, temperature instrument, level instrument) installation fire and gas system (smoke detector, flame detector, flame detector tester, heat detector, thermal leak detector and gas detector)
Fabrication material support and installation support ladder tray, chanel tray and equipment support
Lead and arrange process pulling cable power, instrument cable and field bus cable, dressing cable power and instrument, installation: junction box, CCTV, PAGA (speaker),
Installation support cable ladder, chanel tray, equipment support electric power and instrument, cable MCB
Arrange job for glanding and termination: (cable power, instrument, lighting, junction box and PAGA / speaker) and, installation equipment: (instrument, lighting, flood light, junction box, CCTV, PAGA etc) and cable Heat Tracing
Aron Lifts International: Installation equipment lift, installation and setting support cable power and instrument, installation cable tray, pulling cable and JB, glanding and termination: cable power and instrument, termination wire and install lighting.
Period : March 2006 ~ June 2009
Client/End Use : ARTHIT
Project : Arthit Processing Platform
Project : Arthit Offshore
Site : Gulf of Thailand
Client/End Use : SUTUVANG
Project : Sutuvang Well Head Platform and Central Processing Platform
Client/End Use : Conoco Phillips
Project : NORTH BELUT Processing Platform
Client/End Use : MAERSK PEREGRINO
Project : Floating Production Storage Offloading (FPSO)
Designation : Electric Process
Fabricating in : PT. Mc Dermott Indonesia, Batam Fabrication Yard
Job Description :
Prepare document package and drawing project fabrication, construction and installation
Prepare cable power, instrument and material
Support fabrication, construction and installation and fabrication ladder tray and cable tray
Pulling cables power and instrument with dressing cables
Megger test and continuity cable power and instrument,
Glandding cable power and instrument with termination wire: (junction box, lighting, receptacle, instrument equipment, PAGA, fire & gas and HVAC), fill road chanel tray, electric heat tracing pipe: (pulling cable and insulation, gland and termination).
Prepare document project and drawing project
Punch list ( clearance), Inspection, ITR and ITP for Electric&Instrumet equipment
Installation: junction box, equipment instrument, fire & gas, CCTV, PAGA, etc,
( pulling and insulation cable heat tracing)
Setting panel instrument room, switchgears, control room and battery room
CRANE SEATRAX SUTUVANG: Fabrication and installation support cable tray, pulling cable power and instrument, glanding cable and termination wire: lighting, junction box and instrument cable, install equipment crane ( lighting,flood light, junction box, CCTV, etc).
Period : July 2004 ~ Februari 2006
Company : PT. ASL SHIPYARD INDONESIA
Project : Onshore Facility Maintenance
Designation : Electrician
Site : Batam Indonesia
Job Description:
Fabrication and construction support cable for facility
Install support, install equipment power and install trafo
Pulling cable power with dressing cable
Install support panel and setting panel switchgear, battery room and install junction box all equipment E&I
Glanding and termination wire cable power for facility and maintenance.
Period : April 2003 ~ May 2004
Client/End Use : Jepang Vietnam Petrolium Company (JPVC)
Project : Well Head Platform (WHP)
Client/End Use : Conoco Phillips
Project : Well Head Platform (WHP)
Client/End Use : Conoco Phillips
Project : Belanak Floating production Storage Offloading (Belanak FPSO)
Designation : Electric Process
Fabricating in : PT. Mc Dermott Indonesia, Batam Fabrication Yard
Job Description :
Prepare cable power and instrument, material electric, support construction, ladder tray and cable tray
Fabrication and installation support ladder and cable tray
Pulling cable power, instrument and dressing cables
Cable megger test and continuity cable power and instrument,
Glandding cable power and instrument, termination wire: junction box, lighting, pump motor, electrical heat tracing, fire & gas, instrument equipment, PAGA/ speaker, CCTV, telephone and data out let (Cat5e cable) and prepare fiber optic cable (stripping and insert the fibers into the 900ım buffer tube fan-out kit), also completion electrical punch list
Block MCT cable power and instrument
Installation support, ladder tray and cable tray, installation equipment power and instrument
Setting and install support and panel switchgear and instrument room
Period : February 2002 ~ January 2003
Company : PT. BATAMEC
Project : Onshore and Offshore
Designation : Electrician
Site : Batam Indonesia
Job Description :
Fabrication and construction support ladder tray and cabel tray
Pulling cable power LV, MV and HV for facility maintenance
Install support cable and ladder tray, install equipment power
Setting support and panel switchgear
Glanding and termination cable power junction box maintenance
Period : July 2000 ~ July 2001
Company : PT. Pulogadung Pawitra Laksana
Designation : QI/QE Welding Quality Control
Project : Autobody Manufacturer
Site : Jakarta Indonesia
I state that the information given by is true and correct, thank you for your kind attention.
Sincerely yours,
Lovenri Soaduon Manurung