QC Inspector, Technician and Maintenance Electric&Instrument

Location:
Batam, Riau Islands, Indonesia
Salary:
4000
Posted:
May 09, 2016

Contact this candidate

Resume:

LOVENRI SOADUON MANURUNG

Address: Puri Buana Indah Blok K No.16 Rt 006/022

Kelurahan buliang

Kecamatan Batu Aji-Batam Indonesia

Date of Birth : April 14ͭ ͪ, 1982

Nationality : Indonesia

Marital status : Married

Sex : Male

Mobile Phone : (62) – 813-**-***-*** / (62) – 813-**-***-***

E-mail : acuoya@r.postjobfree.com

Skype : lovenri.manurung

OPTION OF APPLICATION

QC/Inspector Electric&Instrument

Foreman Electric&Instrument

Senior / Technician Electric&Instrument

Travel of Document

Number of Certificated

Place / Institution

Date of Issue

Date of Expiry

Passport

A 9275105

Batam, Indonesia

31/10/2014

31/10/2019

Seaman Book

C 082759

Batam, Indonesia

18/11/2014

17/11/2019

Complement of Certificated

Number of Certificated

Place / Institution

Date of Issue

Date of Expiry

Basic Offshore Safety Induction&Emergency Training_BOSIET And Travel Safety by Boat_TSbB

131157072310140182

BSTC TRAINING

Batam, Indonesia

21/10/2014

22/10/2018

Electric&Instrument Inspector

368/Ins.-XXII/III/2014

IKBAL-M-YOS

Batam, Indonesia

29/02/2014

No Limit

Basic Safety Training_BST

0196/EBK-LAT/IX/2013

PT.Exaudi Bina Karya

Batam, Indonesia

01/10/2014

No Limit

Diploma III Electro_D III Electro_Electrical Engineering

175/K/PL29/IX/ 2013

Politeknik Negeri Batam, Indonesia

19/09/2013

No Limit

Basic Safety Training_BST

6211435870010113

STIP Jakarta, Indonesia

15/03/2013

15/03/2018

Cables Glands Awareness Course

CMP PRODUCT

Mc Dermott, Batam Indonesia

29/06/2006

No Limit

3 Days Management Orientation

HR-04838/IV/03

Mc Dermott, Batam Indonesia

30/04/2003

No Limit

SUMMARY OF EXPERIENCES

I have over 13 years of extensive working experiences in the electric & instrument process, in various practices on quality control new fabrication, construction, installation (erection), mechanical completions, pre- commissioning and maintenance of Oil and Gas platform onshore and offshore. Front End Engineering Design (FEED); Project document: procedure, project specification, vendor document, project drawing, testing&inspection document, QA/QC document and dossier (DAC, hand over certificate). Witness current injection test for transformer, MCC, Switchgear and Witness Battery Charge Test. Knowledge in to evaluate Factory Acceptance Test. Inspection of electrical installation switchgear and MCC, transformers, UPS systems & motors. Inspect on lighting, instrument; pressure, temperature, level, flow, Fire and Gas detectors.I did fabrication, installation support and equipments all types on platforms. Having worked my way from a surface defects and discontinuities from welding for fabrication and installation electric&instrument support on platform. I am experience in offshore to finishing project all equipments in electric&instrument process for revision and additional of modern electric system, such as instrument, fire protection and Gas system, Valve control panel and power control (LV,MV and HV). I am capable of ensuring that call client’s specification, QC Procedures, and International code and standards are complied with as well as maintaining a high standard of safety. I have always considered myself to have a good relationship with the client and my managers. I am hard working and I follow company safety policies and procedures and I also lead a good example to those people working under me. Safety is always my first thought.

EDUCATIONAL BACKGROUND & QUALIFICATION

- Politeknik Negeri Batam " Electrical Engineering / Electric Installation"

(Batam, Riau Islands Indonesian) 2010 ~ 2013

- Senior High School (P. Siantar, North Sumatera Indonesian) 1997 ~ 2000

Language Skills

Indonesia : Mother tongue

English : English Practice and more applicable

SCOPES OF SPECIALIST TRAINING

Quality Awarness (QSHE).

ISO 9000 Quality management and quality assurance standards – guidelines for selection and use

ISO 9001;2008 Quality systems.. Model for quality assurance in design, development, production, installation and servicing

Profile Measurement, Document Package and Project Drawing.

Code and Standard International (ISA, IEC, NEC, IES, BS, ABS, API, NEMA, ASME)

Valve Control and Power Control (LV,MV and HV)

Inspection and Quality Control

Equipment System Platform and Barge Troubleshooting

Discontinuities Degradation, Welding defects and remedies

Test Functional and Calibration Instrument

Electric & Instrument Inspector job and responsibilities

Destructive Test (Hydrotest and Pneumatic Test)

Safety in Electric Operation.

Electric Compatibility and PPE

Inspection Test Plan (ITP) & Quality Plan

Hydraulic and Pneumatic System

HVAC, PAGA, Fire and gas

Structure and Fabrication

Onshore and Offshore Construction and Marine Crew

Summary Of Experience in Vessel Sea Of Offshore

Vessel

Company

Type of Vessel

DWT / GRT

Type of Engines

BHP

Rank

Sign on Date

Sign off Date

Songa Venus Majuro

Connect Energy Service

Semi Submersible Rig

12088 GRT

MAN CAT 3512

4xEMD 16-645 E8

Electric

19/01/2015

02/04/2015

MV. Tiare Moana

Neptune Pacific Agency Australia

Shipping

3972 GRT

MAN B&W

3360 KW

Electric

05/11/2015

29/02/2016

WORK EXPERIENCES

Period : Nov 2015 ~ February 2016

Company : Neptune Pacific Agency Australia Pty. Ltd.

Project : MV. Tiare Moana IMO NO 8912871 Portsmouth

Designation : Electrician

Location : Auckland City New Zealand

Job Description :

Vessel & Alarm Management System (VMS); ballast control system, tank gauging system, anchor line monitoring system, fire fighting monitoring, emergency shutdown system, bilge alarm system

Power Management System (PMS); Diesel engines monitoring and control, generator control, Synchronization and load sharing, control of switchboard power distribution circuit breakers, Power reservation program: Automatic starting of the standby generator, blackout recovery, alarming and advisory messaging

Tank Gauging; Level indication and alarm of all monitor tanks, potable water sea water and fresh water, fuel oil and lube oil

Distributed Control System (DCS); Fire and gas detection, Co2 detection, HVAC/ dampers monitoring, fire fighting, sewage collection/ treatment

Period : May 2015 ~ October 2015

Client/End Use : Yamgaz

Project : Yamal LNG Project

Designation : Lead QC Inspector Electric & Instrument

Fabricating in : PT. Siemens, Batam Fabrication Yard Indonesia

Company : Bintan Marine Technology

Job Description :

Strong knowledge in Electrical Inspection : Vendor package / incoming, preservation, Hazardous area, Mechanical Completion, RFI (Record For Inspection)

Strong knowledge in system completion: Mechanical Completion, Pre Commissioning, Commissioning, start up

Having knowledge with technical drawing: AFC, IFC, Technical drawing technology, calibration & function test instrument

Prepare FEED / Project document, procedure, project specification, vendor document, drawing, testing and inspection document, QA/QC document and dossier (DAC and hand over certificate)

Inspection and observation material, equipment (preventive action) followed procedure,specification and code, standard project

Fix and problem solve in the site (corrective action) and meeting requirement

Observation process and implementation fabrication, assembly, installation, witness, testing, inspection and controlling product according standard, codes, rules and approval design drawing

Implementate process Factory Acceptance Test (FAT) and Site Accaptance Test (SAT) in manufacturing and site

Witness quality in the site / Inspection Test Record (ITR) and prepare E&I documents including of: code and standard international, P&ID

Witnees and inspection quality in the site and prepare form Punch List in site for construction

Period : March 2015 ~ April 2015

Company : Connect Energy Service

( Songa Venus Majuro) SemiSubmersible Rig

Project Site : Keppel Fells Shipyard Singapore

Designation : Electrician

Job Description :

Electrical maintenance in a limited time, troubleshooting and fault finding

Basic Knowledge in winch operation

Monitoring the functioning of the electrical equipments and electric motor

Assisting Chief electrician for maintenance NCR, Engine Room and Control Room

Period : May 2014 ~ October 2014

Client/End Use : Petronas Carigali

Project : Kepodang Gas Development Project

Client/End Use : INPEX Ichtys

Project : INPEX Operations Australia PTY LTD

Umbilicals, Riser and Flowlines (URF) EPCI Contract

Designation : Lead Electric & Instrument

Fabricating in : PT. Mc Dermott Indonesia, Batam Fabrication Yard

Job description:

Assistances prepare Project document and drawing project

Inpection process installation equipment instrument (pressure instrument, temperature instrument, level instrument) installation fire and gas system (smoke detector, flame detector, flame detector tester, heat detector, thermal leak detector and gas detector)

Fabrication support (equipment E&I, Juction Box, ladder tray)

Lead process pulling cable, dressing, Arrange process glanding and termination cable power and instrument

Megger test and continuity (MC), punch list items (clearance), ITR and ITP

Arrange install support cable power and instrument, install equipment process

Period : May 2011 ~ March 2014

Client/End Use : Chevron Gorgon Project

Project : Chevron Processing Platform and Chevron Quarter Platform

Designation : Quality Control Electric & Instrument

Fabricating in : PT. Mc Dermott Indonesia, Batam Fabrication Yard

Job description :

Prepare FEED / Project document, procedure, project specification, vendor document, drawing, testing and inspection document, QA/QC document and dossier (DAC and hand over certificate)

Inspection and observation material, equipment (preventive action) followed procedure,specification and code, standard project

Fix and problem solve in the site (corrective action) and meeting requirement

Observation process and implementation fabrication, assembly, installation, witness, testing, inspection and controlling product according standard, codes, rules and approval design drawing

Implementate process Factory Acceptance Test (FAT) and Site Accaptance Test (SAT) in manufacturing and site

Witness quality in the site / Inspection Test Record (ITR)

Witnees and inspection quality and prepare form Punch List in site for platform

Period : August 2009 ~ March 2011

Client/End Use : Chevron Platong Gas II

Project : - Chevron Processing Platform (CPP)

- Chevron Quarter Platform (CQP) and Heli Deck Platform

Designation : Lead Electric & Instrument

Fabricating in : PT. Mc Dermott Indonesia, Batam Fabrication Yard

Job description :

Prepare document and drawing project according rules and approval design drawing

Observation process fabrication and Installation equipment instrument (pressure instrument, temperature instrument, level instrument) installation fire and gas system (smoke detector, flame detector, flame detector tester, heat detector, thermal leak detector and gas detector)

Fabrication material support and installation support ladder tray, chanel tray and equipment support

Lead and arrange process pulling cable power, instrument cable and field bus cable, dressing cable power and instrument, installation: junction box, CCTV, PAGA (speaker),

Installation support cable ladder, chanel tray, equipment support electric power and instrument, cable MCB

Arrange job for glanding and termination: (cable power, instrument, lighting, junction box and PAGA / speaker) and, installation equipment: (instrument, lighting, flood light, junction box, CCTV, PAGA etc) and cable Heat Tracing

Aron Lifts International: Installation equipment lift, installation and setting support cable power and instrument, installation cable tray, pulling cable and JB, glanding and termination: cable power and instrument, termination wire and install lighting.

Period : March 2006 ~ June 2009

Client/End Use : ARTHIT

Project : Arthit Processing Platform

Project : Arthit Offshore

Site : Gulf of Thailand

Client/End Use : SUTUVANG

Project : Sutuvang Well Head Platform and Central Processing Platform

Client/End Use : Conoco Phillips

Project : NORTH BELUT Processing Platform

Client/End Use : MAERSK PEREGRINO

Project : Floating Production Storage Offloading (FPSO)

Designation : Electric Process

Fabricating in : PT. Mc Dermott Indonesia, Batam Fabrication Yard

Job Description :

Prepare document package and drawing project fabrication, construction and installation

Prepare cable power, instrument and material

Support fabrication, construction and installation and fabrication ladder tray and cable tray

Pulling cables power and instrument with dressing cables

Megger test and continuity cable power and instrument,

Glandding cable power and instrument with termination wire: (junction box, lighting, receptacle, instrument equipment, PAGA, fire & gas and HVAC), fill road chanel tray, electric heat tracing pipe: (pulling cable and insulation, gland and termination).

Prepare document project and drawing project

Punch list ( clearance), Inspection, ITR and ITP for Electric&Instrumet equipment

Installation: junction box, equipment instrument, fire & gas, CCTV, PAGA, etc,

( pulling and insulation cable heat tracing)

Setting panel instrument room, switchgears, control room and battery room

CRANE SEATRAX SUTUVANG: Fabrication and installation support cable tray, pulling cable power and instrument, glanding cable and termination wire: lighting, junction box and instrument cable, install equipment crane ( lighting,flood light, junction box, CCTV, etc).

Period : July 2004 ~ Februari 2006

Company : PT. ASL SHIPYARD INDONESIA

Project : Onshore Facility Maintenance

Designation : Electrician

Site : Batam Indonesia

Job Description:

Fabrication and construction support cable for facility

Install support, install equipment power and install trafo

Pulling cable power with dressing cable

Install support panel and setting panel switchgear, battery room and install junction box all equipment E&I

Glanding and termination wire cable power for facility and maintenance.

Period : April 2003 ~ May 2004

Client/End Use : Jepang Vietnam Petrolium Company (JPVC)

Project : Well Head Platform (WHP)

Client/End Use : Conoco Phillips

Project : Well Head Platform (WHP)

Client/End Use : Conoco Phillips

Project : Belanak Floating production Storage Offloading (Belanak FPSO)

Designation : Electric Process

Fabricating in : PT. Mc Dermott Indonesia, Batam Fabrication Yard

Job Description :

Prepare cable power and instrument, material electric, support construction, ladder tray and cable tray

Fabrication and installation support ladder and cable tray

Pulling cable power, instrument and dressing cables

Cable megger test and continuity cable power and instrument,

Glandding cable power and instrument, termination wire: junction box, lighting, pump motor, electrical heat tracing, fire & gas, instrument equipment, PAGA/ speaker, CCTV, telephone and data out let (Cat5e cable) and prepare fiber optic cable (stripping and insert the fibers into the 900ım buffer tube fan-out kit), also completion electrical punch list

Block MCT cable power and instrument

Installation support, ladder tray and cable tray, installation equipment power and instrument

Setting and install support and panel switchgear and instrument room

Period : February 2002 ~ January 2003

Company : PT. BATAMEC

Project : Onshore and Offshore

Designation : Electrician

Site : Batam Indonesia

Job Description :

Fabrication and construction support ladder tray and cabel tray

Pulling cable power LV, MV and HV for facility maintenance

Install support cable and ladder tray, install equipment power

Setting support and panel switchgear

Glanding and termination cable power junction box maintenance

Period : July 2000 ~ July 2001

Company : PT. Pulogadung Pawitra Laksana

Designation : QI/QE Welding Quality Control

Project : Autobody Manufacturer

Site : Jakarta Indonesia

I state that the information given by is true and correct, thank you for your kind attention.

Sincerely yours,

Lovenri Soaduon Manurung



Contact this candidate