JIMI JASPAR KISPOTTA
Unit-**/F, Velante Drive, ** Avenue, Cubao, Quezon City, Philippines
Contact No: 099******** ; Email: *****.*****@*****.***
Certificate of Residence (Philippines ) : CRTV0000134659 ( Married to a Filipina)
PROFILE
A competent & diligent electrical engineer with vast experience across Plant Electrical Maintenance, Operation & SAP-Plant Maintenance Module, commissioning, erection and allied activities Technical Evaluation, Client relationship management and process management.
Having experience of working in TPM & SAP environment, plus Aware of ISO 9001:2008
Proficient in introducing electrical modifications and process improvements to optimize operational efficiency of electrical equipments.
Well equipped with knowledge of Operations & Maintenance of HT & LT panels, switchgears, motors & transformers, DC drives, DG sets. Expertise in managing the maintenance of electrical control systems.
Extensive experience in managing installation, maintenance, commissioning, testing and inspection of electrical equipments in stipulated time.
Proficient in Maintenance plus well exposed to working on HT/LT transformer, HT/LT motors, HT/LT breakers, LT Variable frequency drives(VFD), battery, UPS .
Consummate professional, armed with a clear understanding of Health & Safety Standards, Quality Compliances and Energy Conservation Methodologies.
PROFESSIONAL EXPERIENCE
TAN-DELTA ELECTRIC CORPORATION, PROJECT 4, QUEZON CITY
Engineering Manager June 2015- Till date
Panning, scheduling, monitoring and control of ongoing and incoming projects.
Supervision and testing on site projects and co-ordination with the clients.
Conduct product technical and test instrument user’s training to Tan Delta personnel and Clients.
Formulation of Methodology in the preparation of ISO Accreditation.
Review testing standards and norms and make necessary recommendations for any changes and corrective action
Approve Electrical Test reports.
Monitoring and checking of project DTR.
Preparation of project bar chart /time schedule according to the scope of work for the respective projects.
Checking of Field service and completion reports.
Preparation of system procedures, workflow for Engineering and Operations Department.
INDO-PHIL GROUP OF COMPANIES, MARILAO, BULACAN, PHILIPPINES
Manager - Electrical March 2012 – May 2015
Spearheading efforts across management & maintenance of Distribution system sub-station, switchgears, electronics and electrical equipments for Indo-Phil Textile Mills Inc., Indo-Phil Cotton Mills Inc. & Indo-Phil Acrylic Mfg Co. to provide best engineering practices to maintain smooth operation of the plant.
Responsible for Planning, Scheduling & Execution of electrical related maintenance work for all Mills and ensure maximum availability of all electrical equipments.
To review and analyze existing installation performance and make necessary recommendations for modification and corrective action.
Implementation of energy conservation methods to reduce power consumption.
To ensure proper implementation of SOP’s in the operation and maintenance of all equipments in the plant including the proper analyzes of operating parameters.
To conduct monitoring and checking of equipments performance and perform preventive, planned & predictive maintenance for maximum availability of equipments and minimize downtime.
To achieve reduction in maintenance costs through in house repairs and utilize locally manufactured spare parts instead of imported spare parts.
Preparation of daily and monthly power consumption reports for all the three mills.
Keeping maintenance record of all equipments and productively utilized it for resolving operating issues.
Mapping requirements of spares and to ensure availability of reasonable inventory of critical spares at all times.
Maintenance and updating of ISO documentation and keeping records up to date.
JSW - ISPAT STEEL LTD. DOLVI, INDIA
Assistant Manager (Electrical Department) April 2010-September 2011
Spearheading efforts across management & maintenance of 220kv, 11kv, 3.3kv & 400 volts Distribution system sub-station. Plus involved in Installation and Testing of HT/LT Switchgears (SIEMENS, L&T etc) as well as taking care of Power cable, control cable scheduling.
Responsible for Testing and commissioning of LV motors up to 225KW used for compressor, pumps & conveyor system. Plus Doing Testing and commissioning, maintenance of Distribution Substation auxiliaries such as UPS, Battery chargers, Fire fighting system, etc.
Experienced in Commissioning & working knowledge of DC Drives (KIRLOSKAR). Managed Supervision of Cable laying and termination (HT/LT).
Holding Working knowledge of PLC’s (ALAN BRADLEY) & Knowledge of Static/Numerical Relays
(7SJ600, 7SJ6002, CTMM, CTMFM, etc.).
Managing Trouble shooting of various problems during supervision at site.
Taking care of Preventive maintenance of electrical equipments (Transformers, HT/LT switchgears, HT/LT motors, DG Set, DC batteries and Battery chargers, UPS.
Carrying out condition monitoring of electrical equipments in co-ordination with Conditioning Monitoring dept in order to ensure the healthiness of the equipments.
Monitoring of Shift Operation in coordination with production shift in-charge and co-ordination with Nagothane Pump house Maintenance staff.
Accountable for Installation, Testing & Commissioning of Plant electrical equipment and instruments like Relays and Circuit Breakers.
Generating Shift report in SAP R/3 4.6C. Plus Generating reservations for material issue in SAP R/3 4.6C.
Involved in Manpower planning & management, also maintaining the documents as per ISO 9001:2008
Defined operational parameters and ensured strict adherence thereto to generate maximum operational efficiency with additional responsibility for finalizing rate contract for the contract base work.
Meticulously kept maintenance record of all equipments and productively utilized it for resolving operating issues.
Mapped requirements of spares and ensured availability of reasonable inventory of critical spares at all times. Strictly complied with the established ISO 9001: 2000 standards.
Ensured safety of the workers and controlled safety regulation according to OSHA standards
Implemented preventive, planned and predictive maintenance practices to minimize equipments’ downtime. Evolved quick breakdown solution with systematic fault diagnosis and root cause analysis of failures.
Junior Manager /Shift In-charge (Electrical Department) April 2009 -March 2010
Monitoring of Shift Operation in coordination with production shift in-charge.
Co-ordination with Nagothane Pump house Maintenance Staff.
Attending break downs in the Plant during shift.
Preparing Daily Energy statement/MIS statement as per format.
Monitoring of specific energy consumption for Core Plant and Material Handling as per business plan, study of deviations from target and making reports for future records
Root cause analysis of problems occurring in shifts including why-why analysis reports preparation and modification / Improvements in the existing system to eliminate repetitive failures
Monitoring maintenance cost and reviewing cost reduction measures on a day to day basis.
Maintenance of Shift Log Books and DG set Log Books
Proper documentation and upkeep of all the drawings
Compliance of notifications in SAP system for pending jobs and shutdown jobs
Coordination with general shift engineers for maintenance & shutdown activities.
Allocation of jobs to technicians and their proper utilizations
Forwarding leave of respective shift technician to reporting officer
Timely recording all break downs & modifications in register/SAP.
Data recording of diesel consumption and energy generation of DG sets.
Wastage reduction.
Ensuring safety of equipment and personnel
Senior Engineer (Electrical Department) July 2006 - March 2009
Coordination with shift engineers for daily maintenance & shutdown activities.
Identification & rectification of defects related to Raw Material Handling area, Product Route Area, Furnace area.
To work on availability of spares & consumables for core plant & Material Handling area as well as shutdown job requirements.
Completion of PM/CM during the month & closing the Y2, YE & Y3 type notification. (As per allocated tags, shutdown planning & as per monthly schedule).
Maintain drawing & documents of SIP core plant & MH area.
Modification and improvements in the existing system to eliminate the specific problems occurring in the shift.
Allocation of jobs to technicians and their proper utilizations
Implementation of TPM (Total Productive Maintenance) standards and preparation of OPL (One Point Lessons), Maintaining of Fugai register and its rectification etc.
Attending and rectification of defects related to Cable vault, Cable trays and trenches, furnace ground floor, switchyard control room, air-conditioners and non-plant lighting.
Monitoring & updating of ISO 9001: 2000 & ISO 14001:2004 Documents
Safety system adherence, 100% compliance to SOP, Zero accidents
EDUCATIONAL DEVELOPMENT
Bachelor of Technology (Electrical Engineer)
National Institute of Technology (N.I.T), Rourkela, Orissa, India
Higher Secondary
M.G.M School, Rourkela, Orissa, India
Senior Secondary
M.G.M School, Rourkela, Orissa, India
Industrial Trainings Attended:
One month of summer training done in 2nd year of Engineering from Steel Authority of India limited (SAIL), Rourkela, Orissa.
One month of summer training done in 3rd year of Engineering from Larsen & Toubo limited (L & T, Kansbahal) Rourkela,Orissa for conversion of conventional machine to a CNC machine.
Computer Skills
Having SAP – Knowledge of SAP R3, PP module, PM module, Lotus notes Ver. 5.0 for office use
SAP R/3: Sap work experience in Production Planning (PP) module includes Goods issue, confirmation, creating reservation for material goods.
Plant Maintenance Module activities include Filling in notifications in event of breakdown maintenance, preventive maintenance, running maintenance etc.
Professional Trainings Attended:
Received training on Total Productive Maintenance (TPM).
Internal Customer Relationship Management Training has been undergone.
Received training on Time & Stress Management.
EXTRA CURRICULAR ACCOLADES
Member of the Institute Football team (2002 – 2006) – Mid Fielder, Which won All India Inter NIT football tournament in 2005-2006, Runners-up All India Inter NIT football tournament in 2004-2005.
Reached the semi-finals of All India Technical College Meet held at IT –BHU in 2004-2005
Date Of Birth: 15th August, 1983; Passport Number: H4149439
Permanent Address: At/ PO: Jhirpani, Khadia Tola, R.S Colony, Rourkela-42 Dist: Sundergarh, Orissa-769042, India
Nationality: Indian (Married to Filipina)