SUSAN A. LEJUNE
**** ******* ***** *******, ** **043
C: 832-***-**** H: 713-***-****
aculqx@r.postjobfree.com
PROFESSIONAL SUMMARY:
19+ years’ experience in the oil and gas industry with diverse knowledge and experience related to Supply Chain Management; Expediting, Document Control, Logistics and Buying.
SKILLS / TOOLS:
Microsoft Office 2007 – Excel, PowerPoint, Word, Access
Microsoft Project
Documentum
Oracle
SmartPlant - Marian
SmartPlant Foundation
JD Edwards
Encompass
Project Wise
SharePoint
SAP
iCMS
VPRM
Lotus Notes
Alair
Livelink
Numerous custom built in-house packages (ex. Nadia, GEMMS, eDMS, eCDR, AMUSE)
IPMS
PROFESSIONAL EXPERIENCE:
SK E&C, Houston, TX
October 2015 to December 2015 – Project placed on hold
Contract: Procurement/Sr. Expeditor – Expediting Lead
Onshore – Magnolia LNG Project
Implement expediting strategies and plans
Ensure adequate manpower to execute scope of work
Management and distribution of expediting workload
Set-up and maintain both electronic and hard copy filing systems
Conduct risk assessment of suppliers to effectively manage all tiers of the supply chain in order to maintain and / or improve contractual delivery dates
Co-ordination of field expediting activities
Obtain supplier reports, analyze and challenge prior to project distribution
Ensure all project reporting systems and tools are updated with latest information
Maintain and communicate expediting reports, including field expediting reports
Attend kick-off meetings
Ensure all engineering disciplines comply with project documentation approval cycles
Negotiate and instigate recovery plans as appropriate
Work closely with Quality Control and Material Controllers to ensure purchase orders are released and receipted in a timely manner
Promote Health, Safety, Security and Environment within the Supply Chain
Amec Foster Wheeler, Houston, TX
January 2015 to June 2015
Source Expeditor
Onshore – Enterprise Propane Dehydrogenation Project
Upon placement of a purchase order, contacted supplier and established point(s) of contact
Attended post award kick off meetings
Confirmed receipt of formal purchase order and obtained acknowledgement copy of purchase order
Contacted suppliers by telephone, email or personal visit to monitor progress of engineering, materials, fabrication, inspection and testing.
Expedited receipt of vendor and subcontractor drawings and material documentation
Developed a specific supplier expediting plan, monitored and revised when necessary
Assured that all required supplier documentation (i.e. general arrangement drawings, weld procedures, mill test reports etc.) are submitted as required
Accumulated and analyzed all data that may adversely affect scheduled deliveries. Anticipated delays and bottlenecks, and resolved problems with supplier or internally if required
Prepared, maintained and issued Material Progress Reports on a regular basis, which would reflect the progress of all purchased equipment and materials
Maintained good working relationships with suppliers to ensure optimum use of their resources toward meeting goals
WorleyParsons, Houston, TX
July 2013 to November 2014
Principal Expeditor
Onshore - Celanese Fairway Project
Reviewed open orders and coordinated with suppliers on late or critical deliveries
Attended post-award kick-off meeting
Expedited and report the progress of vendor’s procurement activities, shop schedules and shipping promise date
Conducted vendor and/or manufacturing expediting shop visits to insure adherence to purchase order and specification requirements
Promoted on-time and cost effective delivery of materials to jobsite, in compliance with the construction schedule
Expedited receipt of vendor and subcontractor drawings and material documentation
Notified site personnel of estimated time of arrival of material shipments
Generated and maintain the Expediting Material Status Report
Coordinated with Freight Forwarder/Traffic on plans for transport of materials
Responsible for reconciliation of vendor material invoices against material receiving reports
Approved and transmit vendor invoices for payment
Coordinated with Freight Forwarder/Traffic on plans for transport of materials
Generated, approved and distributed all ship release documentation
WorleyParsons, Houston, TX
August 2012 to July 2013
Principal Expeditor – Expediting Lead
Offshore - ExxonMobil Hebron Topsides Project
Supervised eight expeditors, as well as expedited several packages
Implemented expediting strategies and plans
Ensured adequate manpower to execute scope of work
Management and distribution of expediting workload
Co-ordination of field expediting activities
Communicated with suppliers to help maintain schedule integrity and assist in averting possible scheduling delays
Worked with Supplier contacts to facilitate the smooth flow of vendor documentation in both directions
Monitored timely execution of project delivery schedule and take remedial action in case of slippage
Achieved company savings through definitive due diligence in on-time drawing submittals
Issued and updated expediting reports highlighting problem areas and suitable recommendations
Coordinated inspection and logistics activities between Supplier and concerned parties as needed
Generated, approved and distributed all ship release documentation
Lutech - CB&I, Houston, TX
October 2011 to July 2012
Contract: Procurement/Sr. Expeditor
Onshore - Williams Geismar Plant Expansion
Communicated with suppliers to help maintain schedule integrity and assist in averting possible scheduling delays
Expedited and reported the progress of vendor’s procurement activities
Worked with Supplier contacts to facilitate the smooth flow of vendor documentation in both directions
Maintained a comprehensive spreadsheet of all scheduled and actual delivery dates
Helped to maintain files containing all receiving reports and copies of all shipping and receiving documentation
Generated, approved and distributed all ship release documentation
Worked closely with freight forwarders to make sure all equipment is delivered on time
Technip, USA, Inc., Houston, TX
Procurement/ Expeditor-Onshore
Onshore - Williams Energy De-Ethanzier Project – April 2011 to October 2011
Subsea - Jubilee Field Development Project – June 2008 to November 2009
Reviewed open orders and coordinate with suppliers on late or critical deliveries
Attended post-award kick-off meeting
Followed-up procurement activities and timely receipt of PO acknowledgements
Expedited and reported the progress of vendor’s procurement activities, shop schedules and shipping promise
Conducted Vendor and/or Manufacturing expediting shop visits to insure adherence to purchase order and specification requirements
Promoted on-time and cost effective delivery of materials to jobsite in compliance with the construction schedule
Monitored timely execution of project delivery schedule and took remedial action in case of slippage
Expedited receipt of vendor and subcontractor drawings and material documentation
Notified site personnel of estimated time of arrival of material shipments
Emailed Request for Quotes to Vendors for price and availability – ocean freight
Received and evaluate bids for price, delivery payment terms and completeness of bids – ocean freight
Compiled all vendor information to create Commercial Bid Tab – ocean freight
Assigned purchase order number and contact vendor of the number along with the shipping instructions using Oracle
Generated and maintained the Expediting Material Status Report
Coordinated with Freight Forwarder/Traffic on plans for transport of materials
Responsible for reconciliation of vendor material invoices against material receiving reports
Verified progress payment milestones by ensuring that all material received at the jobsite were documented with material receiving reports
Worked closely with freight forwarders to make sure all equipment is delivered on time
ConocoPhillips, Houston, TX
October 2010 to April 2011
Procurement Associate
Responsible for inputting pipe transfers from the ConocoPhillips yard to each well site into SAP as well as created procedures to keep the transfers in compliance
Handled good receipts
Maintained the Global Procurement Savings & Sourcing report for the Americas Business Unit
Swift Oil & Gas (BP - CDP), Houston, TX
June 2010 to July 2010
Contract: Material Field Expediter
Offshore - Gulf of Mexico Oil Spill
Responsible for ensuring all equipment and documentation were completed and shipped on time, in order to minimize the environmental damage from the Gulf of Mexico oil spill
Required extended hours for numerous visits to the vendors’ facilities to personally ensure timely completion and delivery
SBM - Atlantia, Inc., Houston, TX
January 2005 to May 2008
Expeditor Offshore – ThunderHawk Project
Responsible for the expediting functions in support of the ThunderHawk – Murphy Oil TLP project - GoM. Followed-up Procurement activities and timely receipt of PO acknowledgements
Executed Quality Plan schedules by suppliers (manufacturing program, data and document, delivery dates, sub - supplier program, manpower allocation, material controls)
Coordinated timely flow of engineering documents, conformity certificates, test reports, and inspection reports between Supplier and concerned parties
Monitored timely execution of project delivery schedule and took remedial action in case of slippage
Achieved company savings through definitive due diligence in on-time drawing submittals
Issued and updated expediting reports highlighting problem areas and suitable recommendations
Coordinated inspection and logistics activities between Supplier and concerned parties as needed
Coordinated with Inspection, Logistics, and Supplier Data, including Engineering and Procurement departments ensuring team player status, verified progress payment milestones by ensuring that all material received at the jobsite were documented with material receiving reports
Engineering Document Control Coordinator
FPSO – P53 Turret
Controlled SBM - I Engineering and Design documents for internal and external distribution by electronic and hard copy means
Controlled documents from external sources such as suppliers, fabricators and certification/classification agencies for external and internal distribution, this included the control, handling, issuing, expediting, distribution and filing of documentation as well as interface with suppliers, fabricators and SBM - Atlantia inspectors were ensured timely and complete document submittals
Controlled the issue of Design Change Forms (DCFs) to fabricators to ensure all were issued in a timely manner to the responsible fabricators
Expedited the return of reviewed Technical Query Request and Non - Conformance Reports in reference to suppliers to ensure timely response with control logs prepared
Prepared the project Engineering and As - Built Fabrication dossiers
Sought ways of minimize documentation consistent with quality system requirements, and seek ways to improve the efficiency of handling and storage of documentation
Trained other personnel in reference to Document Control procedures and Document Control software tools
Gulf Interstate Engineering, Houston, TX
May 2001 – December 2004
Procurement/Quality Assurance Secretary / Expeditor / Project Secretary
Composed and typed correspondence for Manager of Procurement Services and Quality Assurance Manager as well as maintained calendars for each
Prepared expense reports
Managed document control files for RFQs, Purchase Orders, Bid Acknowledgements, etc
Updated ISO Procedures / Processes and updated information in VPRM
Handled domestic and international travel arrangements
Maintained inventory of office supplies
Procurement/Expediter
Developed and maintained expediting reports
Interfaced between the project team and Vendors on schedule of delivery equipment, materials, and vendor documentation
Maintained regularly scheduled contact with Vendors to assure meeting scheduled deliveries
Unannounced contact as required
Maintained contact with engineering and construction representatives to identify and react to any changes in required deliveries
Updated spreadsheets on different Construction Spreads twice weekly
Handled all concerns from Client on materials not received or not found at construction sites
Project Secretary
Maintained filing system and appropriate records for all departmental personnel
Document control for all correspondence related to the project
Scheduled travel arrangements (domestic/international) for my Managers
Prepared and updated Monthly Invoice and prepared Monthly Progress Report
EDUCATION / CERTIFICATIONS:
Criminal Justice, Sam Houston State University, Huntsville, TX
Business, Louisiana Tech University, Ruston, LA
Certified Expediter (CE), 2006 – Expediting Management Association