Post Job Free

Resume

Sign in

Injection Molding Quality

Location:
United States
Posted:
April 29, 2016

Contact this candidate

Resume:

**** * ******* ******* ** *****

Phone 773-***-****

E-mail acukcf@r.postjobfree.com

Clifton White

Objective

To obtain a position in which I can utilize my skills and experience and become an asset to the company

Experience

Oct 2014- Present Bway Corp. Chicago Il.

Lead Process Technician

Responsible for accurate mold set-ups; start-ups; and process monitoring

Leads groups of employees with various molding skill levels

Material handling, monitoring of auxiliary equipment, and minor maintenance

Communicates with prior and oncoming shifts to give work assignments and expectations to achieve production requirements and promote shift interaction and awareness

Monitors production for accuracy and efficiency and work with quality inspectors to ensure part quality/performance

Adheres to all safety policies and procedures in order to maintain a safe and clean work are

Feb 2010 –Oct 2014 Scholle packaging Northlake Il

Process technician

Set up injection molds and related equipment for sample and production runs. Start up and cycles in mold in accordance with documented cycles and startup procedures.

Troubleshoot and correct problem processes.

Document and report mold and equipment related problems.

Document daily events in technicians log.

Communicate effectively with fellow workers.

Monitor cycle times and part quality.

Document and record cycle information for future use.

Adhere to cleanliness standards and product safety guidelines, including machine cleaning assignments.

Qualifications

Nov./05-Sep/08 W.H.Salisbury Chicago IL

Compression molding tech.

Worked as a compression molding tech. as well as an injection-molding operator performed related task to produce quality product for every customer. Produced and examined all parts for surface defects as per company quality standards. Read interpreted and followed machine specs, troubleshooting any and all malfunctions. Exchanged technical information with supervisor or engineer. Measured product for conformance using micrometers. Did set ups on smaller injection molding machinery (200-400 tons)

.

June/99-jan/04 Federal Mogul Skokie IL.

Injection molding tech III

Worked as an injection-molding tech operating all injection molding presses horizontal and vertical. Worked with both plastic and rubber injection molding process. Performed quality checks and inspected all products for non-conformance. Set and adjusted machine controls and settings to maximize production. Also performed sets-ups and worked with maintenance doing preventive maintenance.

Summary of qualifications

Plastic and rubber injection molding.* Inspect product move materials to or from work area. Troubleshoot, locate, identify, or diagnose malfunction. Measure for conformance to specifications using caliper, micrometer. Follow, interpret or read blueprints, schematics, and sketches. Adjust molds. Place, remove product/material into die mold. Set or adjust machine controls or settings. Inspect for conformity to industry standards or specifications. Ran all injection molding machines, rotary and shuttle presses, and CNC Milacron machines



Contact this candidate