Post Job Free
Sign in

Quality Control Assurance

Location:
Dallas, TX
Posted:
April 26, 2016

Contact this candidate

Resume:

MEHDI SADEGHI

Oklahoma, USA Cell: 918-***-****

E-mail: acuija@r.postjobfree.com

QUALITY ASSURANCE AND QUALITY CONTROL

Eager to contribute highly applicable mechanical and welding inspection skills and ability to prepare QA/QC report. I have team working knowledge and familiar with AS/NZS 4801 & ISO 9001 quality management system, ISO14001 and OSHAS.

PROFESSIONAL PROFILE

Quality assurance and Quality Control

Quality Control of mechanical equipment (fixed and rotary)

Inspection of welding before, during and after welding process (Preparing for CWI examination)

Performing penetrate tests, Magnetic particle test and radiography test interpretation

Report preparation of quality control and inspection TECHNICAL SKILLS & WORK EXPERINCE

Familiar with six sigma, lean and root cause analysis and studying for CWI (AWS) exam.

Perform and strictly monitor the following inspection activities as per ITP and Project Specifications

Design, Witness WPS & WQT as per required codes and standards

Review and verification of Material certificates and Cutting Plans before Fabrication Identification of material and stamp transfer

Preparation of As- built Drawings, weld maps for shop and field Welds

Monitoring Weld joint preparation and process improvement.

Fit-up inspection, welding inspection and visual inspection

Welding Inspection of Tie-In & Repair Weld

Verification of pipe fittings and piping dimensions and able to work with PDMS 3D piping equipment modeler

Verification and approval of heat treatment procedures

Monitoring of Pre Heat treatment before Welding, during welding, check proper parameters as per WPS

Control welding consumables and weld defect rate as per procedure

Welder Performance monitoring and taking corrective action

Monitor PWHT in special requirements

Verification of PWHT reports with respect to procedures and specifications

Arrange and co-ordinate NDT activities

Evaluation of NDT results (PT, MT & RT)

Interpretation of radiography films

Hardness inspection

Inspection of piping spools and Structural modules for Coating/ painting/ testing release

Assure all piping fabrication and handling of fabricated spools and installation are in accordance with general arrangements and isometric drawings / project specification

Preparation of piping hydro test packs according to P&ID and Isometric and organizing hydro test Arrangement and witnessing of Hydro, Leak and pneumatic tests according to client specification and approved drawing

Monitoring, gauging, cleaning, and air drying of pipelines

Punch list preparation during line walk for piping spool, piping valves, control valves, pressure valves, and its rotation check with respect to Isometric and P&ID

Line walk and mechanical clearance of piping and its piping components and hand over to commissioning department

Verify Instruments/ Equipment is calibrated as per project QA procedures and availability of all the calibration certificates & up-to-date project status information. Mehdi Sadeghi 2

Prepare and complete test packages and QA documents for final documentation

Taking timely actions to satisfy project management team and project management consultants in QA/ QC related issues

Daily / Weekly / Monthly reporting of QA/ QC activities to project management and client

Attending manufacturing and management meetings

Monitoring, Follow up & Closing out NCR

Co-ordination with 3rd party inspection agencies and clients for the inspection activities

Familiar with the following standards and specifications: ANSI 49.9, ASME (5.8.9 & 16.5), API (1104, 620,650, 653), ANSI (31.3), AWS D1.1.ASTM, NACE

MS Office as a professional & able design with Auto cad

Able to work with PMI (alloy analysis)

Able to work with CMM

PROFFESSIONAL EXPERIENCE

L.W.D.T LIAMSON-USA Feb2014-present

QUALITY AUDITOR

Material inspection

Radiography film review, MT & PT performance.

Enardo-USA Aug2013 up to Dec 2013

QUALITY ASSURANCE/QUALITY INSPECTOR

Receiving Inspection

Process Inspection (Coating & Painting)

Final Inspection & supervision

Quality Process Improvement according to casting standard SP-55

Improve Quality level of production

Suggest and following modern Quality system instead of old system Exterran-USA July 2011-Dec 2012

SENIOR QUALITY ASSURANCE/QUALITY CONTROL INSPECTOR Project: Pressure vessel (ASME SEC VIII.DIVISION1)

Welder Qualification performance.

Review radiography film.

Inspected vessels spools. (Before, during, after welding).

Witnessed Hydrostatic test and Coating + painting

Prepared PQR.

Prepared Quality control Document

Tehran Kansas Oct 2009 - July 2010

QUALITY ASSURANCE/QUALITY CONTROL INSPECTOR

Project: Engineering Procurement and Construction

Witnessed of Welders Performance Qualification Test

Inspected of main line welding and reviewed radiographic films

Holiday Testing, hydrostatic testing and commissioning of the gas pipelines, lowering in the trench Sepahan Weld Inspection Jan 2005 - Sep 2009

Mehdi Sadeghi 3

INSPECTOR AND RADIOGRAPHY TEST INTERPRETER

Project: nondestructive testing and Inspection of 500,000 Barrel Refinery Storage Tank:

Inspected piping fabrication and witnessed welder’s performance qualification test and approval.

Reviewed radiography test films.

Reviewed magnetic test, penetration test, and prepared inspection reports Sepahan Weld Inspection Sep 2003 - Nov 2004

MECHANICAL QUALITY CONTROL AND WELDING SUPERVISOR

Project: 500,000 bbl. OIL STORAGE TANK

Supervision of main contractor performing tank fabrication as per API 620.

Inspection of welding operation (before-during-after).

Inspection of piping fabrication. Review of quality control documents.

Witnessing of Hydrostatic testing and commissioning of plant piping

Witnessing of leak test, construction supervision of oil storage tank, punch list clearance items, final verification of test pack. Painting inspection.

Sepahan Weld Inspection Aug 2002 - Jun 2003

WELDING SUPERVISOR

Project: GAS PIPELINE 32” (Offshore)

Material and WPS control, control of welding equipment, welder qualification

Assignment construction and supervision of pipeline fabrication according to API 1104

Welding sequence control and weld identification

Ensure all non-destructive testing completion, report for records hydrostatic testing and commissioning Sepahan Welding Inspection Sep2001 - July2002

QUALITY CONTROL AND WELDIING SUPERVISOR

Project: OIL PIPELINE 32”:

Material is in accordance with drawing/wps is identified and is in suitable condition

WPSs have been approved and are available to welders and inspectors

Ensure welds are suitable for all non-destructive testing

Coordination with client/third party inspection personnel

Review the hydro test packages & prepare the final dossier for the client and Coating/Painting inspection. EDUCATION

Bachelor of Mechanical Engineering June 1998

Tehran University (Azad)

Associate Degree in Welding & Inspection July 2010 Comprehensive Tehran University Welding Research Engineering Center (IWREC) PROFESSIONAL AFFILATIONS

Welding Diploma in Electricity Welding June 2005

(Khaje Nasireddin Tousi High School)

2490 hours welding training Sept 1999- Dec 2000

(State Vocational and Technical Training Organization)

RT, MT & PT Testing Interpretation Level II (ASNT)- USA Aug 2014



Contact this candidate