Jay Gauthier
*** ***** *** ** **** 1-936-***-**** Ext 2
Montgomery TX 77316
United States of America
acuekf@r.postjobfree.com
QUALIFICATIONS
Over 15 years of experience as Project Management and Electrical Engineering
Drawings in AutoCad from One-line diagrams, detailed drawings and cable schedules
Standards in NEC, OSHA, UL, ATEX and IEEE
Programming in C++, Assembly, VBA, Function Blocks, Ladder Logic, Structured Text
HMI Programming-Panelview, Factory Talk, Intellutions, Wonderware, OMRON
Allen Bradley, Siemens, GE, and Omron PLCs.
Fanuc robot installation, programming and sustaining
Yaskawa AC drives, Allen Bradly AC and DC drives, GE Fanuc Drives, ABB ACS Drives
Rockwell, ABB and Square D MCC's and Switch Gear
Hardware Designs, and Commissioning of equipment.
PROFESSIONAL EXPERIENCE
Plant Engineer, A.Schulman, La Porte Texas – 3/15
Project Engineer on projects ranging from $1M to $15M
In charge of Maintenance Department at Plant
Root Cause analysis of all failures, both mechanical and electrical
Purchase and install of all new plant equipment
Programming of Allen Bradley PLC’s and drives
Troubleshooting both mechanical and electrical equipment
Sr. Electrical Engineer, Patterson UTI, Houston Texas – 4/14 to 1/15
Electrical Engineer in charge of all Electrical Projects for the company
Developing new technologies for Top Side Automation including pipe handing conveyor, automated wrench, and automated pipe handling system
Interfacing with company representatives for oil companies and Patterson UTI
Interfacing with vendors and contractors
Troubleshooting major failures and executing root cause analysis for the failures
Developing HMI and PLC code on OMRON PLC’s
Engineering Rig to Power Grid conversion.
Changing DC motor and SCRs to AC motors and VFDs
Automation Electrical Engineer, Canrig, Houston Texas - 6/13 to 4/14
Electrical Technical Lead on Managed Pressure Drilling product line.
Developing new Products under Managed Pressure Drilling.
Programming Allen Bradley Compact Logix and Control Logix, on Non Stop Driller and Total Control Driller product lines.
Coordinating certification of product for Explosion Proof areas.
Instrumentation from P&IDs
Detailed Engineering drawing for product
Guiding manufacturing on R & D and current products
Designing Hydraulic Systems and troubleshooting
Troubleshooting product line in field with Field Operation personnel
Servo Motors and Drives
Automation Project Manager, Tenaris, Houston Texas - 12/11 to 6/13
Assisted in the programming, setup and installation of the pipe conveyor upgrade including drives, Control logix PLCs, Sensors and Pneumatic lifting arms
Engineer on the installation and commissioning of 800 KW induction pipe welder
Worked as a backup Engineer on a smaller induction pipe welder
Worked as a backup manager on the run-out conveyor upgrade project.
Developed the programming and interface of new equipment to mill equipment
Developed drawing to interface new equipment in plant to exising PLC
Developed cable schedule for new equipment
Update mill drawings to coincide with new equipment installations
Assisted maintenance during start up and commissioning operations and on existing problems of mill through PLC and electrical testing.
Developed operating procedures for new equipment.
Installation and programming of Fanuc robot for installation of pipe end caps.
BOF Area Electrical Engineer/Caster Area Electrical Engineer, Arcelor Mittal, East Chicago Indiana – 7/08 to 12/11
Engineer on project, from cradle to grave, that replaced older GE series 6 and Allen Bradley SLCs to Allen Bradley Control Logix and Emerson Delta V systems for all the conveyors and load cells
Worked with maintenance personnel several times on problems to help troubleshoot instrumentation and PID loops on the BOF furnaces
Developed procedures for safe job execution
Developed HMI for new controls to Furnace PLC's in Factory Talk
Engineer on upgrade to caster tundish cars and turrets which included a radio active source and receiver communicating to an Emerson Delta V DCS system
Guiding maintenance and Contractors on mill upgrades and commissiong.
Upgrade to one caster line from GE DC drives to Allen Bradley 700 series AC drives, and motors plus related equipment.
Installation and commissioning of new slab cutter including motors, Allen Bradley Compact Drives, laser sensors, and Compact Logix PLC.
Helped diagnose quality defect in steel with caster drive system by looking at a drive oscillation problem and following it through to a mechanical problem
Information Systems Manager/ Maintenance Manager/ Maintenance Supervisor, Grede Foundries, Wichita Kansas – 7/04 to 7/08
Major projects included new servers, SAP implementation, upgrading all IT infrastructure
Saved the plant $20,000 per month in energy cost by upgrading PLC equipment on furnaces and developing program on existing MicroLogix PLC to modulate the input power going to the induction coils
Developed HMI for Furnaces' energy program
Maintained and Installed several servers including a web server, server for thin clients, multiple SQL servers, file servers, and active directory servers in a mixed Microsoft Windows and Linux environment
Developed custom industrial software in C++ and Lotus Notes
Installed and programmed Intellutions on a molding machine.
Upgrade the PLC from 3 Micro Logix controller to Control Logix for the sand system conveyors, hopper system, and load cells.
Upgraded level detection in sand silos with radar based sensors
Managed 4 supervisors, 30 maintenance personnel and parts department
In charge of safety for all of maintenance
Set up work with contractors on maintenance projects
Directed meetings for downturns and outages
Set up presentations for capital projects to be approved by the president of the company
Made sure all personnel followed all safety procedures in place, and helped develop new procedures
Made PLC changes on Allen Bradley PLC 5 to improve scan time on the molding machine to cut time off the cycle of the machine improving throughput.
Developed HMI system from scratch, custom software, in C++, for main molding machine
Maintenance Manager, Universal Metal Services, South Holland Illinois – 7/03 to 5/04
Managed 4 shifts of maintenance personnel and 1 Plant Engineer
Maintained DC and AC overhead cranes, shearing equipment, steel bar roll machines
Maintained computer mainframe and equipment
Developed capital projects for approval
Main Projects included upgrades to cranes to convert from DC motors to AC VFDs, upgrades to straightening and sizing equipment
Maintenance Shift Supervisor/Blast Furnace Production Manager, US Steel Gary Works, Gary Indiana – 6/01 to 6/03
Upgraded shakers and motor drive system on conveyors from MG sets to AC drives in stock house for Iron Producing
Upgraded Line 3 conveyors at Sinter Plant from all relays to Allen Bradley PLCs including installing HMI's.
Upgraded all MG sets conveyors in Sinter Plate from MG sets to Drives.
Supervised ironworkers, millwrights, electricians and systems personnel
Programmed HMI for Blast Furnace control rooms raw material additions.
Maintained numerous equipment from the Sinter plant, to the Blast Furnaces
Implemented downturn plans to completion
Made drawing for equipment and wiring that was changed out
Installed and changed high voltage switchgear
Maintained blast furnace equipment both mechanically and electrically
Education
Bachelor of Science in Electrical Engineering - GPA 3.14 out of 4
Purdue University Calumet Campus, Hammond, Indiana
Certificate of Completion in Electrical – Completed top of class grade A
Hammond Area Career Center, Hammond, Indiana