Post Job Free

Resume

Sign in

Construction Crane Operator

Location:
Quezon City, NCR, Philippines
Posted:
April 16, 2016

Contact this candidate

Resume:

Ernesto L. Siasat Jr.

Kabyawan Sta. Lucia, Samal Bataan

Contact No. 092********

Objective :

To be part of your company that will showcase my abilities, skills and

knowledge for my development and your company.

Working Experience:

Tower Crane Operator / Rigger

Hilmarcs Construction Corporation

1835 E. Rodriguez Sr. Ave., Quezon City, Philippines

Feb. 2012 Present

Tower Crane Handled

F0 23B SCM

26/24 SCM

D160 LUFFING SCM

MC 205 POTAIN

Educational Background:

Tertiary : Trade Technician Major in Welding and Fabrication

Bataan Peninsula State University

Capitol, Balanga City, Philippines

2009 2011

Secondary Level : Samal National High School

IbabaSamal, Bataan, Philippines

2004 2009

Elementary Level : Samal South Elementary School

Sta. Lucia Samal, Bataan, Philippines

2003 2004

Personal Background:

Date of Birth : January 06, 1993

Citizenship : Filipino

Civil Status : Single

Religion : Aglipay

Training and Seminars:

ISO 9001:2008 Awareness Seminar

Quality Policy Statement Orientation

HCCP10 Quality Manual Orientation

Held at 5th Floor Conference Room, HCC Head Office

1835 E. Rodriguez Sr. Ave., Quezon City, Philippines

May 31, 2014

Duties and Responsibilities:

Prior to Operation:

Verify the State of the cable and its movement

Verify that the Crane itself functions and security items make sure that

there are no specific risks as electrical lines or other cranes.

While Operation:

Make sure that the lift accessories are updated to the load and are

properly installed.

Make sure that the loads you are carrying are within allowed limits.

Perform preoperational inspection and calculate crane capacities and

weight to prepare for rigging and hoisting.

Performing routine maintenance work such as cleaning and lubricating

cranes.

Operating crane to lift move or place equipment and materials.

Make use of the warning signals when delivering loads.

Only answer to the designated person

End of Operation:

Bring back the crane to its marking position.

Lift the loading hook as high as possible.

Install all additional stabilizing items

Make sure that all services are ZERO gear.

Point the crane into the direction of the wind and keep it ZERO gear.

Shut off all systems.

Character Reference:

Engr. Cindy Pangilinan

FEMD Construction Manager

Hilmarcs Construction Corporation

Contact no. 099********

Edgardo Corton

Head Technician of Tower Crane

Hilmarcs Construction Corporation

Contact no. 091********

Herwin Corpuz

FEMD Coordinator

Hilmarcs Construction Corporation

Contact no. 091********

Crisostomo Ordinario

FEMD Coordinator

Hilmarcs Construction Corporation

Contact no. 091********

I hereby certify that the above information are true and correct to the best of my

knowledge and belief.

Ernesto L. Siasat Jr.

Applicant