Updated :**/**/***** / ** CV JAKA MARTIN
CURRICULUM VITAE
Jaka Martin
B.Eng majoring Electrical Engineering
Contact Person : +628********* or +628**********
Email : acudoe@r.postjobfree.com
OBJECTIVE
I would like to take this opportunity to briefly introduce myself at some time. Explained MISSION and VISION, duties etc as professional worker specifically Quality Inspector and Electrical
& Instrument.
I am assertive, reliable, strong desire, highly motivated, hard working person, quick learning, independent, adaptable, and trustworthy. I have good interpersonal skill, analytical skill, communication skill, and able to work under pressure.
I am Good leadership and able to interface effectively with all level a cross functions Organization.
Make Quality is Priority for management & Client.
Willing traveling and ready to be assigned on project site
Team work & Communication
Available to join immediately
COMPLEX, HAZOD,NEC,IEC, TCD, KPI,ITP, 7 waste, 7 tool, Sig sigma ( Alean Six sigma ), 8 D Problem solving Quality, SAC, ITR, Coordinate Housekeeping, 5W 1H,,QCC activity, Kaizen SKILL ACTIVITY and KNOWLEDGE
13 years’ experience in handling Management Engineering and Inspection for Oil and Gas projects ELECTRICAL AND INSTRUMENT, TUBING STRUCTURAL Equipment, Wellhead and involving Offshore
/ Onshore equipment and Processing project
Knowledge Electrical, Instrument mechanical, Competition (ITR,ITP,SAC,Dossier),Wellhead Control Panel Instrument Document, Calibration & Function test instrument, Pneumatic Control, Instrument control, Hookup instrument and Actuator, Testing Tubing, Instrument material selection, Instrument Speculation, Commissioning & Star Up, Mechanical Completion Inspection Test Report, Hazardous Area, Filed bus, Heat Tracing, Cable termination & cable gland, Cable Pulling/Segregation, Vendor package Inspection, Factory Acceptance Test (FAT), Installation
(Installation support tray, Equipment), Fabrication (Fabrication support Equipment, Support cable Tray, Gland, Support Panel)
Updated :11/04/20162 / 11 CV JAKA MARTIN
Good in Quality Management System (QMS) and Audit implementation; Quality Assurance/Quality Control activities, Inspection (visual, dimensional, Mechanical Testing)
Good in HSE Management System ( PRO SAFE, HAZOD POWER ELECTRIC )
MEMBER TEAM QUALITY INSPECTOR On ORGANIZATION INDONESIA
COORDINATOR IMPROVEMENT
2002 2003 : Yoshikawa asTeam
2010 2011 : Flextronics as Support Team
2011 2013 : NOC as Coordinator / Leader
2013 2014 : Citra Shipyards as Leader
LEADER REDUCE COST (TCD) on NOC
TEAM SUPPORT KPI ( KEEP PERFORMANCE INDICATOR ) On CITRA SHIPYARD Summary Experience 13 years
Responsible for Material Incoming GRN or MRN “Good receive note “During MRIR “Material receive Inspection Report “.
Coordinator QC, and Subcontractor right way
Pre commissioning and Commissioning load and Soloran ( Un load) Motoric motor Pump Responsible for the entire project installations and it’s testing and commissioning work inspections from start to end of handing over
Supervising for all slab floor wall work E/L Conduit for high, low voltage and low current as per site requirements.
Responsible for all Electrical and ELV installations as low & high voltage systems Power, Light, Emergency, Conduit, Wiring, Cable trays, Trucking’s, RMU, Transformers, Risers, Panel installations, MDBs, SMDBs, DB dressings, Cable Glandings, Terminations, Cable pulling’s, ATS, Generators, Bus bars, Transformers, Switchgears, Lightning protections, Earthings, etc. Responsible for checking of contract and work done as per contract value and time. Witness the material as per site requirement and make orders also check store. Witness the installation & Cable ladder, cable tray conection to Control room, Main Circuit Center ( MCC ), I/O ESD Cabinet, I/O PCS Cabinet, Generator, Compressor, Dry, Cooler, Transfer Pump, Metering SKID, Chemical Injection, Separator, Crude Oil Pump, Flare, Knock out Flare, H2s Stripper Column, & gearbox against approved construction drawing.
Witness all Inspection Test of all LV, MV cables, and other equipment E&I refer to the Test Pack’s or Work Pack’s.
Good working experience in follow up for executes with MEP contractors for Electrical & ELV works. Good experience in Low current systems installation, testing and commissioning for Telephone, CCTV, Audio Visual, Intercom, SMATV, EMCS, DAS, PA Systems, Fire alarm, Emergency, Nurse call, Novec, Access control and Security Systems.
Good experience in witnessing for Insulation Resistance tests (Megger Tests), Hypo Test of cables and RMU, Transformer tests prior to Energization of Sub Stations etc. Good experience in formulation and review of QA/QC document (ITP, Quality Plan, Method Statement, Procedure etc.) according to Project specifications, International standards and codes. Good organizational ability to leading a working group of quality circle and site team to achieve the project goals and objectives
Monitoring all work with Engineers, foremen, charge hands, technicians, store in charge on daily basis as per site planning.
Attend daily and weekly progress meetings with main contractor, sub contractor, project consultant and client.
Updated :11/04/20163 / 11 CV JAKA MARTIN
Preparing weekly reports and forwarding to concerned Project Manager and Site Managers. To ensure Human Safety Environment Regulations applied in every steps of the E & I works Coordinate with Purchase Department / Supplier / Manufacturer’s for the document which required for the Material Approval.
Preparing and Raising observations / NCR to site engineers and sub contractors. Replying and closing all NCRs / SDRs with proper corrective and preventive measures. 1 Period : June 2015 – Present Karimun islands Indonesia Company : OIL TANKING
Position : QAQC Coordinator E&I, HVAC
EPC : Indian Oil Tanking
Sub cont. : RCS, GARTE, MCD, MDS, COLDFINE,MFT
Vendor : ABB,Tranfoil, HIT,
Job Description
Coordinator QC, and Subcontractor right way
BUILDING, all TANK (01, 02, 03, 04) Jetty area witness all of Electrical & Instrumen system and Sub system.
Re coordination START UP, PRE COMISIONING and COMISIONING system and Sub system Outside inspection Factory Acceptable test (FAT) and Make it report Inspection Release Note
(IRN)
Responsible for Material Incoming GRN or MRN “Good receive note “During MRIR “Material receive Inspection Report “.
Witness the material as per site requirement and make orders also check store. Witness the installation & Cable ladder, cable tray conection to Control room, Main Circuit Center ( MCC ), I/O ESD Cabinet, I/O PCS Cabinet, Generator, Compressor, Dry, Cooler, Transfer Pump, Metering SKID, Chemical Injection, Separator, industrial Oil Pump, Jokey Pump, Fire Pump system Transformer, gearbox against approved construction drawing. Witness all Inspection Test of all LV, MV cables, and other equipment E&I refer to the Test Pack’s or Work Pack’s
Pre commissioning from wellheads, Electrical power supply incoming from 33KV sub marine cables, main transformers 33/6.6KV. Dry trafo. ABB. Safety boats, H.V. transformer and switchboards provided by ABB. Low voltage switchgear ABB. Fire detection. Pre commissioning and Commissioning load and Soloran ( Un load) Motoric motor Pump 2 Period : February 2015 – May 2015 Arab Saudi IRAK U.A.E Company : Bureau Veritas at IRAK
Position : E&I Inspector
Client : Wheatherford
Job Description
Coordinate with construction, and Subcontractor right way Witness the installation & Cable ladder, cable tray conection to Control room, Main Circuit Center ( MCC ), I/O ESD Cabinet, I/O PCS Cabinet, Generator, Compressor, Dry, Cooler, Transfer Pump, Metering SKID, Chemical Injection, Separator, Crude Oil Pump, Flare, Knock out Flare, H2s Stripper Column, & gearbox against approved construction drawing. Updated :11/04/20164 / 11 CV JAKA MARTIN
Witness all Inspection Test of all LV, MV cables, and other equipment E&I refer to the Test Pack’s or Work Pack’s
Preparing weekly reports and forwarding to concerned Project Manager and Site Managers. To ensure Human Safety Environment Regulations applied in every steps of the E & I works 3 Period : June 2014 – January 2015 Cepu & UK Indonesia U.A.E Company : schlumberger
Position : QA/QC Engineer Electrical
Client/Owner : Exxon mobile, MCL
Project : Early Oil Expansion facilitator (EOE)
Job Description
Responsible for the entire project installations and it’s testing and commissioning work inspections from start to end of handing over.
Witness and Responsible for all Electrical and ELV installations as low & high voltage systems Power, Light, Emergency, Conducting, Wiring, Cable trays, Trunkings, RMU, Transformers, Risers, Panel installations, MDBs, SMDBs, DB dressings, Cable Glandings, Terminations, Cable pullings, ATS, Generators, Bus bars, Transformers, Switchgears, Lightning protections, Earthlings, etc.
Witness Verify the installation & Cable ladder, cable tray connection to Control room, Main Circuit Center ( MCC ), I/O ESD Cabinet, I/O PCS Cabinet, Generator, Compressor, Dry, Cooler, Transfer Pump, Metering SKID, Chemical Injection, Separator, Crude Oil Pump, Flare, Knock out Flare, H2s Stripper Column, & gearbox against approved construction drawing Coordinate with construction, and Subcontractor right way 4 Period : April 2013 – December 2014 Batam Indonesia Company : Citra Shipyards
Position : QA/QC Engineer Electrical
Project : SPOB, Tugboat, CPO, Tanker, FBSO
Job Description
Appreciate Trial Test SEA, DOCK Trial all functional equipment system Electrical & Instrumentation
Patrol Checking daily the installation cable & pipe connection to main engine & gearbox against approved construction draw
Safe and efficient operation of all electrical equipment and associated systems, including high frequency PMR work, documentation reporting and Log Keeping duties. 1st line maintenance, repair, inspection, fault finding on Power Generation and Distribution equipment ranging through High Voltage/Low Voltage/Extra Low Voltage Equipment throughout the Installation Topsides. The range of equipment includes, but is not limited to the following: Updated :11/04/20165 / 11 CV JAKA MARTIN
a) Power Distribution Systems including Emergency Power Generation, Switch gear, Motor Control Centers, Transformers, Motors, Cables, Battery Systems, Chargers and Associated Equipment. Critical Power Distribution.
b) UPS Systems, Battery Systems and Chargers and Associated Control Equipment. Witness / Conduct Inspection of all E&I device’s according to class, owner specification and Standards (Merger Test, Continuity Loop Check, High Potential Test (HIPOT)and load test 4 Period : July 2011 – July 2013 Indonesia
Company : NOK
Position : Senior Supervisor
Job Description
KICK OFF MEETING to operational start up. Responsible for: administration Quality, safety, planning and progress steps .Relations and co ordination. Roof access and any administrations involved. Final issue
Improvement Cost with system TCD and KPI
Coordinate with construction, and Subcontractor right way Preparing weekly reports and forwarding to concerned Project Manager and Site Managers. To ensure Human Safety Environment Regulations applied in every steps of the E & I works 5 Period : June 2010 – June 2011 Indonesia
Company : Flextronics
Position : Supervisor
Job Description
Full completion of routine tests: overload, over speed, less of running diodes, earth fault, Over current. 100% of setting tests of HV & LV breakers and switchgears components/ Battery charger
Preparing weekly reports and forwarding to concerned Project Manager and Site Managers. To ensure Human Safety Environment Regulations applied 6 Period : December 2007 December 2009 DOHA U.A.E Company : Mitsui Engineering & Shipbuilding Co. Ltd Position : E&I Inspector
Project : MAN B&W S50ME B
Job Description
Identify and Rectify any mislead documents regarding Electrical & Instrumentation Work as a team.
Coordinate with construction, and Subcontractor right way Witness material Carry Over raised by contractor due to material deviation and work out with Field Engineer to solve the problems.
Witness and Participate in Procedural test’s to all E & I Equipment's, such as: Loop Test, System running, Start Up.
Updated :11/04/20166 / 11 CV JAKA MARTIN
Coordination with subcontractor, main contractor when apply job what should be do before Start Up and Simulation Test.
Directly responsible to the Company Site Representative on all engineering, planning, commissioning, material and all other technical service essential to support the construction activities at the offshore Work site.
7 Period : April 2006 – April 2007 Batam Indonesia Company : PT.AEI (Angkasa Engineers Indonesia)
Position : E&I Inspector
Project : TANBURUP
Job Description
To arrange daily Electrical inspections with consultant after internal inspection of work. Witness the material received from the supplier to ensure that material are according to the specification & Offered the same for Consultant Approval and follow up with consultant till approval.
Coordinator QC, and Subcontractor right way
Pre commissioning from wellheads, Electrical power supply incoming from 33KV sub marine cables, main transformers 33/6.6KV. Dry trafo. HOLEC. Safety boats, H.V. transformer and switchboards provided by Merlin Gerin. Low voltage switchgear MITSUBISHI.HVAC. Fire detection.
Coordinate with construction, and Subcontractor right way
>> Confirm As Build Condition is Recorded, Prepare, Review & Sign of all outstanding record and issue Release Certificate within doc Completed Punch List, FAT Doc.Completions: Confirm As Build Condition is Recorded, Prepare, Review & Sign of all outstanding record and issue Release Certificate within doc Completed Punch List. Review & Verify with Client all works completed successfully and ensure that Report/Record as per Certification Requirements
Review & Compile All Field Electrical Record for Project Documentation. 8 Period : April, 2004P –December, 2006 Indonesia
Company : PT.SMOE
Position : QA/QC (Electrical & Instrumentation)
Project : TUNU, Kuba, KERISI WHP K Conoco Phillips at SMOE Indonesia, Job Description
Witness and Review Inspection & Test Plan (ITP), Review Electrical Layout, Dimensional Check, and Checked Fit – Up preparation, Visual Checked for Electrical & Instrument Support Installation, Megger Test, Continuity Test, and Function Test & Pressure Leak Test. Coordinate with construction, and Subcontractor right way 9 Period : 2002 – June 2003 Indonesia
Company : PT.YOSHIKAWA BINTAN
Position : Process Engineer
Project : Project APL KMZ, Hitachi
Updated :11/04/20167 / 11 CV JAKA MARTIN
Job Description
Utilities unit. 2 steam turbines driven ALSTOM alternators 25MW/15KV. Pre commissioning, Commissioning, start up and exploitation. Training of local operators Coordinate with construction, and Subcontractor right way REFERENCE
Name
1 STEVEN GOH
SR.MANAGER
+659******* and +628**********
Email: acudoe@r.postjobfree.com
2 IBNU ZIAD
QA/QC ASST MANAGER PT.CITRA SHIPYARDS
+628********* and Email: ibnu_ziad@cssgroup batam.com EDUCATION the Best Certificate Compilation (Could be seen on the below ) The Best Certificate Compilation (Could be seen on the below )
Bachelor Degree (B.Eng) University of Sriwijaya : Electrical Engineering GpA 3.02 scale 4.00
Institute Technology offshore : Electrical & Instrument Inspector
UNIVERSITY of SRIWIJYA Community : Electrical Engineering Organization
UL HAZAD : Hazardous Location And Equipment Protection
Institute Technology offshore : Welding Inspector
CSWIP 3.1TWI : CSWIP 3.1
KKNIAWS 1 : Welding Inspector Competition
Electrical train by Telkom.Tbk
Professional train DEPSOS : Electronic & Electrical
Pro safe RS Electric level 1 : Power Electrical Hazardous rate/level 1
Pro safe RS Electric Level 2 : Power Electrical Hazardous rate/level 2
H2S Hazed Electric Level 2 By OPITO
Welder Performance by RINA
Code of Business Conduct & Ethic
INSPECTION AS
E&I Inspector/ EEHA Inspector
HAZOD E&I, EEIHA
UL HAZAD Hazardous Location And Equipment Protection Updated :11/04/20168 / 11 CV JAKA MARTIN
AWS 1/ CSWIP 3.0 3.1/TWA 1/GEA 1/RINA/STA
Coating Chemical
CORQA 10 100508 Quality System Policy: Corrective and Preventive Action FOR STANDARIZATION / MANAGEMENT
ISO 2008 : 9001,9002,9004,14001
ISO TQM 17260,
INTENAL ISO 19011AUDIT
Coordinator5 S
Coordinator fire drill
CONTACT INFORMATION
Name : Jaka Martin
Education : B.Eng majoring Electrical Engineering
Place date of birth : Palembang 11th 01 1980
Nationality : Indonesia
Passport No : A7686133
Contact Person : +628**-******* or +628**********
Email : acudoe@r.postjobfree.com
Availability : Immediately
I declare that this curriculum vitae written based on the true. And I will be fully responsible for any false information given.
Sincerely Yours,
Jaka Martin
low Certificate Please see