Dick Stafford
Lagrange, GA Cell: 706-***-****
**************@*****.***
*******.********@******.***
Objective
To pursue a successful, challenging, and exciting career in systems turnover/commissioning, Electrical and Instrumentation Management, while being able to dispense my maximum potential to the benefit of the organization and, at the same time acquiring more knowledge and skills to improve myself and the livelihood of my family.
Introduction
I have extensive experience as Turnover Manager Industrial Electrical Manager, Electrician, and Instrument technician, Commissioning Manager, working in power plants, chemical plants, pulp and paper plants, steel plants, refineries, etc. In this time I have worked hands on to front line supervision. I am a strong liaison and worker for getting the job done safe, fast, and efficiently. I have outstanding communication skills, and committed to producing top quality work. I have a positive and upbeat attitude, and get along great with co-workers and management.
Qualifications
-Field Installation Expert -Excellent Written & Verbal Communication Skills
-Osha 10 Certified -Commercial and Industrial Electrician
-NCCER Certified + in multiple crafts -CPR for the Professional Rescuer
-Master Electrician -Experienced Employee Trainer
- Knowledge of Standard for Electrical
Safety in the work place
Experience
Jacobs Field Engineering Services
Methanex Chili Relocation Project April 2014 to Current
Commissioning/Turnover Manager:
Worked closely with Client Operations personnel to develop project pre-commissioning and turnover procedures using systems that will be used in the module fabrication facilities and at the jobsites.
Provided input to project process engineering in the establishment of system boundaries and participated in constructability reviews to ensure efficient pre-commissioning and turnover.
Developed organization charts for the pre-commissioning and turnover departments at the Methanex project location and ensured that the organization was properly staffed to execute their scope of work. Ensured that all personnel in the pre-commissioning and turnover department are fully trained in the procedures to be followed in the execution of their scope of work. Burners, Cooling Tower, Desuperheater, Eductor, Exchangers, Flare Stack, Reactor, Reformer, Refactory, SCR, Silencers, Tanks, Vessels.
The first plant, Geismar I, is expected to be operational by the end of 2014. The second plant, Geismar II, is expected to be operational by early 2016. The plants will each be capable of producing 1.1 million tons of methanol a year.
Turnover team details to follow; (project, scope/phase G1&G2, manpower, path-forward…)
Duties and Responsibilities:
Lead and managed specialist personnel to provide a planned, documented and manage engineering approach to the start-up, commissioning and turnover of facilities, systems, and equipment to the end-user, resulting in a safe and functional environment that meets established design requirements and stakeholder expectations. Developed commissioning and start-up plans and procedures to assure conformance to company guidelines and practices. Understood the formal design record documents and location / accessibility. Developed and monitored status reports prepared by commissioning personnel and modified schedules or plans as required and needed. Coordinated and/or attends design, construction, commissioning, start-up and qualification meetings. Identified owner’s goals, needs, and expectations for building operation and function; identified the commissioning responsibilities.
Jacobs Field Engineering Services
Turnover E&I Commissioning Manager
Freeport McMorran Copper and Gold Mine
September 2013 to April 2014
55K Metcalf Expansion Project – 68,000 mtd crushed-ore leach pad and stacking system; a low-grade run off mine leaching system: four solution extract (SX) plants; and three electro winning (EW) tank houses producing copper cathode.
Duties and Responsibilities:
Duties cover inspection at all phases of construction, equipment installation, mechanical completion, commissioning and operations as they relate to E&I discipline. Supervised and coordinated all the shutdown activities engaged in both Electrical and instrument removal & installation and ensure compliance with overall quality, safety, and environmental standards. Equipment data collection and inventory to build and hold full technical and maintenance data on all equipment which fully reflect the actual condition and whereabouts of all installed equipment. Established close communication and teamwork with other disciplines to endure overall successful completion. Coordinated with the preservation/maintenance supervisor to ensure proper protection of electrical and controls equipment. Closely worked together with E&I construction personnel and vendor representatives on all matters related to platform control system.
Jacobs Field Engineering Services
November 2011 to 2013
E&I Manager
Led Jacobs electrical team during construction, commissioning and operation to assure agreed targets are achieved, written corporate safety and environmental guidelines in all Rayonier mill areas, managed construction and troubleshooting of plant process control systems.
Southern Company Construction
2009 to 2011
Start-Up/Turnover E&I Commissioning Lead Tech
Performed functional check-out, calibrations, and commissioning of systems and instrumentation related to the power plant field. Created, updated, and managed all associated documentation including Red-lining prints, QAQC, and SOP.
BE&K Construction
2008 to 2009
Electrical Superintendent
Overseen Electrical crews as they installed, operated, and energized breakers, transformers, switchgears, disconnects, and other related substation equipment. Overseen all conduit installation, control wiring, and cable pulls. Maintained time sheets and production records. Inspected electrical systems, equipment, and components to identify hazards, defects, and the need for adjustment or repair.
Fagan Inc.
2005 to 2008
E&I General Foreman
Managed trouble shooting, diagnosing, repairing, and maintenance of plant electrical distribution. Determined priorities and completed assignments timely. Provided immediate feedback to crew and production personnel. Supervised on-site contractors and assisted in project planning.
PCE Construction Inc.
2003 to 2005
Electrical General Foreman
Supervised all electrical activities of PCE including installation of various electrical equipment. Tested and commissioned all newly installed E&I equipment.
Conaway Electrical, Inc.
1997 to 2003
Leading Electrician-Foreman
Responsible for installation, maintenance, troubleshooting, and repair of PLC’s, and other electrical equipment. Planned and laid out the installation of electrical wiring, equipment, and motors.
Education
NCCER Certified plus as an Industrial Electrician and Instrument Technician.
West Georgia Technical College certificate in electronics
OSHA 10 hour Awareness certificate
Nebraska State Journeyman Electrical License
Tyco Electronics Certificate for MV cable preparation
Electrical & Instrumentation Master Trainer certified
Twic Card Holder
WinPcs and Orbit Controller
References:
Rick Fiegle 409-***-****
Randall Cave 912-***-****
Robert Arnold 912-***-****
Phil Calderon 912-***-****
Larry Klutz 912-***-****
Lewis Garner 770-***-****
Jim Howard 662-***-****
Jim Robertson 850-***-****
Have a valid passport, willing to relocate and willing to travel.