Post Job Free

Resume

Sign in

Engineer Electrical

Location:
Hanoi, Vietnam
Posted:
April 13, 2016

Contact this candidate

Resume:

CURRICULUM VITAE

PERSONAL DETAIL

Full Name: LE MINH HIEN

Contact Number: +84-986******

Email adresses: acucaa@r.postjobfree.com

acucaa@r.postjobfree.com

Date of Birth: August 10th, 1977

Gender: Male

Marital Status: Married

Address: 65 Road #3, Living Quarter #9,

Truong Tho Ward, Thu Duc Dist.,

Ho Chi Minh City, Vietnam

POSITION APPLIED

Senior Instrumentation Engineer

CAREER SUMMARIES

From April 2015 to present: SAMSUNG ENGINEERING

The main Contractor for SAMSUNG ELECTRONICS CE COMPLEX PROJECT (SEHC)

Saigon Hi-Tech Park, Ho Chi Minh City, Vietnam

Senior Electrical - Instrument & Controls Manager

From May 2013 to April 2015: DAELIM – SOJITZ CONSORTIUM

The Main Contractor for O Mon Thermal Power Plant No. 2 Project (330 MW)

Located in Can Tho City, Vietnam

Senior Electrical – Instrument& Controls Engineer

From Apr 2011 to May 2013: JOHNSON CONTROLS SERVICE VIETNAM CO., LTD

THE AMERICAN GLOBAL REAL ESTATE FIRM/ ASIA PACIFIC REGION

Operation Manager

Global WorkPlace Solutions – Building Efficiency

From May 2010 to Apr 2011: JONES LANG LASALLE VIETNAM CO., LTD

THE AMERICAN GLOBAL REAL ESTATE FIRM/ ASIA PACIFIC REGION

Engineering Manager

Integrated Facilities Management (IFM)

From Mar 2009 to Mar 2010: SAMSUNG ENGINEERING

The Main Contractor for INTEL PRODUCT VIET NAM (IPV)

Electrical - Instrument & Controls Engineer

From June 2007 to Feb 2009: DUNG QUAT REFINERY PROJECT (PETROVIETNAM)

THE MAIN CONTRACTOR FOR TECHNIP CONSORTIUM (TPC) composed of TECHNIP FRANCE, TECHNIP GEOPRODUCTION(M) SDN BHD - MALAYSIA, JGC CORPORATION – JAPAN and TECNICAS REUNIDAS – SPAIN

Electrical Quantity Surveyor – Subcontract Management Department

From Sep 2005 to May 2007: PETRONAS (VIETNAM) CO., LTD.

GO DAU LPG TERMINAL

Project Engineer (on behalf of the Owner) and HSE Officer

From April 2003 to Sep 2005:TRANSOCEAN DEEPWATER DRILLING INC.

VUNG TAU OFFSHORE OIL DRILLING & EXPLORATION

Electrical & Instrument Maintenance Engineer

From Apr 2001 to Mar 2003: LILAMA CORPORATION.

Electrical & Instrument Site Supervisor

PROFESSIONAL EXPERIENCES

April 2015 to present: Senior Electrical – Instrument & Controls Manager

SAMSUNG ENGINEERING COMPANY LIMITED

Accountabilities:

Being in charge of all Electricals & Instruments for Process, Utilities and Clean Room installation works as such Humidity & Temperature controls, Pressure controls Flow controls, PLC & SCADA systems.

To prepare the construction schedule for E&I works

To prepare the Inspection & Test Plan for site construction quality controls

To take implementation of all Electrical & Instrument works for all manufacturing buildings from Installation to Inspection, Testing and Commissioning

Supervision of Subcontractors scope of work for Electrical – Instrument& Controls

To coordinate with Engineering Design team for drawing & document approvals

Control all site inspections for Electrical, Instrument& Controls systems as QA/QC engineer

Coordinated with Vendors/ Suppliers for final installations

Prepared documents for Pre-commissioning & Commissioning Activities

Prepared the final documents for handing over.

Attended weekly meeting with Electrical & Instrument Sub-contractors

Verified the construction progress quantities submission from Electrical & Instrument Subcontractors for proceeding with the progress payment claims

Project name: Samsung Electronics CE Complex Project

Located in Saigon Hi-Tech Park, Ho Chi Minh City, Vietnam

April 2013 to April 2015: Senior Electrical & Instrument Controls Engineer

DAELIM – SOJITZ CONSORTIUM

Accountabilities:

To prepare the construction schedule for E&I works

To prepare the Inspection & Test Plan for site construction quality controls

To take implementation of all Electrical & Instrument works for the whole Thermal Power Plant 330 MW from Installation to Test & Inspection

Supervision of Subcontractors scope of work for Electrical & Instrument Controls

To coordinate with Engineering Design team for drawing & document approvals

Control all site inspections for Electrical, Instrument Controls & Fire alarm systems as QA/QC engineer

Coordinated with Vendors/ Suppliers for final installations

Site Design Modification submission to Consultants & Client

Prepared documents for Pre-commissioning & Commissioning Activities

Closed out the Non Conformity reports (NCR)

Prepared the final documents for handing over.

Attended weekly meeting with Electrical & Instrument Sub-contractors

Verified the construction progress quantities submission from Electrical & Instrument Subcontractors for proceeding with the progress payment claims

Project name: O Mon Thermal Power Plant No. 2 Project (330 MW)

Located in Can Tho City, Vietnam

April 2011 to May 2013: Operation Manager

JOHNSON CONTROLS SERVICE VIETNAM CO., LTD

Accountabilities:

To implement the Commercial contract between the Client and Johnson Controls ensuring that all Financial & Operational SLA objectives, Reporting Requirements, Scorecard targets and similar are achieved in full

Drive and Lead the operation team to ensure that the above objectives are achieved in the most efficient and professional manner

Identify opportunities to increase revenue & margin through scope increases, project opportunities, and engagement of other Johnson Controls solution offerings (Eg. Energy, WorkPlace etc

To develop, manage and implement Facilities Management Service delivery, maintaining operational and commercial compliance with the Client and Johnson Controls’ expectations, with day-to-day responsibility for the delivery of Facilities Management operations

Financial Management:

Ensure all required financial reports are created to support the Budget process.

Own and optimise the billing and collection process for all service lines to meet appropriate performance levels

Track and analyse trends with the operating costs to identify operational cost reduction opportunities in order to deliver and exceed savings against contractual targets.

Ensure a cost effective Maintenance program for all buildings, plant, systems and equipment is in place

Responsible for the Profit and Loss performance of the Account

Client Management:

Develop and maintain a close working relationship with the local client

Communicate and promote company-wide offerings and expertise, to deliver a single seamless service to the Client

Prepare Business Proposals/Business Cases for presentation and submission to the Client

Demonstrate a solid understanding and application of the Commercial Contract

Maintain regular communication and engagement with the Client to ensure the value Johnson Controls is adding to their organisation is visible

Provide pro-active professional advice to the Client on Facilities matters

Manage Client expectations through documented Monthly Performance Reviews

People Management:

Conduct formal Bi-Annual Performance Reviews on all permanent Employees

Conduct Disciplinary discussions with Employees as required (working with Human Resources)

Work closely with the Human Resources department on staffing strategies (eg. Recruitment approaches, structure of the team, miscellaneous requirements)

Encourage participation of team in the Global Employee Survey

Ensure that all Account Employees comply with the Ethics Policy at all times, and ensure 100% completion of the Annual Certification

Occupational Health, Safety & the Environment:

Monitor Account Safety performance

Ensure timely reporting of near misses, incidents, deficiencies etc

Ensure reporting requirements associated with near misses, incidents etc are met

Ensure necessary corrective actions are implemented within the required timeframes

Ensure Employee, Contractor and Visitor adherence to Safety and Environmental policies

Participate with the Client in Safety and Environmental programs/strategies (and identify and pursue opportunities for Johnson Controls to add value to these)

Conduct regular Safety Audits

Ensure site Inductions and Contractor safety requirements are met at all times (including Contractor Inductions etc)

May 2010April 2011: Engineering Manager

JONES LANG LASALLE VIETNAM CO., LTD

Accountabilities:

To manage comprehensive engineering and facilities management services

A team player and work with other members of the team to meet all key performance indicators as set out in the management contract.

Responsible for supporting site facilities operation.

Establish Engineering & Operational procedures and roll out for site staff

Responsible for delivery of services in accordance with client’s Management SLA

Ensure compliance with all governmental regulations

The single point of technical issues.

Managing all contract vendors to carries out technical audits/ maintenance for all installation as schedule

Developing the technical service standards for Integrated Facilities

Provide solutions for technical issues

Initiate a system to measure the quality of performance on a quarterly basis

Initiate Preventive Management Program

Responsible for Early involvement in Facilities Operation and provide advisory service during Site Inspection and Project Development

Ability to troubleshoot equipment fault

Doing the communication within the organization and with the client.

Continuous improvement in the following

Morale and satisfaction of employees under management

Client satisfaction

Improvement and savings initiatives for the client as well as Jones Lang LaSalle

Clients:

Intel Vietnam

Procter & Gamble

Nokia

Yahoo

FPT Software

IBM

March 2009 to March 2010: Electrical - Instrument & Controls Engineer

SAMSUNG ENGINEERING COMPANY LIMITED

Accountabilities:

Being in charge of all Electricals & Instruments for Process, Utilities and Clean Room installation works as such Humidity & Temperature controls, Pressure controls Flow control, PLC & SCADA system.

Supervised the Building Management System (BMS) including Fire alarm & IT works

Control all site inspections for Instrumentation, IT, Securities & Fire alarm systems as QA/QC engineer

Coordinated with Vendors/ Suppliers for final installations

Site Design Modification submission to Consultants & Client

Prepared documents for Pre-commissioning & Commissioning Activities

Closed out the Non Conformity reports (NCR)

Prepared the final documents for handing over.

Attended weekly meeting with Electrical & Instrument Sub-contractors

Verified the construction progress quantities submission from Electrical& Instrument Subcontractors for proceeding with the progress payment claims

Project name: Intel A9/T9 - Assembly, Test & Manufacturing (ATM) Project, Lot 12, Saigon Hi-Tech Park, District 9, HCMC, Vietnam

June 2007 to February 2009: Quantity Surveyor

TECHNIP CONSORTIUM LEAD BY TECHNIP FRANCE

Accountabilities:

Being in charge of checking, quantifying and approving all Electrical Quantities installations for the whole Dung Quat Refinery as follows: Grounding/Lightning System, Equipments Installation, Cable Pulling, Cathodic Protection System, Lighting System, Cable Tray-Ladder-Conduit and Support System Installation for all Electrical Subcontractors

Accessed in the Project Database such as electrical Subcontracts, issued for construction (IFC) drawings, supporting documents and materials status to make the comparison between contractual initial Bill of Quantity & final actual Bill of Quantity on site

Drawing quantities take-off.

Coordinated with the person in charge of assigned Zones such as Construction Managers, Superintendents and Supervisors to trace out the variation quantities those not in the scope of work of Subcontractors

Coordinated with Field Engineers to have updated (latest revision) drawings and documents which are related to the site construction status

Attended weekly meeting with Electrical sub-contractors

Negotiation with subcontractors and do processing correspondence exchange between subcontractors on daily basis

Verified the construction progress quantities submission from Electrical Subcontractors for proceeding with the progress payment claims and invoicing.

Issued the final closed-out Bill of Quantities and Price Schedules of all Electrical Packages and Purchase Orders.

Reports to Subcontract Deputy Manager and Subcontract Manager

Project name: Dung Quat Refinery (DQR)- Dung Quat Economic Zone, Quang Ngai Province, Vietnam

September 2005 to May 2007: Project Manager (on behalf of the Owner) and HSE Officer

PETRONAS (VIETNAM) CO., LTD - GO DAU LPG TERMINAL

Accountabilities:

Approved all proposal drawings, milestone schedule, manpower and materials on site

Seeking, evaluating contractors, sub-contractors and suppliers, negotiation to deal with appropriate offers

Evaluated and requested manpower of contractor and sub-contractor for doing task on site coincided with safety briefing and security controlling for new workers.

Checking and carrying out requisitions and instructions from Board of Management or main contractor according to scope of works approved the bill of quotation for additional work if out of contract scope.

Organized weekly meeting with contractor and sub-contractors

Supported contractor’s staff to make: shop drawing, as built drawing and QC documents for testing, commissioning and hand-over.

Co-operated with contractor to solve unexpected problem on site

Final checked on all the systems, which were concerned about instrumentation, pipe line, pneumatic and electrical equipments etc… before starting up.

Liaised to the Local Authorized of Electricity Company for getting the permission to hook up and turn on power supply for LPG terminal electrical system

Liaised to the Local Fire Bureau for checking and granting operation license for fire alarm & fire fighting system and co-operated with them to train workers on fire fighting, fire drill.

Co-operated with contractor to run all licenses those concerned about Local Authorities Department for the whole LPG Plant

Approved the project progress payment claim for contractors

Setting up the HSE procedures based on the Company standard and policy

Project name: The Engineering, Procurement, Construction and Commissioning (EPCC) of Additional Facilities and Upgrading Existing Facilities at LPG Terminal, Go Dau Industrial Zone, Long Thanh District, Dong Nai Province, Vietnam.

2003 to 2005: Electrical & Instrument Maintenance Engineer (Drilling Jack-up Rig Electrician)

TRANSOCEAN DEEPWATER DRILLING INC

Accountabilities:

To ensure all Electrical equipments on the drilling rig working properly and safely in order to limit the downtime due to Machineries breakdown, Equipments malfunction or Black out.

Performed the daily, weekly, monthly and yearly of Electrical Preventive Maintenance tasks

Assisted the Chief for setting up the maintenance plan on drilling rig

Carried out preventative break down and condition based maintenance, inspection, faultfinding, plan modification & equipments testing

Recorded results in the computer based maintenance management system (EMPAC)

Acted as competent person for the isolation of electrical equipments

Participated in the Emergency Response organization according to the company Emergency Response Plan

Ensured all hazards, faults and troubleshooting are recorded and solved then reported to the Chief

Liaised on a regular basis with the Chief of operators advising on spares and material requirements

Coordinated with Mechanical section to keep maintaining all machines run smoothly

Working in a multi-cultural organization

Drilling Rig names:

-Jack-up rig Trident 12

-Jack-up rig Trident 17

-Petronas Carigali Oil well Platform

2001 to 2003: Electrical & Instrument Supervisor

LILAMA CORPORATION.

Accountabilities:

Collected materials for bill of quotations and installing works.

Requested manpower and material for task on site according to schedule of work

Making shop drawing, as built drawing, document that submitted to consultancy and client for approval and works done hand-over.

Making and managing schedule of work

Managed worker teams and third party personnel in order to carry out works on time of proposal schedule and safety on site

Prepared for testing and commissioning tasks

Attended weekly meeting and making reported on site to the Board of Management.

Controlled punch list and performed maintenance services after finishing project and hand-over.

Project name: MDF Fiberboard factory, An Khe, Gia Lai province, Vietnam

QUALIFICATIONS

Bachelor Degree in Electrical Engineering 2001 - University of Industrials and Engineering; Major: Automation and Electricity Supply

Certificate of Electrical course on Operation, Control and Troubleshooting for VARCO Top Drive system held at Varco Technical Education Center Singapore – July 2004.

Certificate of Electrical Equipment in Potentially Hazardous Areas held at Aberdeen Skills and Enterprise Training Limited (ASET) Johor Baru, Malaysia – May 2004

Certificate of English Level C – 2001

Helicopter Underwater Escape Training (HUET) and Basic Offshore Safety & Emergency Training (BOSIET) Course held at NUTEC Offshore Safety Training Center Vung Tau City, Vietnam - January, 2003.

REMUNERATION

The expectation salary: Net USD/month

Allowance will be followed the Company regulation



Contact this candidate