Post Job Free

Resume

Sign in

Project Manager Construction

Location:
New Iberia, LA
Posted:
April 11, 2016

Contact this candidate

Resume:

Calvin Doucette

*** ****** ******

New Iberia, La 70560

Home 337-***-****

Cell 337-***-****

Email acubdg@r.postjobfree.com

PERSONAL RESUME OF CALVIN DOUCETTE

Summary of Experience

Over twenty (30) years of construction experience.

Proficient as a CWI, coating inspector and NDE auditor both on and offshore.

As reflected in my resume I have worked as an inspection for all the major oil and gas companies,

Acquired inspection skills through education and company affiliations, which include Shell oil, Chevron USA, Chevron Texaco, Chevron pipeline Co. Marathon oil Co. BP, Consumers Energy, Energy Transfer Co. Kinder Morgan, Boardwalk pipeline, Elpaso Energy, Exxon Mobil, Columbia Gas, and Williams Midstream. Enterprise product co.

Education

Jonas Henderson High School New Iberia, La 70560

Associate Degree Culinary Arts, Henry Abbott Tech., Danbury, Connecticut

Evangeline Area Vocational School Welding Technology Saint Martinsville, La.

Ultrasonic Services Inc.; Forty hours NDE Course, i.e., Radiographic Film Interpretation. Magnetic Particle, Dye Penetrant and Radiation Safety.

X-ray Inspection Inc. Ten (10) hour Course in Radiation Safety

Real Education Service, Inc.; Forty (40) hours Welding Inspection Course; Instructed by Gerald Taylor.

NACE International coating inspector # 7756 (Current) Exp. 3-30-17

AWS CWI # 93030131 (current) Exp. 3-1-17

ASNT LEVEL ll # 141112 (current) Exp. 4-1-17

NCCER National registry Certified (written) for AOCs General pipeline

TWIC Exp. 2018

Present Employment

Quality Integrated Services (QIS)

P O Box 1950

Guymon, OK 73942

Enterprise Product Co.

Capital Project Inspector

Duties include. Witness welder qualification,

Overseeing construction activity at the TETPL meter station that to include below ground pipeline and above ground interconnecting piping in meter station.

Other project

Gas Theater project. Degasser unit project.

DCP-Y grade meter station Phase l and ll, LEC 3 includes ten Meter skids Packages installation.

Monitoring Spool pipe fabrication for the OTI Feed/Loading Project.

Construction activity’s also includes monitoring site civil work, verify slump on concrete,

Monitoring equipment installation, verifying piping and valves are per P&ID prior to operation PSSR walk through...

Monitoring welding activities and to include radiograph film review;

Monitoring sand blasting and coating as well.

2011-2014

Present employment

RCI Consultants, Inc.

201 Rue Iberville suit 302

Lafayette, La. 70508

Williams Midstream

Gulf Star FPS Deep Water Project

Senior Project Field Coordinator

Duties include monitoring and verifying fabrication fit ups, welding and sand blasting/coating activity.

Verifying documents for compliance, Radom Radiograph audit as per William Midstream FPS construction Specification.

2010

Kestrel Engineering, Inc.

9601 Jones road STE 242

Houston, Texas

Project

NiSource Gas (Columbia Gas)

Transmission & Storage

Compressor station up grade

Sr. project Inspector II

Monitoring construction activity at Compressor station and meter stations.

Duties include civil, excess road up grade. Compressor installation, Monitoring welding and coating, reviewing and monitoring NDE activities.

Maintaining communication by reporting daily and weekly construction activity to the project engineer.

2010

Universal Pegasus International

Construction and Inspection Service’s

4848 loop central drive

Houston, TX. 77081

Construction Supervisor

BP US pipeline Project

White oak to Manhattan (ILI) in line Inspection project, Manhattan, IND.

Duties: Supervising the repairs on the White Oak product lines, and to include monitoring welding and coating and installation of clock springs as directed per work order.

Mustang Engineering

Park ten place.

Houston, Texas 77084

2010

Energy Transfer co. (ETC)

Construction Supervisor

Fayetteville Express Pipeline (FEP) Meter Stations.

Duties: Assigned to supervise the fabrication and welding of spool piping,

Duties also included Documenting monitoring sandblasting and coating, material verification per MTR, weld mapping and Redline drawings as directed to the three meter stations assigned to, ANR, Trunk line and Texas Gas.

2009-2010

OMC International

PO Box 941233

Houston, Texas

Construction Supervisor

Duties:

Monitoring the double joint welding Activities on Energy transfer one hundred eight mile 42” Tiger pipe line project at Berg pipe and steel Panama, City Fl.

Duties also included Documenting NDE and welding Activities and report results to the project Manager.

2008 2009

Mustang Engineering

16001 park ten place

Houston, Texas 77084

Construction Supervisor Kinder Morgan Midcontinent Express Pipeline

250 mile coating and double joint project on 30” and 36” line pipe’

Duties: NDE auditor of welding and coating Activities on the above project at the Bayou Company’s double joint facility at the port of Iberia New Iberia, La.

Duties also include assisting the coating inspector during coating operation.

Also reporting end results to the project manager.

After Double Joint project was completed I was assigned to the Midcontinent express pipeline as a Sr. welding inspector supervising the welding inspection team.

2008

Englobal Inspection Service, Cleveland, OK.

Sr. welding inspector

Gulf south pipeline co. (Boardwalk 42” pipeline project Meridian Ms.

Duties: Supervising the inspection team and assigning welding inspectors duties on the 42” pipeline.

Duties also included preparing and recording documenting as directed by the project chief inspector

2008

Englobal Inspection Services

Construction Supervisor

SNG/ELPASO D.R. HORTON DELVELOPMENT 20”, and 24” MAIN LINE REPLACEMENI

Duties: Overseeing construction operation on relocation of two (02) 20” and one (01) 24” pipeline.

Duties also documentation updating drawing as direct and reporting to the project manager

2007

Construction Supervisor

SNG/ELPASO 22” N. MAIN ABANDOMENT & REPLACEMENT PROJECT

Duties: Supervising welding and coating road bore activities and final pipeline tie in. Also monitored the fabrication and testing of the pig Launcher/receiver and valve assembly.

I also work did all red lining and as built drawings and project documentation.

SNG/EL PASO PIPELINE INTEGITY PROGRAM

Duties: Welding inspector over seeing welding operations on the 24” north main pipeline also worked red lining and as built drawings...

2006-2007

MBF SERVICES

BP PIPELINE LAPORT, TX

30” PIPELINE REMEDATION PROJECT

Duties: Construction Supervisor over seeing pipeline replacement.

CHEVRON PIPELINE CO. EMPRIE TERMINAL UPGRADE

Ditties: construction supervisor over seeing new construction after hurricane damage

OCI

SOUTHWESTERN ENEGRY 8” & 10” PIPELINE

Angeline County pipeline project

Duties: Welding inspector, visual inspection of completed welds working with x-ray assuring radiographic film and weld quality, documenting and maintaining weld traceability records on the pipe line and tie end assemblies.

2004-06

Durham Inspection Service Inc.)

Quality Control Inspector:

Beaird co. Shreveport, La.

Vestas Inc. Buffalo Gap, Maple Ridge three hundred and thirty five 80 meter wind tower project. (Second project)

Duties: Supervising sandblasting and coating, assembling, final Inspection, documenting results and preparing project documentation on results and sigh off on travelers prior to shipping.

Durham inspection (first project)

Visual inspector

Duties were supervising fabrication and welding and to include visual inspection of welds, calculating weld size, documenting results per project procedure and specification.

2004

Cleveland Inspection Service

Construction supervisor

42” Pipeline Remediation Consumers Energy Co.

Duties included monitoring the following: Ditch excavation and back filling. Purging pipeline. Removing and replacing corrosion section, Monitoring welding and witnessing hydrostatic testing per Consumers energy procedures and spec.

2004

Offshore Consultants, Inc.

Sr. Inspector, ExxonMobil Kizomba Tieback project.

Duties included Monitoring the application and inspection of the following coating process

Three layer polyethylene coating, ( TLPE ) PUF and Polyethylene Jacket coating, Line pipe internal coating

Duties also included supervisoring a second shift twelve man inspection team working with Bredero Shaw quality control department assuring that inspection and testing are as per specification and quality plan.

2004

Cleveland Inspection Service

Cleveland, Ok

Company Rep. Consumer Energy 20” pigging Facility installation,

Duties included coordinating construction activities with contractors and compressor station supervisor.

Duties also included welder qualification testing, welding and coating inspection,

2004

Petra Consultants Inc.

Chevron Texaco

Construction supervisor.

Over seeing Duel 4” pipeline installation, duties included welding /coating inspection both onshore and offshore.

2003

Cleveland Inspection Services

Welding/coating inspector working for Consumers Energy Co on the 36” pipeline Remediation project.

2003

Trinity consulting & inspection Inc.

Welding and coating inspector on the Marco Polo pipeline project.

Duties included testing welder per job spec. for the SCR, and monitoring the heat control on the computerize ALX System on the 16” 18” & 24” SCR.

2001-2003

On & Offshore Quality Control Specialists, Inc.

P.O. Box 911 Austin, TX. 78787

Southern Natural Gas an ElPaso Co.

Welding/coating inspector on pipelines, locations, Bessemer, AL. Meridian, and Ms. Gordo, Al. Roberta, Ga.

Chief Inspector, over seeing Fabrication and insulation of production equipment at Southern Natural Gas Pumping stations located at (Franklinton La. Selma, AL. Tarrant, Alabama.

Duties are to include over seeing construction, excavation, trenching, and demo of abandon piping insulation and testing of new fabrication.

Supervising a three (03) man inspection team that included NDE processes X-ray UT, and MT. Hydrostatic testing and electrical components as per scoop of work provided in contract.

Also as Chief inspector duties included documenting, and as built and red lining construction drawings.

This is to include piping and electrical, coordinating work schedule and reporting as directed to construction coordinator and project manager.

2001

Petra Consultant Inc.

Chief Inspector:

Chevron USA High Island Block 272 8” pipeline and risers installation.

Engineer G. Olivier Chevron USA

2001

Competitive Management Systems Inc. (CMSI)

AGIP King Kong Project, Vessel and Skid package

Coordinator site representative, Fabrication inspector. Witness Testing of subsea component

Working under the direction of the project manager Ray Neheuus (Alliance eng) John Hebert and Leonard Moore P.E. ( CMSI )

2000-01

Noble Denton inspection services

CVA (Certified vercation agent) Representing (AMOOE) Trinidad Oil Company Osprey project, Jacket and deck

Fabrication at Twin Brothers Marine (TBM) and Gulf Island Fib. (GIF)

-2000

COMPETITIVE MANAGERMENT SYSTEMS INC. (CSMI).

2000

Power Performance Inc

Company Representative and Site Inspector over seeing construction of topside and sub sea equipments for Amerada Hess corp.

1999 Inspector

Duties included monitored the fabrication welding and hydrostatic testing and coating of production equipment’s to include piping and pressure vessels for offshore production for Oceaneering Inc.

1999

Power Performance

Project Manager

Duties included project scheduling, supervising the coating of the 2” and 4” flow line piping at bayou piping coating. Supervise the fabrication and welding of the 4' & 2” riser of Global pipeline port of Iberian. Duties also included supervising the installation of the above 4” & 2” line on Global lay barge pipe liner five.

1998-1999

CMSI

Exxon Diana Project – Site Inspector

Supervising fabrication, welding and testing of the production equipment's (vessels and interconnection piping)

1997

Global X

RAY, Inc.

UPRC, Ship Shoal 105/126 Project, 10” Gas Line 6” Flow line & 4” Condensate Line Installation

Construction Supervisor: Responsibilities monitoring the coating a bayou pipe coating; testing welding per wps, monitoring welding and pre

Fab of pipe stalks at Global Industries in Houma, La. per API 1104. Monitoring the spool up of twenty

seven (27) stalks of 10" pipe at 1700’ per stalk, seventeen (17) stalks of 6” pipe at 1700’ per stalk and twenty

Seven (27) stalks of 4” pipe also at 1700' per stalk into the spool reel on the Lay Barge Chickasaw. Offshore duties included monitoring the jointing of stalks for each pipeline above and monitoring the jetting and sand bagging at the sub

Sea and pipeline crossings. Witnessed the hydrostatic testing de

Watering and nitrogen purging of the above pipelines and final assembling at the sub

Sea tie in.

1996

V.I.E.W. INC.

Pennzoil Exploration & Production Co. Sea Robin Project Duel 48” x 225’

Twelve-Barrel Slug Catcher

Construction Supervisor /Chief Inspector

Responsibilities included supervising a four- (4) man inspection team to monitor the pre heat on the X65 material, dimensional inspection of fit-ups. Monitored the welding and fabrication of the interconnection piping, on site inspection of blasting and coating. Maintained material traceability. Traceability of welding and X-rays, witnessed weld repairs per procedures stress relief of welds, final inspection. Hydrostatic testing, daily work reports and weekly updates to project manager.

1996

Shell Oil Inc.

Welding Inspector

Enchilada Project.

Duties and responsibilities.

On site Project Manager & Site Inspector: Monitored the welding fabrication and assembling of eighteen (18) pressure vessels skid assembly and one (1) twenty four (24) slot inlet manifold. Responsibilities included maintaining material traceability dimensional Inspection, monitoring weld quality per WPS, witness assembling and hydrostatic testing and onsite inspection of coating application.

Shell Oil Inc. Enchilada Project, Deck

Site Inspector: Responsibilities included witnessing dimensional fit up on interconnecting piping and structure beams, deck leg, Verification of drawing approval. Monitoring welding processes and heat control. Worked with certified verification agent on material and weld Traceability. Witness hydrostatic testing of interconnecting piping. Monitored sand blasting and coating.

1995

Competitive Management Systems, Inc. (CSMI)

Construction Supervisor: Client Representative, responsible for monitoring fabrication construction, welding quality, welding procedure and qualification reports, non

Destructive testing, material verification, reviewing AFE drawing, all testing and Traceability in conjunction with the project. Hands on training experience, involving, piping, pressure vessels, process equipment, spool piping, rotating equipment, pipelines, and coating, to include installation and hook

Up activities. Working knowledge of API, ANSI, ASME, AWS and ASTM Codes.

1994 CSMI Projects

UNOCAL/MOBIL (Sub Sea and Production Equipment)

Site inspector (Bagwell Brothers) monitored the welding fabrication and testing of one (1) sub

Sea control panel at FMC Houston, Texas. One (1) 72” OD x 12' Slug Catcher.

1995

Fluid Crane

One (1) 20'x 12'Lact Pump Skid with piping and Pig Receiver.

Gulf Coast Marine, Inc.

Monitored the fabrication and welding of the interconnecting piping. Witnessed hydrostatic on the above as directed by the Project Manager. Maintained all material, welding and x-ray traceability.

1995

British Petroleum (Pompano VK0989) & Enserch Garden Banks 388

Sub-sea Well Heads & Jumper Systems

Site Inspector: Monitored the manufacturing of four (4) sub

Sea weld heads (BP) and six (6) sub sea well heads with jumper systems and assemblies (ENSERCH) at Cooper Industries, Ville Platte, Louisiana. Responsibilities included verification of drawing approval, WOR’s POR’s MTR’s, weld repair procedures, NDE procedure and personnel records, raw material forging, and rough

Out process heat treat process (hardness check), inlaying process, stress relief process, finish machining, dimensional inspection. Bore pressure tests, test reports and certificates. Weld on casing extension, stress relief of welds, blasting and protective coating, nameplate, final inspection, manufacturer's and vendor's data books and preparation for shipment. Daily work reports and weekly project updates were forwarded to the Project Engineer.

1994

Enserch (Garden Banks 388) Expedite: Manifold skids (Baggwell Brothers, Inc.) Slug Catcher (Omega Service, Inc.); Vent Scrubber Skid (Seawolf, Inc.) Pig Launcher and Receiver and Lact Pump Skid (Dynamic Industries, Inc.) Downstream Treating (General Fab. Inc.) In conjunction with the Garden Banks 388 Project.

SAIPEM (Mobil Expansion Project)

Monitored the construction of two (2) 24" OD Riser with accessories for offshore project at Dynamic Industries, Inc. and their transportation to Twin Brothers Marine Inc., relevant to the GY Platform, Mobil Unit Expansion Project.

1994

PG & E (West Cameron 315)

Monitored the construction of a 72” OD Caisson Well Protector for West Cameron 163, Well #3 and a 48" X 60’ Caisson for West Cameron BLK 315.

1994

Phillips Petroleum (Garden Banks 70/71)

Monitored the coating and load out of 141,000’ (2306 tons) 6

5/8" 32

71# (.500), 4000’ (15 tons) two (2) 2 3/8” 7.46# (.344). 356.000 (893 tons) 2 3/8” 5.02# (.218) and 17.000' (87 tons) 3 1/2" 10.25# (.300) of line pipe, relevant to Phillips Petroleum Garden Banks 70/71 Project at Bayou Pipe Coating, Port of Iberia, New Iberia, Louisiana.

1993

Visual Inspection & Examination of Welding, Inc. (V.I.E.W.)

Construction Supervisor (Visual Inspection)

Performed visual inspection duties as client representative on the following projects:

1993 Shell Oil Inc. (Auger Tension Leg Platform)

Project Manager and Site Inspector

Supervised the fabrication of pressure vessels and production equipment installation. On site inspection of coating application, monitoring NDE in accordance with approved drawing and specification. Shell Oil References: C.R. Soileau, T. Judd at (504) 588

6824.

1993 Marathon Oil Company (South Pass 86 “C”; Messanine Deck and Flow Line Installation Construction Supervisor

Duties included visual and dimensional Inspection of the fabrication of the mezzanine deck and spool-piping

Prior to offshore installation. Duties also included inspection of coating application as per job specification.

Marathon

References: R.W. McDonald at (318) 233

8240.

1993 Marathon Oil Company (Burn Point Gas Plant Phase 1: 12” Pipeline and Meter Installation

Construction Supervisor

Duties Included Project Management, testing welders per API 1104 code, checking material per Marathon's specifications. Visual and dimensional inspection, coating application and provided DNE in accordance with specifications and applicable codes during construction. Marathon References: R.W. McDonald at (318) 233

8240.

1993 Pennzoil Expl. & Production Co. (Ship Shoal Blk. 58 – Installation of 4” Flow line and 4” Branch Connection – (Hot Tap) to the Bonito 12” Pipeline)

Client Representative

Responsible for monitoring the welding of the 4” pipeline and 4” branch connection to the 12" pipeline. Witnessed the NDE ultrasonic application performed on sub

Sea tie

In as directed by engineer. Pennzoil Reference: Jerry Gilmore at (713) 546

8661.

1992 Marathon Oil Company (Treating System Lact Unit Installation @ West Delta 70 “A”

Construction Supervisor

Monitored the fabrication and welding of the spool piping vent boom, deck extension pump skid and the access walkways, coating application and NDE in accordance with specifications and applicable codes, i.e. API, AWS, ANSI and ASME. Reference: C. Larry.

1992 Shell Oil Company (Auger Tension Leg Platform)

Construction Supervisor

Duties included monitoring the fabrication and Welding of the emergency generator building, nitrogen accumulator vessels and the hydrate inhibitor tank. Visually inspected weld profiles, dimensional check, installed rotating equipment, switchgears, compressor and interconnecting piping for all the units. Supervised the application of the chartek fire proofing, monitored all sandblasting and coating application and provided daily reports and time keeping per T&M. Load out as directed by Shell Procedures. Shell Oil Company References: C. McMlelland, M. Lindsay, M. Decan, C.R. Soileau at (504) 588

6826.

1992 Pennzoil Exploration & Production Co. – Projects:

Construction Supervisor assigned as client representative, responsible for monitoring the following Pennzoil projects

1992

SMI BLK 48 “E”

Supervised the welding and fabrication of 1160’ of 36” OD conductor make

Up, four (4) strings at 290’ per string with the 28x20 subsea template at Franks Casing in Lafayette, Louisiana and Unifab Inc. Port of Iberia in New Iberia, Louisiana. Also served as client representative on offshore installation of conductors and sub

Sea template on the above project.

1992

HI BLK 140 “A”

Supervised the construction of 290’ of 42” conductor make, one (1) 10,000 BOPD flotation cell, one (1) 30” x 12’ test separator with skid and piping.

1991

SMI BLK 22 “B”

Supervised construction of pig launcher and receiver assembly, one (1) inlet manifold with skid, vertical vent scrubber and a 16* fuel gas scrubber with interconnecting piping.

1991

SMI 23 “G”

Monitored the construction of the 66" OD horizontal three-phase separator and the 96” OD heater treater with skid and interconnecting piping.

1991

SW 48 “E”

Monitored the construction of one (1) 96” OD vertical vent scrubber, 54” OD horizontal three phase separator, 72” precipitator and one (1) 36” test separator with skid and interconnecting piping.

1991

W. C. 262

Monitored welding, fabrication and offshore installation on the 72” caisson with Frank’s Casing Crew. Pennzoil References: G. Marcombe, D. Jeffries, Fritz Roy and B. Bright.

1990 USI

Quality Control Inspector: Assigned to Texaco’s Angola Blk. #2 development project. Reporting directly to Mr. Gary Brider, Texaco Project Engineer.

Responsible included monitoring the fabrication of the main deck, cellar deck, helideck and boat landing. Inspect witnessed and document in detail material and welding QC information, preheat and crack repair procedures. Monitored fabrication fit-ups and visual inspect and verified welding activity.

1990

Pelican State Inspection Service

Construction Supervisor

Assigned to UPRC’s (MOPU) Project reporting to Murphy Richard and Bill Pate, Project Engineers converting jack-up drilling rig to Mobil Offshore Production Unit. Responsible for overseeing the removing of drilling equipment from the mail deck and preparing the deck to receive production equipment Installed rotating equipment, natural gas pumps, flow lines and interconnecting piping.Supervised the spraying of the chartek fire proofing application. All applicable specifications, codes and drawings were verified.



Contact this candidate