PERSONAL DETAIL:
Date of Birth : ** September ***0
Nationality : Indonesian
Marital Status : Married with 2 children
Education : B.E (Marine Engineering)
Sepuluh November Institute of Technology Surabaya
(ITS-Surabaya), Indonesia
Passport No. : B 0888186
Address : Perumahan Pamulang Elok Blok E1-12B
Bojong Sari-Depok 16517
Phone : +628***-***-****
Email : acub53@r.postjobfree.com
SUMMARY OF EXPERIENCE:
My career spans more than 10 years in the Oil & Gas and Petrochemical industries as Piping Engineer in both Client side and EPC Contractor side. I have been exposed to various Engineering and Construction jobs both in Onshore and Offshore with high level quality requirement such as Petrochemical, LNG, Refinery, Central processing platform and Wellhead platform.
I have depth understanding in Engineering and Design work start from Proposal Stage, FEED stage, Detail engineering stage Construction, Pre commissioning and Commissioning both for green Field and Brown field modification project.
My expertise is cover in Pipe Stress Analysis, Piping Material and Piping Lay out. I have strong capability in Pipe Stress analysis with experienced to perform analysis for various piping system such as flow line, riser, and piping system which connected to turbine, compressor, single and multi-phase pump, re-boiler, Air cooler, column, pressure vessel and exchange. At side of that I have good knowledge in piping material Piping layout with many kind of responsibility such as developing piping material specification, wall thickness calculation, preparing Valve and SP item datasheet, material requisitions, vendor document review, technical bid analysis, and assist lead area to develop piping lay out.
I am familiar with various design codes and standards for instance, ASME B31.1, ASME B31.3, ASME B 31.8, API 6A, API 610, API 617, API 667, NEMA SM 23, and Company Standard such as Petronas-PTS, Shell-DEP, Total-GS.
EDUCATION BACKGROUND:
Bachelor Degree in Marine Engineering from Sepuluh November Institute of Technology Surabaya, Indonesia. On September 2005 With GPA 3.07 out of 4.0
SOFTWARE EXPERIENCE:
1.CAESAR II
2.Auto Pipe
3.PDMS
4.PDS
5.SPR (Smart Plant Review)
6.AUTOCAD
CAREER HIGHLIGHTS
July 2014 – Present TOTAL E&P BORNEO BV
Lead Piping Valve and Vessel Engineer for Maharaja Lela South Project
As Lead Piping Valve and Vessel Engineer in PJC Team of TOTAL E&P Borneo BV, I am fully responsible to manage the execution of the Project are within the specified project schedule, and to ensure the execution of the Engineering Procurement Construction and Installation of All Piping Valve and Vessel are meet with the Company Technical requirement.
Key Project Experience and Responsibility:
1.Engineering Stage :
-Responsible to manage and reviewing the engineering document submitted by EPC Contractor & Vendor for all piping job including Piping Design, Piping Stress, Piping material, Valves and Vessel Design
-To be involved in manufacturing stage especially during FAT of the piping component such as Valves, Pipes, Fitting, Flanges and Piping special item such as Constant spring support and strainer.
2.Construction and Pre-Com/ Commissioning Stage :
-Responsible to assist construction team to solve any construction problem including to review shop drawing of the piping component.
-Responsible to review all Pre-com/ Commissioning procedure such as Hydrotest, Gross Air Leak Test (GALT), Flange management, Piping Reinstatement, Helium/ Nitrogen Leak test.
-To be involved during Pre Com/ Commissioning activity, such as perform line check prior to Hydrotest, witnessing the flange management, Piping reinstatement, Hydrotest activity, GALT, He/N leak test.
3.Offshore Hook Up Stage :
-Responsible to manage, monitor and assist the Contractor Piping Hook up team during the whole execution of offshore hook up period to ensure all the activities are meet with the technical requirement, HSE and project schedule.
August 2013 – July 2014 PT. Synergy Engineering
Head of Department – Piping
As Head department I am fully responsible to develop and improve the piping team capability both in technical and non-technical area. The main responsibility is including:
Supervise all team members to maintain the quality of the deliverable document, including Piping Material and piping stress analysis job to meet client, industrial practice and government regulation requirement.
Manage and develop working plan to ensure the job delivery are within the budget and schedule.
Maintain the good coordination within team member and Inter discipline
Key Project Experience :
1.FEED and Detail design :
FEED - SANTOS Ande Ande Lumut Development project
DETAIL - HUSKY-CNOOC Madura Limited (HCML)- Madura Bd Field Development Project (Metering
Facilities)
DETAIL - Pertamina Hulu Energy WMO - KE-38 Temporary Production Facility (TPF)
DETAIL - Pertamina Gas - Design procurement and installation of the Compressor at Arun Belawan
Refinery field
FEED - Petronas – Carigali Bukit Tua Development Project
2.Blanket Engineering Service :
Main Job Description :
-Planning and undertaking any modification within the shutdown period provided by CPY
-Actively participate in the safety programs to improve, promote and enforce safety procedures and policies.
-Initiates root cause analysis of equipment/machinery failures including the piping system, Connecting Vessels, Metering facilities etc.. To develops suitable repair solutions to be submitted to CPY in order to reduce and/or possibly eliminate reoccurrence of failure.
-Initiates and study any possibility to enhance the production efficiency of the Field. Provide the planning, technical study and execution plan.
Key Project :
Star Energy blanket engineering Modification Maintenance service
BP Tangguh blanket engineering, Modification Maintenance Service
CNOOC Blanket engineering Modification Maintenance service.
Premier Oil Blanket Engineering Modification Maintenance service.
January 2012 – August 2013
Senior Mechanical-Piping Engineer PT. Worley Parsons Indonesia
FEED - BP Tangguh LNG - Tangguh Expansion Project
BP Berau, is the operator of Tangguh LNG, which is a two train natural gas (LNG) liquefaction facility in Bintuni Bay, Papua with associated gas supply comprising two offshore platforms, pipelines and fourteen wells
BP Berau has initiated the Tangguh Expansion Project (TEP) to supply gas to the existing trains and a single LNG train expansion (Train 3). The expansion will also ensure that additional trains can be added without impediment.
TEP will comprise new offshore facilities (GPF), including wellhead platforms and pipelines, and onshore development on the existing Tangguh brownfield site.
Role : Lead of Piping/ Piping Stress Engineer
Scope of work :
Prepare Mechanical Piping deliverable list
Prepare Piping Execution plan
Prepare Man hour budgeting & schedule
Prepare Piping Stress Analysis Design basis
Prepare Piping Material Specification
Detail Design- Total E&P Indonesie-Sisi Nubi Phase 2B and Peciko Phase 7B Development Project
Sisi - Nubi is a field located on the East of Kalimantan, Indonesia, around 25km offshore from the Mahakam river delta and 30km to the southeast of the Tunu field in the water depth of 60m to 80m.
Peciko is a gas field located offshore in the Mahakam delta, on Kalimantan in Indonesia. The field lies on the Mahakam PSC, The water depth is between 30 - 50 metres, to the South of the Mahakam river delta and about 25 kilometres southeast of the TOTAL E&P Indonesie Senipah terminal. This project will consist of the engineering, procurement, supply and construction of three (3) platform decks to be installed in Sisi Nubi and Peciko Fields respectively
Role : Lead of Piping/ Piping Stress Engineer
Scope of work :
Prepare Mechanical Piping deliverable list
Prepare Piping Execution plan
Prepare Man hour budgeting & schedule
Prepare Piping Stress Analysis Design basis
Prepare Piping Material Specification
Checking and Perform Pipe Stress Analysis for Flowline & Production manifold, Vent line, Offloading Pump, Open & Closed drain.
Support checking
Checking Manual Valve data sheet
Checking Special Item data sheet
Inter-Discipline Coordination
Detail Design - Total E&P Myanmar-YADANA Subsidence Project
The Yadana gas field operated by TOTAL E&P Myanmar. The main jobs of the project is to do Replacement of the existing FP and QP platforms, Brownfield modifications on PP, MCP, WP1 and WP2 platforms (especially: replacement of existing main equipment located at cellar deck (or drain deck), new access platforms for this new equipment, relocation of secondary structures).
Role : Sr. Piping Mechanical Engineer
Scope of work :
Prepare Mechanical Piping deliverable list
Prepare Piping Stress Analysis Design basis
Prepare Piping Material Specification
Perform Pipe Stress Analysis for Flare line
Prepare Manual Valve data sheet
Prepare Special Item data sheet
Prepare requisition
Perform Technical bid evaluation
December 2010 – January 2012 PT. NISCONI (Nippon Steel Construction Indonesia)
Senior Piping Engineer
Detail Design - Total E&P Indonesie-South Mahakam Field Development Project
South Mahakam Field Development Project is EPC project for PT NISCONI from TOTAL E&P INDONESIE. The project scope are covering the installation of three unmanned wellhead platforms, associated sea lines, a main gas trunk line including a double sub sea Wye connection (connecting East Mandu sea line and providing a tie-in point for future pipeline) to the onshore processing facilities in Senipah, and modification works at the Senipah processing facilities
Role : Sr. Piping Engineer
Scope of work :
Prepare Piping Stress Analysis Design basis
Review Critical line list
Perform Pipe Stress Analysis for Flow line, vent line, flare, closed drain, offloading pump and top side Pipeline system.
Perform Pipe stress analysis during transportation
Perform flange leakage checking using equivalent pressure and ASME VIII div 1 method
Prepare Official Stress analysis report
Determine Support type and location
Prepare Spring Datasheet
Isometric Checking
June 2010 – December 2010 PT. Technip Indonesia
Piping Engineer
Detail Design – KEPODANG GAS DEVELOPMENT PROJECT
Kepodang Gas Development Project is lump sump detail engineering project for PT. Technip Indonesia from PETRONAS Carigali Overseas Sdn. Bhd. The Kepodang field is located about 180 km north east of Semarang, the capital of the Province of Central Java, in water depths ranging from 60 to 70 meters.
The development plan for the Kepodang field comprises two (2) phases.
Phase 1 will include drilling of 6 wells and the installation of Central Processing Platform (CPP), Wellhead Module, Satellite Wellhead, Onshore Receiving Facility (ORF), and 14” diameter 200 Km Export line.
Phase 2 developments will include the installation of an additional satellite WHT-D with two (2) wells tied back to the CPP and two additional wells to be drilled from the Phase 1 facilities.
Role : Piping Engineer
Scope of work :
Prepare Piping design basis
Review Piping Material Specification
Checking Item code for PDMS data base
Checking Speciality Item
Prepare Piping Stress Analysis Design basis
Prepare Critical line list
Perform Pipe Stress Analysis for flow line & riser, piping system with connected to turbine, compressor, air cooler, and pressure vessel.
Prepare Official Stress analysis report
Review pipe design and routing
Determine Support type and location
Prepare Spring Datasheet
Prepare loading data.
Isometric Checking
October 2009 – June 2010 Petrofac-IKPT International
Technical Professional Piping
Detail Design – EL-MERK PROJECT
El-Merk Project is an Engineering Procurement Construction contract for Petrofac Int Ltd, from Sonatrach-Anadarko Algeria Company L.L.C which will deliver the Installation of Central Processing facility to accept oil and gas production from fields in blocks 208 and 405a located in the Berkine Basin of Algeria and to treat these fluids to produce and export oil, LPG and condensate. The facility also is designed to enable the future installation of facilities to process an NGL stream from blocks 403a/404a.
Role : Piping Stress Engineer
Scope of work :
Checking Critical line list
Checking pipe routing design.
Calculate pipe stress analysis on Pipe rack, static and rotating system such as Re-boiler, Compressor, Pump, Tanks, Air Cooler, and vessel.
perform the stress analysis for all case including operating, slug, and seismic case
Checking support including compiling special support datasheet such as spring support.
Prepare loading data for Civil / Structure
Compile Officially Stress Analysis Calculation Report
November 2005 – October 2009 Kellogg Brown and Root Engineer Indonesia
Technical Professional Piping
Detail Design – NORTH RANKINE B PROJECT
North Rankine B project is a join venture between KBR-Worley Parsons which are located approximately 130 km west of Karratha in Western Australia will be a new offshore platform, installed adjacent (and bridge linked) to existing North Rankin A (NRA) platform. The prime function of NRB is to provide the required gas compression and condensate pumping for fluids produced through the NRA wellheads and flowlines. Processed gas and condensate will be exported through the existing NRA export facilities
Role : Piping Stress Engineer
Scope of work :
Checking Critical line list
Checking pipe routing design.
perform the stress analysis for all case including operating, blasting, transportation, slug, and seismic case
Perform calculation for GRP and Cu-Ni material.
Prepare loading data for Civil / Structure
Review pipe routing and design
Prepare loading data for static / rotating equipment, nozzle evaluation
Checking and finalize the isometric drawing
Compile Officially Stress Analysis Calculation Report
Detail Design - PEQUIVEN MORON AMMONIA PROJECT
The Project is shared between PT KBR Jakarta and KBR Houston for detailed engineering of 1800 MTPD Ammonia Plant of Petroquimica de Venezuela, S.A. The plant is located in Pequiven Petrochemical Complex, Moron, Venezuela
Role : Piping Stress / Piping Mechanical Engineer
Scope of work :
Checking Critical line list
Calculate pipe stress analysis on Pipe rack, static and rotating system such as Re-boiler, Compressor, Pump, Turbine, and vessel.
Calculate Slug and Seismic analysis.
Establish pipe support type including to compile spring support, snubber datasheet
Prepare loading data for static equipment such as clip support location and Nozzle evaluation,
Prepare loading data for Civil / Structure such as pipe rack, sleeper, support foundation
Establish pipe support location to the PDS model
Review pipe routing and design
Checking and finalize the isometric drawing
Detail Design – SAUDI KAYAN OLEFINS PROJECT
Saudi Kayan Olefins Project is part of a grass-roots petrochemical complex that will be located in Al-Jubail, Kingdom of Saudi Arabia.
Affiliate : Saudi Kayan Petrochemical Company
Feeds : 17% Ethane, 83% Mixed Butane
Products : Ethylene, Propylene, Benzene
Capacity : 1350 KTA, 630 KTA, 150 KTA
Technology : KBR SCORE, Axens
Role : Piping Stress / Piping Mechanical Engineer
Scope of work :
Checking Critical line list
Calculate pipe stress analysis on Pipe rack, static and rotating system such as Reboiler, Compressor, Pump, Turbine, and Vessel.
Establish pipe support type including to compile spring support datasheet
Prepare loading data for static equipment such as clip support location and Nozzle evaluation,
Prepare loading data for Civil / Structure such as pipe rack, sleeper
Establish pipe support location to the PDS model
Review pipe routing and design
Check and finalize the isometric drawing
Detail Design – CPOC JDA BLOCK 17 DEVELOPMENT CENTRAL PROCESSING PLATFORM
The CPOC JDA Block B-17 development is development plan for the main complex follows a “single floatover installation” concept for the Central Production Platform (MDPP). Detail Engineering project for Central Processing Platform (CPP). Client CARIGALI-PTTEPI Operating Company SDN BHD.
Role : Pipe Stress Coordinator/ Piping Stress Engineer
Scope of work :
Prepare working procedure between Stress team, design team and Singapore team
Checking Critical line list
Calculate pipe stress analysis for GRP System, Static and rotating equipment system such as Condensate stabilizer, compressor, and pump.
Prepare loading data for static equipment such as clip support location and Nozzle evaluation,
Establish pipe support type including to compile spring support datasheet
Prepare loading data for civil structure,
Checking P&ID,
Checking Pipe material class specification,
Review pipe design and routing.
Check and finalize the isometric drawing