Post Job Free
Sign in

Engineer Control

Location:
Venezuela
Salary:
8000
Posted:
June 16, 2016

Contact this candidate

Resume:

Information

Staff

Name: Johan Jose Peralta Arrieta

Identity Card: 13.210.376

Marital Status: Married

Nationality: Venezuelan

Date of Birth: 13 September 1976

Place of Birth: Cabimas, Zulia State

Telephone: +58-426*******+58-261*******

Work

Experience

- OPTIMIZATION ENGINEER ONSHORE AND OFFSHORE

- Locate / identify design well.

- Make the premises for taking part and comprehensive records. (Includes records or trends of pressure, flow, test, review of surface conditions and sample).

- Request to develop Production Scheduling Program registration Partial / Integral, according to the requirements, and considering the System Testing Program implementation Sentinel.

- Request for Production Scheduling implementation making records, considering the use of calibrated instruments.

- Request for Production Scheduling progress of the plan-making records (compared with the real plan executed), whereas the records taken coincide with the state of the well.

- Validate the data, determining whether the information is consistent with the current operational status of the well.

- Check functionality of the equipment and associated systems to the well according to the production method according to the method of removal, Diagnostic lift wells in Mechanical pump

diagnosis wells Survey by electrosumergible pump, Diagnostic Survey of wells by cabidad progressive pump, Diagnostic wells Removal in Gas Lift, Diagnostic Survey by pumping wells and Diagnosis of Hydraulic Lifting wells by natural flow). In the verification team agreed to review the method of operation parameters versus design team.

- Deliver results and conclusions of Diagnosis wells through automated applications and RAP Sentinel.

- Make recommendations to wells across applications and automated RAP Centinela.

- Request to broadcast programming Work Program and the implementation of actions.

- Review of the Well Production Potential versus request and Studies Potential Sites adjustment in the well, if required.

From: February 2003 To: Current.. (12 years experience)

Place: PDVSA. Exploration and Production West. Venezuela, Maracaibo - Edo. Zulia

Supervisor: Fidel Machado. Phone: (00)-(58) 261 - 8063444

-TECHNICAL CONTROL OF SOLID III OFFSHORE

-Place the mesh design for type of hole, galonaje and parameters used.

- Periodically evaluate the solids control equipment, such as shale-shaker, Mud Cleaner, Shaker Centrifuges and dryers.

- Test the retort to the solid waste discarded (Ripios) and report the percentage of wettability of them.

- Prepare daily operations report showing: Equipment operation, maintenance performed, drilling parameters used, properties of sludge, and a summary of drilling activity of the day.

From: March 2001 To: May 2001

Place: SWACO División MI Drilling Fluids of Venezuela,C.A. Ciudad Ojeda - Zulia

Supervisor: Gilberto Nava. Phone: (00)-(58) 265 - 6317207

-TECHNICAL CONTROL OF SOLID III OFFSHORE

- Design a system capable of solid phase drilled solids size increasingly thin.

- Management of solid control equipment such as: Shale Shaker, Mud Cleaner, Desinter, Desander, decanting centrifuges, Screws endless Desgacificadores etc.

- Preparation of different types of drilling fluids (water-based mud, oil-based sludge, aerated mud, etc.).

- Technical and logistical support operations in the lake and land control solids.

- Assembly, disassembly and repair of various solids control equipment.

- Work injection into the lake at gravel pits formations dead.

- Testing of the various drilling muds and reporting solid control.

Work

Experience

From: February 2000 To: Enero 2001.

Place: TUBOSCOPE BRANDT OF VENEZUELA, S.A. Ciudad Ojeda - Zulia

Supervisor: Rodolfo Carmen. Phone: (00)-(58-265-*******

- PASANTIAS/ THESIS.

- Management of laboratory equipment, preparation of different types of cement grout.

- Experimental Determination of the density of a slurry, determination of free water.

- Calibration of laboratory equipment, pilot testing and tank cement grout.

- Making reports with the results of different mixtures.

- Design of grout according to specifications established.

Cement-works of different types of wells and vertical, horizontal, directional, and so on.

From: April 1998 To: July 1998.

Supervisor: Tech. Wuilmen Jiménez. Phone: (00)-(58-265-*******

Place: BJ SERVICES OF VENEZUELA, C.A, Ciudad Ojeda – Zulia

Higher

Education

Place: Graduate Institute “Santiago Mariño”, Cabimas – State Zulia. Venezuela

Obtained Title: Petroleum Engineer

Average: 15.57 / 20 points.

Accreditation

Course H2S (hydrogen sulfide)

Diploma of energy and oil policy of Venezuela

Workshop Operation and configuration Pozomatic

PI Process Book

Nodal Analysis

Intermittent and Continuous Gas Lift

Advanced Pipesim

Basic Pipesim

Problem analysis and decision making

New technologies and best practices Exploration and Production 2006

First Aid

Continuous and Intermittent Gas Lift

Motivation and Assertiveness

Nicles Anchorage, sleeves and caps production

Calibration pipe Wire line

Optimization of production systems (Nodal Analysis)

Underground operations with Wire line

Workshop geological field training Misoa Arenas B and C "

Production methods: artificial lift gas Lift

Technology for artificial lift gas Lift

Design completion of wells in sand deposits with problems

Swaco Injectionns Systems

IFE Swaco Centrifuge Workshop

Swaco Solids Control

Swaco Cuttings & Waste Collection

16 Hours

192 Hours

08 Hours 08 Hours

40 Hours

40 Hours

40 Hours 40 Hours 24 Hours

24 Hours

08 Hours

32 Hours

16 Hours

40 Hours

40 Hours

40 Hours 40 Hours

12 Hours

16 Hours

08 Hours

40 Hours

32 Hours

32 Hours 32 Hours

32 Hours

2012

2012

2008

2008

2008

2007

2007

2007

2006

2006

2006

2006

2006

2006

2005

2005

2005

2005

2004

2004

2004

2001

2001

2001

2001

Programs database ONE – TRAX. (Swaco – MI)

24 Hours

2001

New Techniques in stimulation of wells by injecting chemicals and microorganisms to increase the recovery of hydrocarbons.

08 Hours

1999

Trends in maintenance for the new millennium

16 Hours

1999

Introduction of basic production record

08 Hours

1998

Directional drilling and new technologies in drilling fluids in directional wells.

08 Hours

1997

Seminar on Drilling Fluids.

08 Hours

1997

Core Drilling Equipment.

08 Hours

1997

Oil Tech Week

Oil Seminar Update

40 Hours

08 Hours

1996

1996

Language

Spanish / currently in basic English language study.

Personal references

Licensed. Denny Viloria. Graduate education Phone: (00)-(58-416*******

Engineer. Yasely Fernandez Petroleum engineer Phone: (00)-(58-426*******

The Society of Petroleum Engineers, memberhips N 4170360 certifications engineering college N 153.029

Note: Original documents and copies available upon request of the interested party

Address: 58 Av. N ª 2 Circunvalación Sector Amparo Terrazas Urb Maracaibo, Edif Santa Lucia. 7 Floor Apartment 7-A. Maracaibo - Venezuela. Tel: (+58) 261 - 7564265 / Cell: +58-426-******* E-mail:

**********@*****.***



Contact this candidate