MOHAMMAD MANZOOR HABIB
**** ******** ******, ******, ** 92880
Cell No: 714-***-**** & 714-***-****
E-Mail: ************@*****.***
PROFILE HIGHLIGHTS
Telecom Professional with 25 years of experience in wireless communication including site optimization (4 Way RX LTE and Ground based AWS RRUs), and cell site DC power conversions, Ericsson UMTS 3G Outdoor & Indoor (3106, 3206, 3018, 3518 & 3418), Hybrid Cabinet 2G & 3G (6131 6601) LTE 4G (6201 6102) GSM 2G (2106, 2206, 2308, 2102, 2202), & TDMA (RBS 882 & 884) system implementation, installation, troubleshooting (VZWR /RSSI), and experience with Anritsu site master spectrum analyzers and Kaelus PIM testers, Experience with multiple carriers including
T-Mobile, AT&T and Verizon throughout the state of California, Assisted in Site New Builds (NCD), Site expansion, operations and maintenance.
PROFESSIONAL EXPERIENCE
GCB Services, Mclean, VA Feb 2016 to Till Date
BTS Radio Field Tech
Verizon Wireless PSAP E911 Phase II Test Calls of LTE 700 and LTE AWS 1900 to County’s Communication Dispatched Center or Highway Sheriff’s Department office accordingly to the PSAP
E911Call’s rout, verify the Test call data.
Verizon’s PSAP Call Test did in Los Angeles, CA area and Bellevue, Kirkland, Redmond, Seattle,
Everett, Renton, Olympia, Lacey, Spokane, Kennewick, WA area.
Same PSAP 911 Test Calls did in IDAHO and OREGANE States.
ETAK Systems Anaheim, CA June 2014 to December 2015
CA/DC Field Tech
DC power consolations with the installation of new DC Equipment for Verizon Wireless Southern
California market.
Participated in VZW’s AWS ground based RRU project as well as VZWs LTE 4 Way RX Project.
Assisted in the installation and testing of RF coax jumpers with Anritsu Sweep Master and
RF PIM test with Kealus and Anritsu PIM Tester.
Participated in indoor and outdoor new site builds (NCD) for Verizon Wireless.
Helped in the maintenance and inventory up keep of ETAK Warehouse.
TRAVCOM (Sub Contractor EXI Parsons USA) November 2013 to January 2014
Radio Field Tech (RT II)
Work as AT&T for Ericsson’s UMTS 3G DUW 30 (Dual DUW 30) Integration and Trouble shoot job.
New Site Build (NSB), Carrier Ads, Channel Ads Job 3G UMTS of AT&T Los Angeles, CA Market.
WAVSYS (Sub Contractor AT&T USA) September 2013 to October 2013
Radio Field Tech (RT II)
Work as AT&T Tiger Team of Los Angeles, CA Market for Trouble shoot on live networks Trouble Tickets.
Trouble shoot job on 3G UMTS and 4G LTE equipment, RF Lines, Duplexers and RF RET Issues.
VSWR and RSSI troubleshoot job active live equipment with site Master ANRITSU Spectrum Analyzer.
PIM (Passive Inter-Modulation) testing on RF path for VSWR issues.
Troubleshooting Passive Intermodulation Problems in the field with ANRITUSU equipment
Work and Trouble shoot on DAS equipped Site with TE and Mobile Access.
WAVSYS (Sub-Contractor T-Mobile USA) January 2012 to June 2013
Radio Field Tech (RT II)
Work on integration and testing of cell site routers for IP backhaul in Inland Empire and Orange
County market.
Perform 3G network optimization by working on coverage enhancements and antenna tilt changes
Accordingly with Field RF Tech.
Daily O&M work, Daily Basis site’s Trouble Ticket on GSM UMTS AWS/PCS & LTE equipment.
TEK Systems (Sub-Contractor T-Mobile USA) March 2011 to October 2011
Radio Field Engineer (RT II)
Work on integration and testing of cell site routers for IP backhaul in Los Angeles market.
Perform 3G network optimization by working on coverage enhancements and antenna tilt changes with RF.
Daily O&M work, site scanning for assets and 2nd carrier installation in Los Angeles market.
James Services Corporation
(Sub-Contractor Ericsson/EXI for T-Mobile/AT&T/Verizon in Los Angeles)
Radio Field Engineer (RT II) April 2010 to March 2011
Manage team of 6 people for RAX and TX board addition for T-Mobile Los Angeles market.
Work on Ericsson LTE project for cabinet installation for Verizon Los Angeles market.
Perform 3rd carrier add installation and testing for AT&T Los Angeles market
Dataworkforce LP
(Sub-Contractor Ericsson/TNS for T-Mobile/AT&T in Los Angeles & San Francisco, CA)
Radio Field Engineer (RT II) April 2004 to April 2010
Node B UMTS 3206/3106/3308/3518/3418 Installation and QA verification for AT&T in accordance
with Ericsson standards
UMTS 3G Ericsson’s test equipment installed in apple office for I-phone testing Lab in Bay area.
UMTS 3G Ericsson Equipment in Google’s office facility for the testing purpose in Bay area.
In different markets which include San Francisco Bay area and Los Angeles.
UMTS site expansion with testing on 2nd and 3rd carrier addition and integration.
Drive testing for re-home and Data testing to confirm site status.
E911 PSAP of 1st & 2nd Carrier configuration sites.
Add and activate the ETMC card for 5th T1 to 12th T1, call test with data testing.
UMTS 3018 Combo Installation inside GSM 2106 in accordance with Ericsson standards.
PBC6500, BBU2200 and BBU4500 installation and commissioning.
True Position/Flex Master LMU 1900 MHZ E911 Installation and Integration.
GSM 2206/2106/2102/2202/2308/HCHC2250 Installation and integration in accordance to Ericsson Standard.
New T1 add, Channel add, site re-configuration & Sector addition.
E911 PSAP Testing on GSM network.
Worked on Antenna issues for 2G/3G cell sites including Diversity, VSWR and TMA alarms.
Site audits confirming BTS configurations and reporting quality issues.
Re-Stacking of Ericsson’s TDMA Equipment includes RBS882, RBS884 & Cassette Solution for
free up physical Space and frequency to be used for future’s 2G GSM and 3G UMTS networks.
Quality supervision of the completed work in order to make sure it meets the requirement and standard.
Troubleshoot and Rectifier the service affecting faults and alarms.
T1 harvesting and re-grooming for 2G and 3G networks.
Dataworkforce LP (Sub-Contractor Ericsson/TNS for AT&T San Francisco)
Radio Field Engineer (RT II) December 2003–April 2004
Expansion of 2nd Radio Cabinet and channel adds in Ericsson RBS-2206 & RBS-2106 for
Overlay Cell in 1900MHz.
T1 Testing and Troubleshooting for the expansion.
Installation and testing of the RBS-2206 & RBS2106.
Troubleshooting of the service affecting faults and alarms.
Dataworkforce LP (Sub-Contractor Ericsson/EXI for Cingular Chicago)
Radio Field Engineer (RT II) February 2003–July 2003
Installation, Testing and Integration of Ericsson RBS-2206, RBS-2106 & RBS-2308 (New Microcell) in
Chicago Market for Cingular Chicago, IL with New 2G GSM Network.
Edge Upgrade of Ericsson 2G GSM Network.
Expansion of 2nd Cabinet and channel add in the Ericsson GSM Network.
Call testing and troubleshooting to maintain the quality of the service.
Dataworkforce LP (Sub-Contractor Ericsson/TNS for AT&T Los Angeles)
Radio Field Engineer (RT II) November 2001–January 2003
Installation, testing and Integration of Ericsson RBS-882, RBS-884 & Cassette Solution for the AT&T
TDMA Network.
Edge Upgrade in AT&T GSM Network for Ericsson Equipment for EXI/Ericsson of Cingular
project in San Francisco, CA
Expansion of 2nd Cabinet and channel add in the Ericsson GSM Network.
Call testing and troubleshooting to maintain the quality of the service of TDMA & GSM Network.
Quality supervision of the completed work to meet the requirement and standard.
Dataworkforce LP (Ericsson /AT&T San Francisco Bay Area)
Radio Field Engineer November 2000–November 2001
Expansion in terms of channel add and cabinets in RBS-882 & RBS-884.
New site installation and integration of RBS-884.
Troubleshooting of the service affecting fault and external alarms.
RBS Engineering for the existing sites for the CAD Diagrams and Inventory of the sites.
Dataworkforce LP, Ericsson/Cingular Orlando, FL
Radio Field Engineer May 2000–November 2000
Installation, Commissioning and Testing of Ericsson RBS-884 in different cities for BellSouth (Cingular)
CONDOR Project in Memphis (TN), Birmingham (AL), Jackson (MS) and Orlando (FL).
Installation and defining of External Alarms
Support market after the cut over of RBS-884 equipment.
Troubleshoot service affecting faults and alarms.
INSTAPHONE, PAKCOM LTD. Lahore, Pakistan
Assistant Manager Field Engineering Central Region May 1990 to May 2000
Work as Remote Engineer in Lahore, Quetta and Peshawar for the maintenance and troubleshooting of
RBS 882 on AMPS System. Worked as installation, rectification of Microwave fault, Checking of Power Equipment, Coverage and Call testing as per RF optimized planning.
Installed and commissioned Ericsson RBS 882, 882D & 884
Installed and commissioned Ericsson Microwave link (Mini link MKII and C-family) for voice and data transmission between MSC and cell sites.
Installed the Digital Microwave Corporation (DMC) 15 M Microwave Radio Systems.
Installed & configured the Ericsson 30 & 60 Channel PCM MUX and work on New Bridge 3600 Main
Street MUX equipment.
Work on cell enhancers to improve coverage in weak areas.
Operated independently UNILAB SMART CELL SWITCH in Lahore.
Responsible for repair, maintenance & trouble shooting of Cell Switch.
Meeting and correspondence with UNILAB SMART CELL SWITCH Australian’s Engineers.
Interface the PSTN network with MSC by working closely with the management of PTCL Pakistan authorities
PROFESSIONAL TRAININGS
Attended a 4 days training of installation and troubleshooting of Ericsson MINI-LINK MKII 15 MHZ & Ericsson E. Series microwave system held in Karachi, Pakistan in Jan 23rd to Jan 26th 1995.
Attended a 10 days training of Maintenance & trouble shouting of ERICSSON RBS 882 held in Lahore, Pakistan from October 25th to November 5th 1995.
Attended a 12 days training of RBS 884 installation, Maintenance, DT Modification and Trouble shooting in Islamabad, Pakistan from February 15th to February 27th1997.
Attended 5 days training of NOKIA Phones course Programming, repairing, Maintenance, Trouble shooting conducting by NOKIA Singapore Engineers held in Islamabad, Pakistan from M
ay 21st to May 25th 1992.
Attended 15 days training of NETCOM Management in Stockholm, Sweden from June 1st to 15th June 1999.
Attended 1 week training of Installation and Testing of Ericsson RBS-2308(Micro) In Chicago. IL USA in February 2003.
TEST EQUIPMENTS AND SOFTWARES
Anritsu site master, Kaelus & Anritsu PIM Tester,
T-Bird T-1 tester, W&G Performance Analyzer (PA-41), PCM meter, GPS, Allgon meter, Bird & Marconi
RF Power meters used in installation/maintenance of RBS sites.
Command over different software that includes TEMS 4.1, Map Info, MS Excel and Access & Power Point etc.
for systematical presentation of data & information.
QUALIFICATION
Higher Secondary School, Board of Intermediate and Secondary Education, Lahore, Pakistan 1986 - 1988
2 years Diploma Course in Electrical & Mechanical, Ali Industrial & Technical Institute,
Punjab Board of Technical Education, (AITI) Lahore, Punjab, Pakistan 1984 – 1985
Matric (Secondary School Certificate) Boards of Intermediate and Secondary Education,
(BISE) Lahore, Punjab, Pakistan 1981 - 1983
US Citizenship Holder