NICHOLAS S/O PAUL VINCENT
Taman Desa Jaya,
Malaysia
************.*****@*****.***
House/P : +6-07-354****
H/P-M’SIA : +601*-*********
Date of Birth : 22nd Dec 1990
Nationality : Malaysian
Passport No : A21354827
NRIC No : 901***-**-****
Marital status : Single
Languages Spoken/Written : English, Tamil and Malay
Training & Skill Development
Diploma In Software Engineering IT 2013
NACE Coating Inspector Level 1 (ID 20112) 2008
SSPC PCI Basic Coating Inspector (ID# 24304) 2008
SSPC PCI Level 2 (ID#40357) (Completed) 2011
NIOSH M’SIA Safety induction 2011
Apprentice in Piping at SEMB MARINE 2009-2010
Shipyard Supervisors Safety SINGAPORE (SSSC) 2009
TEAMWORK : Working With Your Supervisors 2010
ITE Level 1 in PIPE FITTING T1PFGPE 22-April-2010
SPM ( GCE ‘O’ ) > 3 credits < 2007
Shipyard Safety Induction Course (GT) 2009
Surface Cleaning & Paint Application (Surface preparation methods)
Open air blast
Vacuum blast cleaning
Hand and Power tools cleaning
General uses of coatings
Coating/Painting
Xylene Coatings
Personal Qualities
Proficient in Microsoft Word, Excel, Power Point
Excellent organizational Skills
Ability to work under pressure
Can as a good team leader
Sociable personality
Good communications
Inter- personal skills
High degree of professionalism
Efficiency
Independent, proactive, responsible, team work and self-motivated
Job Objectives
A relevant position where acquired skills and experience will be utilized towards the benefit of the organization.
Responsibilities
Expedition of blasting and painting of steel structures, jackets, pipelines, spools etc., sections as per specifications.
Preparation and maintenance of relevant performance and parameter records of blasting, painting and inspection.
Ensuring strict adherence to prescribed practices of blasting and painting as per standards.
Troubleshooting of painted surface defects
Overall responsible for the project, include technical and commercial aspect.
Monitor project execution and prepare project progress and status report.
Monitor & Inspect blasting & painting work.
Ensure sequence of workflow is followed.
Implementing and promoting health and safety awareness in the organization.
Responsible for the proper maintenance of all personnel records so that they are kept in strict
Confidence.
Area Of Expertise
Surface Cleaning & Paint Application (Surface preparation methods)
Open air blast
Vacuum blast cleaning
Hand and Power tools cleaning
General uses of coatings
Coating/Painting
Xylene Coatings
Type of coatings commonly used and the major components of coatings
General generic types of coatings and application process of coatings / Linings
Use and calibration of inspection and test instruments.
Defects affecting performance of the applied coatings
Causes for most common coating defects and inspection of defects on coated surface.
Identification of acceptable and unacceptable defects and implementation of repair procedure
Inspection & Test
Measure ambient conditions, surface temperature and air quality requirements
Inspect location and suitability of access for areas of work.
Inspect type of blasting equipment and tools to be used.
Inspect type and size of blasting media.
Inspect metal surface imperfections/defects
Test indication of oil or water in compressed air.
Inspect pre-cleaning or solvent cleaning of surface
Measure compressed air pressure.
Inspect degree of cleanliness required.
Measure surface profile of blast cleaned surface.
Assess surface cleanliness of blast cleaned surface.
Assess surface cleanliness for soluble salt contamination on blast cleaned surface
Inspect coating material storage conditions.
Inspect type of coating material to be used.
Monitor thinning, mixing, induction time and pot life.
Inspect type of coating application equipment and tools
Monitor application method, type and pattern.
Measure wet film thickness by notch gauges
Monitor re-coating and final curing schedules
Test MEK resistance of Inorganic Zinc Rich Primers by solvent rub.
Measure the adhesion of coatings applied.
Test pull-off straight if coatings applied
Test discontinuity (holidays or pinholes) of nonconductive coatings and linings Inspect coatings and coating systems.
Tank Coatings and preparation.
Surveys in tanks.
Ship side painting and blasting.
Inspect all types of works that’s relevant to painting and surface preparation.
In-charge of works and working sites.
Metal forms surface preparation for painting and coatings.
Inspect according to standards required.
Inclusive of monitoring the surface preparation and shop coating as well as field paintings as per all relevant ISO, SSPC and NACE standards.
Supervision & Monitoring of sub-contractor Work force, Witnessing, Reviewing and certifying all QA/QC documents, Site Procedures, and relevant codes of construction applicable to the projects.
Ensured proper storage and preservation of coating material on site.
Assured that all types of documents were maintained according to the Project Quality Plan.
Assured the complete and correct execution of the approved Project Quality Plan.
Reported on documents deficiencies noted during coating operations.
Discussed quality, and inspection findings with the QA/QC Manager
Health, Safety & Environments
Understanding local & International legal and Project specific HSE requirements
Conduct daily tool box briefing.
Ensure compliance to MSDS.
Coating safety briefing.
Attend safety meeting
Report/Document/Meeting
Daily weather record
Daily work schedule
Daily progress log
Inspect and Test report
Attend daily project co-ordination meeting
Attend daily VSCC meeting
Update client’s verification checklist on site and workshop.
Working Experience
MARCH 2016 TO PRESENT
FMC TECHNOLOGIES (FREELANCE FOR 2 MONTHS CONTRACT)
(SUBSEA PAINTING/COATING INSPECTOR)
PROJECT : SHELL BONGA / HOUSTON PROJECT / SHELL WCS / FMC ITEMS / TOTAL EGINA AND VARIOUS PROJECT’S SUBSEA ITEMS.
OCTOBER 2015 TO MARCH 2016
NALURI ALAM CERGAS, MALAYSIA
(LEAD PROJECT AND PAINTING INSPECTOR)
PROJECT: REFINERY AND PETRO-CHEMICAL INTEGRATED DEVELOPMENT (RAPID)
JULY 2014 TO OCTOBER 2015
DYNA-MAC @ TANJUNG KUPANG YARD, MALAYSIA
(PROJECT LEAD FOR PAINTING DEPT AND COATING INSPECTOR)
PROJECT: CLUSTER 7 (M35, M60) – BUMI ARMADA / KEPPEL FELS 357,360,
363,361 BLOCKS AND MODEC TEN TULLOW PIPE RACKS
MAY 2014 TO JULY 2014
FMC TECHNOLOGIES, MALAYSIA
(COATING / PAINTING SUBSEA QAQC INSPECTOR – (XYLAN & EPOXY COATINGS)
PROJECT: GUMUSUT KAKAP PHASE 2, WOODSIDE SKID AND ETC
(VARIOUS VENDORS SUBSEA ITEMS INSPECTOR)
MARCH 2014 TO MAY 2014
SERI JUBILEE ENGINEERING – DYNAMAC TKY YARD
(COATING / PAINTING QAQC INSPECTOR @ PROJECT COOD)
PROJECT: KEPPEL FELS 356 & 363 MODULE AND MODEC TULLOW TEN
OCTOBER 2013 TO JANUARY 2014
MULTIFIBRE SENDIRIAN BERHAD
(COATING / PAINTING QAQC INSPECTOR)
PROJECT: FMC ITEMS, SHELL PRELUDE ITEMS & ETC
(FABRICATION OF SUB-SEA ITEMS)
APRIL 2013 TO AUGUST 2013
MODEC SINGAPORE (MOPS.SG)
(COATING / PAINTING QAQC INSPECTOR – GEN)
PROJECT: PYRENESS HULL REPAIR PROGRAMME FPSO & OSX-3 FPSO (CONVERSION)
DECEMBER 2012 TO APRIL 2013
MODEC SINGAPORE (MOPS.SG)
(COATING / PAINTING QAQC INSPECTOR – GEN)
PROJECT: MODEC VENTURE 11 FPSO
NOVEMBER 2011 TO NOVEMBER 2012
MALAYSIA MARINE & HEAVY ENGINEERING SDN BHD
(BLASTING AND PAINTING TECHNICAL EXECUTIVE QA/QC INSP)
PROJECTS: TELOK & TAPIS EXXONMOBIL & OSX3-EXTERNAL TURRET, SOFEC
APRIL 2011 TO NOVEMBER 2011
SRI JUBILEE ENGINEERING SDN.BHD.MY
(QA/QC INSPECTOR)
PROJECTS: FPSO CENDOR, MISC BERHAD & GUMUSUT KAKAP DEEPWATER PROJECT
AUGUST 2010 TO MARCH 2011
PEMBINAAN ANDAHSARI SDN.BHD
(QA/QC INSPECTOR)
JUNE 22-2009 TO JULY-29-2010
SEMBAWANG SHIPYARD (SEMBCORP MARINE)
(PIPE AND BOILER DEPT)
OCTOBER 2006 to 2008
PERKHIDMATAN AIR MOLEK
(SUPERVISOR@ QC INSPECTOR)