Resume:

Fekry Saad

Columbia, PA *****

717-***-****

***.****@*****.***

QUALIFICATIONS & SKILLS

Electrical Engineer and Technician with 25 years’ experience in electrical troubleshooting, installation, instrumentation and electro-mechanical maintenance

Experienced with troubleshooting electrical equipment including PLC’s, VFD’s, AC/DC motors, hydraulic systems, transformers, controls, starters, power distributions and control circuits

Ability to install and calibrate electrical equipment

Expert with running/bending of conduit, wiring electrical circuits, panel work and working within NEC regulations

DC/AC motors, generators, transformers, distribution panels and control panel installation, troubleshooting and wiring experience

Erection and maintenance for the Instrumentation & control devices, equipment, control panel and PLC’s

Experience with driveline components and fundamentals such as diesel engine theory, gearbox, bearing, and mechanical systems

Experience with lab test equipment and duty cycle development for driveline testing

Experience with data acquisition and analyzation concepts are preferred (HBM, National Instruments, and DEWEsoft)

The ability to execute tasks with minimal supervision and quickly learn new tools and techniques is required

Good computer skills. The candidate should be experienced personal computers and MS Office products

EDUCATION

Alexandria University; Alexandria, Egypt

1988

Bachelor of Science - Electrical Engineering

PROFESSIONAL EXPERIENCE

RR Donnelley

Electronic technician 3

Oct 2015 -Dec 2015 (Contract/Temporary)

troubleshooting electrical equipment including PLC’s, VFD’s, AC/DC motors, hydraulic systems, transformers, controls, starters, power distributions and control circuits

Erection and maintenance for the Instrumentation & control devices, equipment, control panel and PLC’s

IMI Material Handling Logistics

June 2015- July 2015 (Contract/Temporary)

Electrician in Bastian Solutions

Installing electrical apparatus (i.e.: switches, termination boxes, lights, photocells, control enclosures, etc.)

Bending and installing conduit to meet product requirements. (exp. With both Rigid and EMT)

Soldering electrical connectors.

Wiring sub-assemblies as well as completed product

R.S.REIDENBAUGH CORP.; Lititz, PA

April 2015- May 2015(Contract/Temporary)

Electrician in LGH Project

Assemble, install, test, and maintain electrical or communication wiring, equipment, appliances, apparatus, and fixtures, using hand tools and power tools.

Plainville Farm; New Oxford, PA

March 2015 – April 2015

Electrical Maintenance Technician

Troubleshooting and repairing of electrical, mechanical, pneumatic and hydraulic equipment

Maintaining AC/DC motors, controls, electronic equipment, etc.

Responsible for the routine preventative maintenance

SVZ Electric LLC; Lyman, SC

August 2014 – December 2014 (Contract/Temporary)

Electrician

Installing lighting fixtures, running and bending conduit, moving and re-routing electrical circuits, panel work and working regarding NEC standards

Harley Davidson Co.; York, PA

February 2014 - June 2014 (Contract/Temporary)

Assembler

Working on various stages of the assembly line

Conducting product inspections and quality control checks on finished products

International CO. for Foods; Alex, Egypt

August 2012 – November 2012

Engineering Manager

Managed the day-to-day operations of the Maintenance and IT teams/projects

Arabia Co. Real Estate (Bungalows Hotel & Resort); Egypt

July 2011 – July 2012

Electrical Project manager

Supervising and Coordinating the subcontractors to execute all the electrical maintenance on the site

Hands-on electrical troubleshooting and installing of wiring and controls

Rodex Plastic Co; Alex Egypt

January 2011 – March 2011

Electrical Maintenance Manager

Responsible for the Management, training and leading of the Maintenance team

Electrical troubleshooting and repairing of plastic processing equipment, burning equipment, PLC’s, controls, etc.

Egyptian for Projects & Trade Co; Egypt and Libya

July 2009 – August 2010

Projects Manager

Maintenance Project Manager for the Titan Cement Plant in Egypt and Libyan Cement Plant in Benghazi city Libya

Coordinated multiple electrical and engineering projects as Project Lead to ensure on-time and within budget completion

Project development, consultation research, documentation, submission and approval, design, scheduling, and construction

Strabag Co. (Vyksa Steel Factory); Russia

April 2008 – April 2009

Senior Electrical Engineer

Managing and planning the including work ensuring that the necessary skill and resources are in place

Supervision the erection of the equipment in the factory by Demag

Pioneer Co. IT and Computer Services Mina Plant; Alex, Cairo

2004 - 2008

Technical manager

Electromechanical maintenance management of cranes (PPM&POCLAIN)

IT system management

Software and hardware services for internet cafes

Controlling the testing and documents procedures for safety and qualification according to Bechtel Co procedures

design and lead fabrication of test fixtures, test control (automation) and data acquisition to support driveline and mechanical subsystem and component testing

International Naval Works Company; US, Middle East and Egypt

January 2003 – May 2003

Workshop Manager & Web Designer

Creating the qualified system for maintenance of HP & LP Compressors & umbilical, R.O.V Arab Swiss engineering company

Involve electro-mechanical sensor integration and test control programming.

Asec co. Egypt

Ameriyah Cement Company; Hellwan cement company Egypt

1992 - 2002

Electrical Engineer

Maintenance and calibration for electrical instruments and equipment throughout the facility

Performed troubleshooting and repairing of Schenck weighing equipment for raw mill feeders, cement mill feeders and kiln feed system

Instrumentation and measurement loops (flow, pressure, levels, temperature and interlock system) - On line gas analyzers (CO-02) (Kent, Thermox), Kiln firing equipment, hot gas generators and boilers control panels (Pillard); Sequential controllers regulating valves and dampers; Control desk and its measuring instruments (Controllers, recorders and indicators); Open and closed loop instrumentation circuits

Maintenance for the (Raw mill & Bypass & Kiln & Cooler & Cement) high tension EP filters and gravel bed filters (Lourgi & FLS)

Troubleshooting of the whole network of the programming logic controls PLC’s (Procontic DP 800 system, DP 1500 ( Data logger)

DC and AC ( Up to 2.7 MW) speed control panels and motors (BBC&ABB & ANSALDO)

Supervising the start–up and commissioning of the electrical equipment’s and distribution System

Electronics convertor and logic control panels

American Express Co.; Athens, Greece

1989 – 1991

Technical manager

Responsible for Central Antenna installation and maintenance

Power stations, general lighting networks, building and housing lighting and road lighting systems



Contact this candidate