Fekry Saad
Columbia, PA *****
***.****@*****.***
QUALIFICATIONS & SKILLS
Electrical Engineer and Technician with 25 years’ experience in electrical troubleshooting, installation, instrumentation and electro-mechanical maintenance
Experienced with troubleshooting electrical equipment including PLC’s, VFD’s, AC/DC motors, hydraulic systems, transformers, controls, starters, power distributions and control circuits
Ability to install and calibrate electrical equipment
Expert with running/bending of conduit, wiring electrical circuits, panel work and working within NEC regulations
DC/AC motors, generators, transformers, distribution panels and control panel installation, troubleshooting and wiring experience
Erection and maintenance for the Instrumentation & control devices, equipment, control panel and PLC’s
Experience with driveline components and fundamentals such as diesel engine theory, gearbox, bearing, and mechanical systems
Experience with lab test equipment and duty cycle development for driveline testing
Experience with data acquisition and analyzation concepts are preferred (HBM, National Instruments, and DEWEsoft)
The ability to execute tasks with minimal supervision and quickly learn new tools and techniques is required
Good computer skills. The candidate should be experienced personal computers and MS Office products
EDUCATION
Alexandria University; Alexandria, Egypt
1988
Bachelor of Science - Electrical Engineering
PROFESSIONAL EXPERIENCE
RR Donnelley
Electronic technician 3
Oct 2015 -Dec 2015 (Contract/Temporary)
troubleshooting electrical equipment including PLC’s, VFD’s, AC/DC motors, hydraulic systems, transformers, controls, starters, power distributions and control circuits
Erection and maintenance for the Instrumentation & control devices, equipment, control panel and PLC’s
IMI Material Handling Logistics
June 2015- July 2015 (Contract/Temporary)
Electrician in Bastian Solutions
Installing electrical apparatus (i.e.: switches, termination boxes, lights, photocells, control enclosures, etc.)
Bending and installing conduit to meet product requirements. (exp. With both Rigid and EMT)
Soldering electrical connectors.
Wiring sub-assemblies as well as completed product
R.S.REIDENBAUGH CORP.; Lititz, PA
April 2015- May 2015(Contract/Temporary)
Electrician in LGH Project
Assemble, install, test, and maintain electrical or communication wiring, equipment, appliances, apparatus, and fixtures, using hand tools and power tools.
Plainville Farm; New Oxford, PA
March 2015 – April 2015
Electrical Maintenance Technician
Troubleshooting and repairing of electrical, mechanical, pneumatic and hydraulic equipment
Maintaining AC/DC motors, controls, electronic equipment, etc.
Responsible for the routine preventative maintenance
SVZ Electric LLC; Lyman, SC
August 2014 – December 2014 (Contract/Temporary)
Electrician
Installing lighting fixtures, running and bending conduit, moving and re-routing electrical circuits, panel work and working regarding NEC standards
Harley Davidson Co.; York, PA
February 2014 - June 2014 (Contract/Temporary)
Assembler
Working on various stages of the assembly line
Conducting product inspections and quality control checks on finished products
International CO. for Foods; Alex, Egypt
August 2012 – November 2012
Engineering Manager
Managed the day-to-day operations of the Maintenance and IT teams/projects
Arabia Co. Real Estate (Bungalows Hotel & Resort); Egypt
July 2011 – July 2012
Electrical Project manager
Supervising and Coordinating the subcontractors to execute all the electrical maintenance on the site
Hands-on electrical troubleshooting and installing of wiring and controls
Rodex Plastic Co; Alex Egypt
January 2011 – March 2011
Electrical Maintenance Manager
Responsible for the Management, training and leading of the Maintenance team
Electrical troubleshooting and repairing of plastic processing equipment, burning equipment, PLC’s, controls, etc.
Egyptian for Projects & Trade Co; Egypt and Libya
July 2009 – August 2010
Projects Manager
Maintenance Project Manager for the Titan Cement Plant in Egypt and Libyan Cement Plant in Benghazi city Libya
Coordinated multiple electrical and engineering projects as Project Lead to ensure on-time and within budget completion
Project development, consultation research, documentation, submission and approval, design, scheduling, and construction
Strabag Co. (Vyksa Steel Factory); Russia
April 2008 – April 2009
Senior Electrical Engineer
Managing and planning the including work ensuring that the necessary skill and resources are in place
Supervision the erection of the equipment in the factory by Demag
Pioneer Co. IT and Computer Services Mina Plant; Alex, Cairo
2004 - 2008
Technical manager
Electromechanical maintenance management of cranes (PPM&POCLAIN)
IT system management
Software and hardware services for internet cafes
Controlling the testing and documents procedures for safety and qualification according to Bechtel Co procedures
design and lead fabrication of test fixtures, test control (automation) and data acquisition to support driveline and mechanical subsystem and component testing
International Naval Works Company; US, Middle East and Egypt
January 2003 – May 2003
Workshop Manager & Web Designer
Creating the qualified system for maintenance of HP & LP Compressors & umbilical, R.O.V Arab Swiss engineering company
Involve electro-mechanical sensor integration and test control programming.
Asec co. Egypt
Ameriyah Cement Company; Hellwan cement company Egypt
1992 - 2002
Electrical Engineer
Maintenance and calibration for electrical instruments and equipment throughout the facility
Performed troubleshooting and repairing of Schenck weighing equipment for raw mill feeders, cement mill feeders and kiln feed system
Instrumentation and measurement loops (flow, pressure, levels, temperature and interlock system) - On line gas analyzers (CO-02) (Kent, Thermox), Kiln firing equipment, hot gas generators and boilers control panels (Pillard); Sequential controllers regulating valves and dampers; Control desk and its measuring instruments (Controllers, recorders and indicators); Open and closed loop instrumentation circuits
Maintenance for the (Raw mill & Bypass & Kiln & Cooler & Cement) high tension EP filters and gravel bed filters (Lourgi & FLS)
Troubleshooting of the whole network of the programming logic controls PLC’s (Procontic DP 800 system, DP 1500 ( Data logger)
DC and AC ( Up to 2.7 MW) speed control panels and motors (BBC&ABB & ANSALDO)
Supervising the start–up and commissioning of the electrical equipment’s and distribution System
Electronics convertor and logic control panels
American Express Co.; Athens, Greece
1989 – 1991
Technical manager
Responsible for Central Antenna installation and maintenance
Power stations, general lighting networks, building and housing lighting and road lighting systems