RESUME
SIKELI KACIKILAGI
** ******* ******** ******** **** 4118 Brisbane
***********@*****.***
Professional Work Experience
I have been working as a Welder/ Boil ermaker for more than ten years I have gained
experience working on Site and workshop pipe spool manufacturing, on shore and off shore
Oil and Gas Stainless steel or Carbon steel, Fuel storage tanks, Marine vessel maintenance
and Mining Equipment repairs.
Qualifications
• Certificate III Engineering Fabrication trade [Heavy Fabrication]
• SGS NDT Testing ASME IX boiler and pressure vessel tested 6G
• Trade certificate in Welding and Fabrication [Fiji]
Work History
Eastcoast Development Engineering (DEC
MIL EDE.
July 2013 to Present
i.
6” Stainless pipeline Fabrication and GTAW Welding for HMAS ALBATROSS Nowra,
•
NSW
10” Steel Pipeline GTAW and MMAW Welding for Shell Pinkenba Brisbane, QLD.
•
• Fabricating and welding pipe spools for wellheads installations using GTAW, GMAW
and FCAW welding processes in all position / Murarrie and Rocklea Workshops.
• Building and welding of Fuel storage tanks for [Roy Hill] five months’ contract.
• Taloona Gas Plant[Roma] Nickel GTAW/MMAW welding of Gas pipelines. Three
months’ contract.
• Site Fabrication and Welding on Chinchilla Wellheads and Installation.
Purcell's Line boring & Engineering Ltd.
ii.
September 2012 to June 2013
• Fabricating, welding, maintenance and repairing of Mining Equipment
• Gladstone main water pipeline. All equipment and pipes was welded using GTAW,
GMAW and MMAW welding processes.
[NEL] Nitya Engineering[Fiji] Ltd.
iii
. September 2010 to August 2012
• Fabricating and welding of Aviation Fuel tanks and associated pipe spools using GTAW
and MMAW welding processes.
• Fabrication, welding and installation of a 1km 4" 8" wharf fuel supply pipeline and
bunker points using MMAW welding processes.
• Fabrication, welding and installation of 12" main pipeline from Oil Tanker point to Total
Oil Terminal[Fiji].
Design Engineering[Fiji]Ltd.
iv.
November 2007 to September 2010
• Fabrication, welding and installation of 6" 10" carbon steel fuel line using GTAW and
MMAW welding processes.
• Fabricate, weld and install of steam turbine pipe spools using GTAW and MMAW
welding processes.
• Steam boiler tubes and associated pipelines, welding and installation using GTAW and
MMAW welding processes.
CR Engineering
[Fiji] Ltd
v.
December 2002 to November 2005
• Fabricating,welding and installing structural steel for bridges,resorts and buildings
using GMAW and MMAW welding processes.
• Installing new steam boiler and welding associated pipe lines in plant room using
GTAW and MMAW welding processes.
• (2006 2007) 6 months contract steel structure fabrication and welding for Laucala
Island Resort
• (2008 2009)site leading hand 6 months contract steel structure fabrication and
installation for Tapoo City.
References
Harry Nemaia Andrew
Nunn
Site Supervisor Project
Engineer
Luke Thode Luke Gavin
Workshop Supervisor Workshop
Supervisor