PERSONAL PARTICULARS
Name : Duando Sianturi
Sex : Male
Place/ Date of Birth: Jakarta, 18 November 1986
Address : Perum Villa Mukakuning Blok C2 No.8, Sagulung Batam
Marital Status : Married
Religion : Christian
Height : 170 Cm
Weight : 65 Kg/ Excellent
Hobbies : Soccer, Music
Identity Card : 2171121811869004
I/E Date : 23 October 2012/ 18 November 2017
Passport No : B 0781699
I/ E Date : 27 Apr 2015 / 27 Apr 2020
Contact Number: +62-852********
Email Address : ****.********@*****.***
SUMMARY OF EXPERIENCE
Overthan 6 years experience in fabrication as QA/QC Engineer (Steel Structure & Pipe) for new building supply vessel, Barge, Barge Accommodation, MODU (Mobile offshore drilling unit), Jack up Rig & Floating Dock.
Started Carreer as Trainee Electronic Engineer at Facility Electrical Department at PT. Drydock World Pertama.
Carreer moved to Shipbuilding company as Asst Engineer QA/QC Department at PT. Nanindah Mutiara Shipyard.
A year become as Act Engineer QA/QC
Sept 2013 Being Tranfer to production (steel work department) as Engineer Steel Structure at PT. Graha Trisaka Industry a member of DDW Paxocean.
Become Lead QC Production for Controlling QC Inspector for Jack up Rig Project (L209 & G8001).
Excellent Knowledge of AWS D1.1, ASME IX, ASME B31.3, IACS 47, SRQS, ABS Rules & KR Rules.
Managed and successfully completed over 5 projects within 6 years.
EDUCATION
2005-2009 DIPLOMA in Electrical Engineer POLYTECHNIC BATAM
INDUSTRIAL SHORT COURSES
2012 API 570 (PIPING INSPECTOR COURSE) BATAM
2015 ISO 9001COURSE (AUDITOR) ABS SINGAPORE
2015 ISO 14001 COURSE (AUDITOR) ABS SINGAPORE
2015 ISO 18001 COURSE (AUDITOR) ABS SINGAPORE
WORKING EXPERIENCE
Periode : August 2015 - Present
Company : PT. SMOE (Supply manpower for Bechtel Oil & Gas Construction)
Type of Bussiness : Oil & Gas Construction
Designation : HFE Coordinator
Duties
Review all module (structural, Piping, Electrical, and Mechanical) by 3D model- SPR Program, prior to Field Identification/ Formal walk-down with Client.
Regularly walk through the Module Yard and onsite fabrication area reviewing structural, piping, equipment and modules to identify and document HFE non-conformances. These include the formal and informal walk-downs detailed in Section 5.
Schedule and lead the HFE walk-downs
Create, place and remove HFE tags. Ensure clear communication is kept with CVX HFE Specialist for this process
Maintain a register of HFE non-conformances and document each non-conformance with a report clearly identifying the non-conformance and its location for distribution to Module Yard field engineering and field supervision.
Ensure pre-existing SID Deviations and Risk Assessments do not apply to non-conformances identified in the yard.
Initiate the SID Deviation and Risk Assessment process per Attachment 1 when needed.
Issue reports detailed in Section 6.0 to support non-conformance resolution in the module yard and turnover of modules to site.
Communicate HFE non-conformances within the Module Yard, to the other Module Yards, Site and Project HFE Specialists to implement lessons learned and spread awareness of common non-conformances. The BOLO is one method of communicating this. Refer to Attachment 2 for an example of a BOLO.
Raise HFE concerns through the MYHFET, CSHFET and PHFET and coordinate resolution for closure of HFE issues.
Coordinate with RFEs to close HFE non-conformances and ensure project HFE standards are understood and implemented.
Liaise with AFEs and RFEs as needed to close non-conformance reports and field change documents related to HFE non-conformances.
Liaise with Project HFE Specialists to ensure compliance and proper interpretation of Australian, Project HFE and SID standards.
Schedule and provide HFE training for Company, Contractor and Sub-contractor personnel in the yard.
Organise and chair Weekly HFE Module Yard Meetings with responsible parties and CVX personnel.
Coordinated regularly with CVX HFE Specialist to review HFE TEAMWorks register and discuss about HFE concerns.
Project Handling :
Project : Wheatstone LNG Project
Client : Chevron Australia PTE.LTD
Periode : Apr 2015 – August 2015
Company : Paxocean Graha Trisaka Industri
Type of Bussiness : Shipbuilding,Jack Up Rig Offshore
Designation : QA Engineer
Duties
To control progress and status of structure Project Floating Dock (NP8001)
Plan and lead all QA/QC activities at fabrication workshop and erection work at site
Lead the inspection of all the welding and related actions according to the approved WPS, drawings, Company Specification and requirements
Monitoring the project to follow quality as per Codes, Standard and KR Classification Rules
Ensure all the work of fabrication, Assembly and Erection Block following the ITP Project (Inspection Test and Plan)
Supervise and adviser the subcontractors to work base on Quality, Drawing Construction, Safety regulation.
Ensure acceptable fit-ups including joint edge preparation and configuration
Conduct dimensional inspections as required for verifications.
Visually inspect and monitor welding operations (including grinding and back-gouging) and finished works
Determine use of appropriate NDT methods and evaluate test results.
Follow-up on non-conformance and corrective actions including administrative verification
Monitor repair rates of all welders so as to avoid excessive delays due to high rejection rates and recommend, through QA Engineer, for welder re-testing or replacement.
Ensure safety standards and requirements are observed and bring policy matters to attention of superiors
Project Handling :
Project : NP8001 Floating Dock
Owner : Heng wu
Classification Society: Korean Register (KR)
Periode : Sept 2013 – March 2015
Company : Paxocean Graha Trisaka Industri
Type of Bussiness : Shipbuilding,Jack Up Rig Offshore
Designation : Engineer Steel Structure (Senior QC Poduction)
Specialization for Quality controlling for fabrication, assembly & Erection block of Special case Material (Spudcan, Jackcase, Cantilever, Skidbeam). Which the material are Higher strength quenched and tempered steels (EQ 51, EQ 63, EQ 70) for ABS grade material, but unlisted steel in AWS code. And for LEG the material is A 514 which is 100 KSI grade. All these material are to be monitor from before, during & After welding due to, shall to take preheat prior to welding average 100-150 Celcius and control interpass temperature with range 100-200 Celcius refer to WPS that we adopting.
Duties
To control progress and status of structure Project G8001 and L209 (Jack up Rig)
Monitoring the project to follow quality as per Codes, Standard and ABS Classification Rules.
Ensure all the work of fabrication, Assembly and Erection Block following the ITP Project (Inspection Test and Plan).
Ensure the work of fabrication, Assembly and Erection Block following the guide line project (WPS, NDT Matrix)
Scantling the panels/ assembly block inline of Construction Drawing.
Attending daily VSCC meeting with project team.
Reporting to Steel Manager about update status/ progress project.
Supervise and adviser the subcontractors to work base on Quality, Drawing Construction, Safety regulation.
Monitoring progress compartment refer to Base metal and thickness according to WPS
Cooperate with and assist CONTRACTOR and others, where possible, in the achievement of quality goals.
Review electrode selection, storage and maintenance.
Monitor, verify or check supplies and materials (including grinding and back-gouging) to be welded and the type of weld to be produced.
Ensure acceptable fit-ups including joint edge preparation and configuration.
Conduct dimensional inspections as required for verifications.
Visually inspect and monitor welding operations (including grinding and back-gouging) and finished works.
Determine use of appropriate NDT methods and evaluate test results.
Follow-up on non-conformance and corrective actions including administrative verification
Monitor repair rates of all welders so as to avoid excessive delays due to high rejection rates and recommend, through QA Engineer, for welder re-testing or replacement.
Ensure safety standards and requirements are observed and bring policy matters to attention of superiors.
Project Handling :
Project : G8001 & L209 (Jack up Rig Offshore)
Owner : OSM (Offshore and Ship Management)
Classification Society: American Bureau of Shipping (ABS)
Periode : Jan 2013 – Sept 2013
Company : PT. NANINDAH MUTIARA SHIPYARD
Type of Bussiness : Shipbuilding and Repair (Marine Industry)
Designation : Acting QA/QC Engineer
Duties
Ensure that work carried out complies with International Construction Codes, Project Specification, Tender, Work Instruction, Procedure and manual as appropriate.
Completing and maintaining inspection records
Interpretation of Drawings and Specification
Monitor project welding quality
Witness welding procedure qualification and welder performance tests.
Maintain records on test, evaluation and measurements.
Participate in the resolution of the quality problems as directed by QA Engineer.
Maintain records of works performed within assigned responsibility and ensure quality of material used, verify qualification of personnel performing the work, ensure approved methods are used, ensure advance warnings of possible problem areas of items is provided to the QA
Monitoring the inspection (before welding, during welding and after welding) coverage according project ITP.
In-charge of project NDT records, material certificate summary update
Observance and monitoring of recommended safety guidelines
Project Handling :
Project T-218 & T-219 (81 M Platform Offshore Supply Vessel)
Owner : POSH (Pac Ocean Offshore)
Classification Society: American Bureau of Shipping (ABS)
Periode : Oct 2012 – Jan 2013
Company : PT. AIPEKO JAYA
Type of Bussiness : Supply manpower shipbuilding/ marine industry
Designation : QC Engineer
Duties:
Ensure that work carried out complies with International Construction Codes, Project Specification, Tender, Work Instruction, Procedure and manual as appropriate.
Completing and maintaining inspection records
Interpretation of Drawings and Specification
Monitoring the inspection (before welding, during welding and after welding) coverage according project ITP.
In-charge of project NDT records, material certificate summary update
Observance and monitoring of recommended safety guidelines
VISUAL INSPECTION:
* Observe, identify, measure and record the features of the weld.
* Decide whether the weld is acceptable in terms of the particular levels that are permitted
INSPECTION BEFORE WELDING:
Quality plan is authorised and endorsed with signature, date and company stamp.
* Application standard is up to date with the latest edition, revision or amendment.
* The drawings are clear, the issue number is marked and the latest revision is used.
* Welding procedure sheets (specifications) are available, have been approved and are
employed in production.
* Welder qualifications with identification and range of approval are verified and that only approved welders as required are employed in production.
* Calibration certificates, material certificates (mill sheets) and consumer certificates are available and valid.
* Parent material identification is verified against documentation and markings.
* Material composition, type and condition.
* Correct methods are applied for cutting and machining.
* Identification of welding consumables such as electrodes, filler wire, fluxes, shielding and backing gases and any special requirements (e.g. drying) are met.
* Plant and equipment are in a safe condition and adequate for the job.
* Safety permits e.g. hot work permit, gas free permit, enclosed space certificate are
available and valid.
INSPECTION DURING WELDING
* Preheat and interpass temperatures must be monitored.
* Interpass cleaning – chipping, grinding, gouging, must be monitored.
* Root and subsequent run sequence.
* Essential variables such as current, voltage, travel speed to be monitored.
* Filler metals, fluxes and shielding gases are correct.
* Welding is in compliance with weld procedure sheet and application standard.
INSPECTION AFTER WELDING
* Dimensional accuracy to be ascertained.
* Conformity with drawings and standards requirements.
* Post weld heat treatment, if any, monitored and recorded.
* NDT carried out and reports assessed.
* Assess defects as to either repairing, or application for concession.
* Carry out any necessary repairs.
* Control of distortion
REPAIRS
* Repair procedure and welding code should be authorised.
* Defect area should be marked positively and clearly.
* Check when partially removed and fully removed (visual and NDT).
* Re-welding should be monitored.
* Re-inspect completed repair.
Project Handling :
Project T-218 & T-219 (81 M Platform Offshore Supply Vessel)
Owner : POSH (Pac Ocean Offshore)
Classification Society: American Bureau of Shipping (ABS)
Periode : Sept 4, 2012 – Sept 30, 2012
Company : PT. ASL SHIPYARD INDONESIA
Type of Bussiness : Shipbuilding & Repair (Marine Industry)
Designation : QA/QC INSPECTOR
Duties:
Survey the Hull/ Structural of vessel with Client & Classification Surveyor
Review the ITP project
Mapping the area which one will be renew./ re-plating
Organize manpower
Attending daily meeting project
Patrol and identify the welder qualification
Interpretations of drawing and specification
Maintain the inspection work carried out with the rules/ codes requirement
Monitoring the inspection (before welding, during welding and after welding)
Traceability material and the certificate
Project Handling :
Project: Rig Atlantic London
Rig Type: Jack Up
Owner : Atlantic Marine Services
Classification Society: DNV (Det Norske Veritas)
Periode : Jan 2012 – Aug 2012
Company : PT. MENASA SAMUDERA
Type of Bussiness : Supply Manpower at PT. Nanindah Mutiara Shipyard
Designation : QC ENGINEER
Duties:
Ensure that work carried out complies with International Construction Codes, Project Specification, Tender, Work Instruction, Procedure and manual as appropriate.
Completing and maintaining inspection records
Interpretation of Drawings and Specification
Monitoring the inspection (before welding, during welding and after welding) coverage according project ITP.
In-charge of project NDT records, material certificate summary updateObservance and monitoring of recommended safety guidelines
Conformity with drawings and standards requirements, Destructive testing (chemical, mechanical, hardness testing), control of distortion, Marking for acceptance or rejection.
Inspections leaking test such as: air test, hose test, vacuum test.
Project Handling :
Project T-217 (84 M Compact Semi-Submersible Offshore Vessel)
Owner : Hallin Marine
Classification Society: American Bureau of Shipping (ABS)
Periode : Dec 2009 – Dec 2011
Company : PT. NANINDAH MUTIARA SHIPYARD (Member of Drydocks World)
Type of Bussiness : Marine Industry
Designation : Asst QA/QC ENGINEER
Key Responsibility:
Ensure that work carried out complies with International Construction Codes, Project Specification, Tender, Work Instruction, Procedure and manual as appropriate.
Conduct inspection reports and maintain the inspection status summary.
Monitoring the inspection (before welding, during welding and after welding) coverage according project
ITP.In-charge of project NDT records, material certificate summary update.
Duties:
Monitoring project on before welding pre-assembly such as: check all applicable documents, make sure updated a latest revision drawing, welder qualification with identification, dimensions, preparation, fit up and alignment.
Monitoring inspection during welding such as: check welding process, preheat and interpose temperature.
Monitoring inspection after welding such as : check visual inspection to be carry out to ascertain acceptability, conformity with drawings and standards requirements, NDT carry out and report assessed, control of distortion.
Inspections leaking test such as: air test, hose test, vacuum test, hydro test
Project Handling :
1.Project T-209 & T-210 (76 M Anchor Handling/ Offshore Support Vessel)
Owner : Seaspec Marine Service P/L
Classification Society: American Bureau of Shipping (ABS)
Periode : Oct 2008 – Nov 2009
Company : PT. DRYDOCKS WORLD PERTAMA
Type of Bussiness : Shipbuilding & Marine Industry
Designation : Trainee Electronic Engineer
Duties:
Make a daily report equipment breakdown
Monthly report about status, location, condition of equipment (welding machine, blower and distribution panel)
Handling to provide loaning equipments with subcontractors that are needed for ship repair and ship building
Handling to make preventive maintenance schedule for equipments
Responsible to check and monitor process maintenance and repair equipments
I declare that information given above is complete, true and accurate. Any false particulars or suppression of material facts will render me liable to disqualification and if appointed to dismissal without notice from your company.
Sincerely Yours
Duando Sianturi